Ssr Mining Inc. · NASDAQ:SSRM

Ssr Mining — Silver Standard Resources — Investor Presentation (April 2015)

36 slides from Ssr Mining's investor presentation, Apr 13, 2015

  1. Slide 1: Right Company, Right Time

    RIGHT COMPANY, RIGHT TIME April 2015 Corporate Presentation SSRI:NDAQ | SSO: TSX 1

  2. Slide 2: Cautionary Notes

    Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking information” within the meaning of Canadian securities laws and “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively

  3. Slide 3: Why Silver Standard?

    Why Silver Standard? ASSETS CAPITAL MANAGEMENT Free cash flow Increased cash Experienced team balance to $185M Two large mines In-country expertise $105M in marketable Focused portfolio securities Deliver to plan Strong operating performance & free cash flow SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX

  4. Slide 4: Operating Highlights

    Operating Highlights Marigold mine Pirquitas mine  Record production of 67Koz in  Record annual production of Q4 2014 8.7Moz in 2014  Continued strong production  Record quarterly production of with 56Koz in Q1 2015 2.7Moz in Q1 2015  Decline in costs due to higher  Lower costs due to positive

  5. Slide 5: Strong Liquidity Position

    Strong Liquidity Position Cash & Marketable Securities as Percentage of Market Capitalization 80% 75% 61% 60% 52% 50% 43% 43% 40% 24% 22% 20% 18% 18% 16% 16% 12% 10% 5% 0% SSRI GSS ASR AGI CDE IAG PAAS AR HL MND FSM EXK AUQ AG PPP $290M CASH & MARKETABLE SECURITIES $265M CONVERTIBLE NOTES Note: Cash

  6. Slide 6: Undervalued Relative to Peers

    Undervalued Relative to Peers 18.0x AG 15.0x 2015E EV/EBITDA HL 12.0x AGI AUQ PAAS 9.0x PPP FSM 6.0x AR SSRI GSS 3.0x ASR 0.0x 0.5x 1.0x 1.5x 2.0x 2.5x 3.0x 3.5x 2015E P/NAV (5% at Spot Price) Source: Scotiabank GBM estimates; FactSet. As at April 6, 2015. SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 6

  7. Slide 7: Compelling Value Opportunity

    Compelling Value Opportunity 2015E Price to Cash Flow 39.1x 28.2x 20.0x 14.5x 13.0x 11.1x 10.7x 10.0x 9.4x 2015E Median 7.3x 6.7x 6.1x 4.5x 4.4x 3.2x 3.1x 0.0x PAAS AGI AUQ FSM HL EXK AG MND ASR PPP AR SSRI IAG GSS SSRI is undervalued compared to peer group Source: BMO Capital Markets. As at March 3

  8. Slide 8: Properties, Projects and Production

    Properties, Projects and Production 10 1 8 7 7. Candelaria 11 3 9 1. Marigold 8. Maverick Springs 5. Diablillos 3. Pitarrilla 9. San Marcial 2. Pirquitas 6. Berenguela 4 4. San Luis 6 10. Sunrise Lake 2 5 11. Parral + $570M SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 8

  9. Slide 9: Marigold: Established Gold Mine

    MARIGOLD ESTABLISHED GOLD MINE SSRI:NDAQ | SSO: TSX 9

  10. Slide 10: Our Second Operating Mine

    Our Second Operating Mine  Open pit, run-of-mine heap leach operation  Conventional truck and shovel equipment  Gold doré Twin Creeks Goldstrike MARIGOLD Maverick Springs  Continuous operation since 1988 Phoenix Cortez Carlin Trend  Strong safety and environmental practices Battle Mountain- Eur

  11. Slide 11: Mineral Reserves and Resources

    Mineral Reserves and Resources Probable Mineral Marigold Cross-Section Reserves Mackay Pit N  2.32 Moz of gold  0.49 g/t gold Illustrative potential pit shell Indicated Mineral Red Dot Resources Resource  4.16 Moz of gold  0.51 g/t gold Long history of resource to reserve conversion Note: See “C

  12. Slide 12: Invested $160M in 2012 and 2013

    Invested $160M in 2012 and 2013 Shovel Capacity Hauling Capacity Haul Truck Maintenance (Cubic Yards) (Tonnes) (Hours) 150 5,000 20 Maintain Wash 18 Trucks 100 3 Shovels 12 Trucks 2,500 2 Shovels 10 50 0 0 0 2012 2014 2012 2014 2012 2014 Increases Efficiency Lowers Costs SSRI:NASDAQ SSRI:NDAQ ||SSO:

  13. Slide 13: Operational Excellence: Loading Capacity

    Operational Excellence: Loading Capacity Rope Shovel Availability +41% Rope Shovel Utilization 100% 90% +18% 90% 80% 80% 70% 70% 60% 60% 50% 50% Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2014 Q2 2014 Q3 2014 Q4 2014 Tonnes Moved per Day Rope Shovel Cost per Tonne 210 +16% $0.20 Loaded 190 $0.16 (37)% 170 $

  14. Slide 14: Operational Excellence: Long-term Cost Savings

    Operational Excellence: Long-term Cost Savings $2.00 $1.92 Cost per Tonne Mined $1.74 $1.70 $1.61 $1.62 $1.50 $1.50 $1.00 2013 Q1 2014 Q2 2014 Q3 2014 Q4 2014 LOM Savings of 1₵ cost per tonne mined = $700,000 annually Note: Annual savings of $700,000 based on assumption of 70 million tonnes of mater

  15. Slide 15: Production Growth at Lower Cost in 2015

    Production Growth at Lower Cost in 2015 Gold Production Cash Cost per Ounce Capitalized Stripping (Koz) of Gold Sold ($/oz) ($M) 160 - 175 $29 $838 $900 $725 - $800 $30 $25 150 130 $600 $20 100 $300 $10 50 0 $0 $0 2014 2015 2014 2015 2014 2015 Guidance Guidance Guidance Increasing margins and free c

  16. Slide 16: Marigold Going Forward

    Marigold Going Forward  Operational excellence to drive costs down  Add oxide Mineral Reserves through drilling  Explore depth for sulphide mineralization Focused on lowering costs and increasing reserves SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 16

  17. Slide 17: Reserve Conversion and Resource Discovery

    Reserve Conversion and Resource Discovery Reserve Pit  Added reserves at Mackay pit in Resource Shell 2014 … expect trend to continue (2 )  Better than average reserve gold grade at 8 South  8 South expected to contribute 500 feet Cross-section A – A’ N new Mineral Resources Q4 2015 Reserve Pits

  18. Slide 18: Pirquitas: Large Open-Pit Silver Mine

    PIRQUITAS LARGE OPEN-PIT SILVER MINE SSRI:NDAQ | SSO: TSX 18

  19. Slide 19: Proven Capability and Delivery

    Proven Capability and Delivery  100% owned and operated silver and zinc mine  2010: Invested capital  2011/12: Delivered predictable production Pirquitas Mine Jujuy, Argentina  2013: Improved cost structure, completed push back  2014: Repositioned on cost curve, record annual production Diablil

  20. Slide 20: Exploration Emphasis at Pirquitas

    Exploration Emphasis at Pirquitas 2015 Exploration Goals  Progress San Miguel underground to Feasibility San Miguel Open Pit  Continue exploring surface targets for Mineral Resources  Permit two additional properties in the area Acquired exploration access in 2014 Increasing mine life at Pirquita

  21. Slide 21: Actively Managing Costs Down for Long Term

    Actively Managing Costs Down for Long Term $19.70 Cash costs per payable $16.88 ounce of silver sold $12.87 $11.50 – $12.50 $12.08 2011 2012 2013 2014 2015 Guidance Note: Cash costs are a non-GAAP financial measure. Please see "Cautionary Note Regarding Non-GAAP Measures” in this presentation. Infor

  22. Slide 22: Strong Cash Flow Generation in 2015

    Strong Cash Flow Generation in 2015 Silver Production Cash Cost per Ounce Capex & Capitalized (Moz) of Silver Sold ($/oz) Stripping ($M) 9.0 - 10.0 $12.08 $11.50 - $12.50 $23 8.7 $20 8.0 $10 $10 4.0 $5 $10 0.0 $0 $0 2014 2015 2014 2015 2014 2015 Guidance Guidance Guidance Increased production and lo

  23. Slide 23: San Luis: Dual Option to Value

    San Luis: Dual Option to Value Ancash Region, Peru  Going forward N  Pursuing community agreements  Already secured Ecash  EIA Community  Feasibility study Ayelén Vein San Simon Vein Bonita Zone Cochabamba 3 km Community SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 23

  24. Slide 24: Pitarrilla: Large Option

    Pitarrilla: Large Option Parral Mining District  Open pit project Chihuahua  Conventional flotation and leaching Pitarrilla Project Durango  695 Moz silver Mineral Resources Mexico (Measured and Indicated)  Redefining way forward  Continued exploration of land position  Water moratorium One of

  25. Slide 25: Strong Technical and Commercial Experience

    Strong Technical and Commercial Experience Management Team John Smith Gregory Martin Alan Pangbourne John DeCooman President, CEO SVP and Chief SVP, Operations VP, Business Development and Director Financial Officer and Strategy Nadine Block Kelly Stark-Anderson Jon Gilligan Ed Kirwan Bruce Huber VP

  26. Slide 26: Why Silver Standard in 2015

    Why Silver Standard in 2015  Capable  Corporate level management team free cash flow  Focus on operational  Strong balance excellence sheet  Maintain cost  Strategy for discipline organic and M&A growth SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 26

  27. Slide 27: Appendix

    (2) Authentic SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 27

  28. Slide 28: Mineral Reserves

    Mineral Reserves (as at December 31, 2014) Mineral Reserves Location Tonnes Silver Gold Zinc Silver Gold millions g/t g/t % million oz million oz Proven Mineral Reserves San Luis Peru 0.06 604.5 28.3 1.1 0.05 Total 1.1 0.05 Probable Mineral Reserves Pirquitas Argentina 5.37 220.10 0.47 38.0 Pirquita

  29. Slide 29: Mineral Resources: Measured and Indicated

    Mineral Resources: Measured and Indicated (as at December 31, 2014) Mineral Resources Location Tonnes Silver Gold Lead Zinc Copper Silver Gold millions g/t g/t % % % million oz million oz Measured Mineral Resources (Inclusive of Proven Mineral Reserves) Pitarrilla Mexico 20.30 95.40 62.3 San Luis Pe

  30. Slide 30: Mineral Resources: Inferred

    Mineral Resources: Inferred (as at December 31, 2014) Mineral Resources Location Tonnes Silver Gold Lead Zinc Copper Silver Gold millions g/t g/t % % % million oz million oz Inferred Mineral Resources Pirquitas UG Argentina 2.85 174.0 3.61 15.9 Marigold U.S. 18.20 0.44 0.26 Pitarrilla Mexico 22.10 6

  31. Slide 31: Reserves & Resources: Notes to Tables

    Reserves & Resources: Notes to Tables All estimates set forth in the Mineral Reserves and Mineral Resources tables have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). The estimates of Mineral Reserves and Mineral Resources fo

  32. Slide 32: San Luis Project

    San Luis Project San Luis Feasibility Study Results (June 2010)  3.5-year life: Underground mine  Avg. annual 1.9M oz Ag production: 78,000 oz Au  Cash cost: $313 / oz Au  Resources (M+I): 9.0M oz Ag at 578.1 g/t 0.35M oz Au at 22.4 g/t  Capital: $90 -$100M  Mill throughput: 400 tpd  NPV: $39

  33. Slide 33: Marigold Site Overview

    Marigold Site Overview Plant and Administrative Facilities N (2) Leach Pads Terry Pit Mackay Pit Target Pit Basalt – Antler Backfilled Pit 1 km SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 33

  34. Slide 34: Marigold 2014 Drilling Results

    Marigold 2014 Drilling Results (2) Note: See news release dated October 15, 2014 for selected drillhold highlights and reference data for the Marigold exploration drill program. SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 34

  35. Slide 35: Notes

    Notes SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 35

  36. Slide 36: Corporate Presentation

    CORPORATE PRESENTATION SSRI:NDAQ | SSO: TSX 36

Silver Standard Resources — Investor Presentation (April 2015) on 6ix