Dlp Resources, Inc. · TSXV:DLP

Dlp Resources — Investor Presentation (June 2024)

25 slides from Dlp Resources's investor presentation, June 2024

  1. Slide 1: Discovering the next Cu-Mo Porphyry Giant in the Central Andes

    DLP RESOURCES INC. Discovering the next Cu-Mo Porphyry Giant in the Central Andes TSXV: DLP OTCQB: DLPRF June 2024

  2. Slide 2: Cautionary Note Regarding Forward Looking Statements

    C A U T I O N A R Y N O T E R E G A R D I N G F O R W A R D L O O K I N G S TAT E ME N T S Certain information contained in this document may be forward-looking statements or forward-looking information (referred to as “forward-looking statements”). Forward-looking statements are often, but not alwa

  3. Slide 3: Aurora: Discovering the Next Cu-Mo Porphyry Giant

    DLP RESOURCES INC. AURORA: DISCOVERING THE NEXT Cu-Mo PORPHYRY GIANT • Initial drilling indicates world class size and high-grade Cu-Mo system starting at surface • Intersected Cu-Mo-Ag in all 13 holes drilled to date – with world class continuity • Rig capacity constrained - holes bottom at 1000m i

  4. Slide 4: Highly Experienced Team

    DLP RESOURCES H I G H L Y E X P E R I E N C E D TEAM Ian Gendall Jim Stypula Directors Advisors Richard Zimmer – Chair of Ascot C E O & P R E SI D E N T E X E C U T I V E C H A I R MA N Resources and was CEO of Farwest Derek 32+ YEARS EXPERIENCE 30+ YEARS EXPERIENCE Mining prior to acquisition by Ca

  5. Slide 5: Large Cu-Mo-Ag Porphyry

    DLP RESOURCES INC. Open AURORA: DISCOVERING THE NEXT Cu-Mo PORPHYRY GIANT Open Large Cu-Mo-Ag Porphyry Indicated-Size? A23-004 A23-006 • Dimensions to date – 1100mx950mx1000m but remains open in all directions with mineralization starting at surface 950m • Holes drilled to maximum capacity of drill

  6. Slide 6: Aurora: Excellent Address

    Aurora DLP RESOURCES INC. AURORA: DISCOVERING THE NEXT Cu-Mo PORPHYRY GIANT • Excellent address – on northern end of underexplored Miocene Cu-Mo porphyry belt • Nearby access to water • Elevation 2,000 - 3,800 masl. • Excellent community relations TSXV: DLP. OTCQB: DLPRF 6

  7. Slide 7: Aurora: Location and Access

    DLP RESOURCES INC. Aurora AURORA: DISCOVERING THE NEXT Cu-Mo PORPHYRY GIANT • 60 km north of Cusco, Peru • Easy road access via paved and dirt roads • Power to Parobamba (edge of property) • Large property - 8,100 Ha (100% DLP) + 400 Ha (option) To Cusco TSXV: DLP. OTCQB: DLPRF 7

  8. Slide 8: Community First - Parobamba

    DLP RESOURCES INC. COMMUNITY F I R S T - PAROBAMBA • Phase 1 IBA completed • Phase 2 IBA updated & finalized. DLP employs 20-26 people on a rotation basis Over 160 people were employed on last drill program TSXV: DLP. OTCQB: DLPRF 8

  9. Slide 9: Cu-Mo Porphyry Exploration Model

    Cu-Mo Porphyry Exploration Distinctly zoned Cu-Mo (+/- Au-Ag) Systematic Mo ( C u ) PORPHYRY - MODEL metal vector(s) / geometry Systematic (Global Depos it C harac teris tic s , US GS ) weathering / alteration geometry A r c - r e l a t e d P o r p h y r y Mo l y b d e n u m ■ Alkali- felds par R hy

  10. Slide 10: 2023 Drill Results – CuEq

    DLP RESOURCES INC. 2023 Drill Results – CuEq Open Open A23-013 A23-010 0.3% CuEq Grade Shell Open 773m 0.82% CuEq A23-011 A23-004 Open A23-006 250 metres Open Open 460m Open 618 m 1.01% CuEq COPPER Equivalent Intercepts CuEq (%) 0.94% CuEq A23-004 - 701 m (from 0 m) 0.92% A23-006 - 618 m (from 91 m)

  11. Slide 11: 2023 Drill Results – Copper

    DLP RESOURCES INC. 2023 Drill Results – Copper AURORA Open Open A22-003 A23-013 A23-004 A22-001 A22-001 A23-010 Surface A22-003 Sample A23-013 Open A23-004 A23-010 125m 0.43% Cu 4.65g/t Ag Open Open 222m 0.46% Cu 0.2% Cu 5.88g/t Ag Open 152m 123m 0.38% Cu Open 218m 0.49% Cu 4.13g/t Ag COPPER (Ag) Zo

  12. Slide 12: 2023 Drill Results – Molybdenum

    DLP RESOURCES INC. 2023 Drill Results – Molybdenum AURORA Open Open A23-005 A23-004 A23-013 A23-010 A23-006 Surface A23-013 Sample A23-004 Open A23-005 0.2% Cu A23-006 A23-010 Open 460m 388m Open 0.18% Mo 0.21% Mo 451m 221m 0.19% Mo 0.26% Mo MOLYBDENUM Zone Mo (%) 199m Open A23-004 - 198.9 m (from 5

  13. Slide 13: Aurora Project 2024 Exploration

    AURORA PROJECT 2024 EXPLORATION 10,000 metres  Drill test new CuOx Outcrop Zone in NE and SE  Expand mineralization at depth and along strike  Grow near surface Cu footprint  Resource estimate Q1 – 2025  Metallurgical testwork underway – results Q2, 2024 13

  14. Slide 14: Aurora Porphyry Project - Summary

    AURORA PORPHYRY PROJECT - SUMMARY DISCOVERING THE NEXT Cu - Mo GIANT  Current Dimensions (after only 13 holes)  1,100m x 950m x 1,000m  Deepest holes ended in mineralization  World class* molybdenum grades (>0.20%)  A23-013 700-850m: 150m >0.30% Mo  A23-004 500-700m: 200m >0.25% Mo  A23-005 4

  15. Slide 15: Capital Structure

    DLP RESOURCES INC. CAPITAL STRUCTURE Institutions TS XV: DLP ~8% OTC QB: D L P RF Founders/BoD Retail ~60% Shares (basic) 120,757,365 ~32% Warrants 33,917,562 Options 3,146,860 RSU’s 1,260,650 PSU’s 314,000 DSU’s 1,162,795 Shares (FD) 160,559,232 Market Cap (C$M) 53 Cash (C$M) $6.40 As of May 2024 T

  16. Slide 16: Aurora Earn-In Agreement

    AURORA E A R N - I N A G R E E ME N T MAY 2021 Y EA R 1 (2022) YEA R 2 (2023) Y EA R 3 (2024) Y EA R 4 (2025) Sign Agreement US$ 150,000 Cash  US$ 175,000 Cash  US$ 275,000 Cash US$ 2,325,000 Cash Private Peruvian Group  US$ 400,000 Work  US$ 550,000 Work  US$ 800,000 Work  US$ 1,250,000 Work

  17. Slide 17: Esperanza Cu-Mo Project

    ESPERANZA Cu-Mo PROJECT • The new grassroots 4,600 Ha Esperanza Cu-Mo project is located ~35 km SW of the Cerro Verde Mine in Arequipa, and less than 10 km south of E29’s Flor de Cobre Project and 10 km NE of the Candente Arikepay porphyry copper-gold project. • Copper oxide mineralization and ferri

  18. Slide 18: Esperanza Cu-Mo Project

    ESPERANZA Cu-Mo PROJECT TSXV: DLP. OTCQB: DLPRF 18

  19. Slide 19: Appendix Slides

    DLP RESOURCES INC. #201 – 135 – 10TH AVE. S., CRANBROOK, B C V1C 2N1 Please contact us at dlpresourcesinc.com APPENDIX SLIDES TSXV: DLP OTCQB: DLPRF 19

  20. Slide 20: Clean Energy Transition (Mineral Intensity)

    C L E A N E N E R G Y T R A N S I T IO N ( MI N E R A L I N T E N S I T Y ) LT Copper Demand Growth (1DS, ICA) Copper and Molybdenum are Classified as Cross-Cutting Minerals Copper Demand Molybdenum Demand 3.0% Forecast (pa) 2020-2030 35 900 800 30 700 25 600 Tons (Thousands) Tons (million) 20 500 F

  21. Slide 21: Molybdenum Supply Tightening

    MOLYBDENUM S U P P L Y T I G H T E N I N G Supply Deficits (S&P Global Commodity Insights, Feb 2023) There have been four price spikes of $4 /kg or more in a single trading day since October 2022, with the market describing this period of historic high prices as "a perfect storm". Some observers bel

  22. Slide 22: Molybdenum Demand Growing

    MOLYBDENUM DEMAND G R O W I N G ( 2 0 2 1 - 2 0 3 0 ) TSXV: DLP. OTCQB: DLPRF 22

  23. Slide 23: Aurora Project History

    2001 2005 2 0 1 2 -15 2 0 2 2 - 23 2024 6 Shallow Holes 7 Shallow Holes Ian Gendall Project Review 13 Holes (9,900 m) Permit for 32 Drill sites Bear Creek (D. Lowell) Vena Resources with Focus Ventures DLP Resources Re-start drilling Q2 Deepest – 604 m Recognize Cu-Mo porphyry Discovery Significant

  24. Slide 24: 2023 Drill Program - Drill Comps - Market Cap

    2023 – D RILL PROGRAM D R I L L C O MP S – MA R K E T C A P Aurora DDH A23- 013:GradeXthic knes s (634) 10,000 m completed – New Mo Discovery 1600 Mcap - C$196M Significant high-grade mineralized footprint established 1400 1200 ATX Mineralization remains open and improving at depth FIL Mcap - C$2,83

  25. Slide 25: Aurora New Targets – CuOx + BX Showings

    NEWAURORA NEW TARGETS – CuOx + BX SHOWINGS TARGET S– CuOx + BX SHOWIN GS TSXV: DLP. OTCQB: DLPRF 25

DLP Resources — Investor Presentation (June 2024) on 6ix