Tesmec S.p.a. · MIL:TES

Tesmec — European Midcap Event 2025

54 slides from Tesmec's conference presentation, Jun 11, 2025

  1. Slide 1: European Midcap Event

    EUROPEAN MIDCAP EVENT Paris I June 11th, 2025 1

  2. Slide 2: European Midcap Event agenda

    EUROPEAN MIDCAP EVENT 1 TESMEC GROUP 2 BUSINESS UNITS 3 FINANCIALS 4 2025 BUSINESS GUIDELINES 5 ANNEX All rights reserved EUROPEAN MIDCAP EVENT 2 June 11th, 2025

  3. Slide 3: Tesmec at a Glance

    TESMEC AT A GLANCE All rights reserved EUROPEAN MIDCAP EVENT 3 June 11th, 2025

  4. Slide 4: Our Vision, Our Mission

    OUR VISION OUR MISSION FOR THE FUTURE FOR THE PLANET COMMITTED TO ENERGY TRANSITION, DIGITALIZATION AND ELECTRIFICATION Technology partner in markets driven by energy transition, digitalization and sustainability with INNOVATIVE, ADDED-VALUE INTEGRATED SOLUTIONS for the construction, maintenance and

  5. Slide 5: Italian DNA, Global Footprint

    16 SALES SUBSIDIARIES 7 PRODUCTION PLANTS ITALY: Grassobbio, Sirone, Monopoli, Fidenza, Patrica ITALIAN USA: Alvarado; FRANCE: Durtal DNA, GLOBAL FOOTPRINT 70+ YEARS OF EXPERIENCE 35+ PATENTS DEVELOPED 900+ EMPLOYEES WORLDWIDE TESMEC GROUP HEADQUARTERS BERGAMO, ITALY Founded in northern Italy in the

  6. Slide 6: History of Innovation, Diversification & Growth

    HISTORY OF INNOVATION, DIVERSIFICATION & GROWTH All rights reserved EUROPEAN MIDCAP EVENT 6 June 11th, 2025

  7. Slide 7: Energy ready to unleash energy in all its shades

    ENERGY-STRINGING ENERGY-AUTOMATION READY • Solutions for power lines • Telecommunications solutions for HV Grids TO UNLEASH construction & maintenance • Advanced methodologies for • Grid Management: protection and metering solutions ENERGY automating jobsite • Advanced sensors for fault passage • Ze

  8. Slide 8: Tesmec Group Technological Developments

    TESMEC GROUP TECHNOLOGICAL DEVELOPMENTS STRINGING OF LAYING OF LAYING OVERHEAD CABLES SYSTEMS FOR ENERGY ELECTRIC CABLES UNDERGROUND CABLES FOR RAILWAY NETWORKS ELECTRICAL SUBSTATIONS THE COMMON THREAD OF OUR HISTORY ENERGY 1984 | TRENCHERS 2017 | AUTOMATION 2012 | RAILWAY • Systems and devices • In

  9. Slide 9: Drivers: Innovation, Diversification & Growth

    TESMEC ADDED-VALUE SOLUTIONS AND MONITORING STRATEGIC SYSTEMS OFFER A HIGH-LEVEL PERFORMANCE IN COMPLEX PROJECTS DRIVERS INNOVATION, • Growing long-term trends in cross-cutting development drivers: DIVERSIFICATION energy transition, sustainability and digitalization • Selective approach on key growt

  10. Slide 10: Market Drivers Transform to Grow

    TESMEC ADDED-VALUE SOLUTIONS AND MONITORING SYSTEMS OFFER A HIGH-LEVEL PERFORMANCE IN COMPLEX PROJECTS MARKET IOT, BIG DATA AND ARTIFICIAL INTELLIGENCE DRIVERS • Combine Operational Data in the cloud and apply Advanced Analytics • Diagnostic and Digitalization for the Predictive Maintenance • Roboti

  11. Slide 11: Digital Innovation: AI as a Game Changer

    DIGITAL MAPPING AUTONOMOUS VEHICLES • Digitalization of existing infrastructures • Smart fleet management • Live and synchronized working environment for • Automated jobsite DIGITAL professionals • High standard safety • Virtual reconstruction of under and above earth INNOVATION PREDICTIVE MAINTENAN

  12. Slide 12: Sustainable Innovation: Renewables as a Game Changer

    ELECTRIFICATION LOW CARBON FOOTPRINT • Full electric stringing machines • Clean and Fast solutions • Hybrid and electric railcars • Innovative methodologies to reduce the environmental impact • Path towards electrification for small size trenchers • New generation of engines SMART & STRONG GRID SUST

  13. Slide 13: ESG Strategy

    ENVIRONMENT SOCIAL GOVERNANCE INCREASE GREEN & INVEST IN PEOPLE ESG EFFECTIVE DIGITAL SOLUTIONS & LOCAL AND SUSTAINABLE ▪ Improving energy efficiency with increasing renewable energy COMMUNITIES GOVERNANCE ▪ Strategies for Talent ▪ Promotion of a responsible sources Acquisition and Employer corporat

  14. Slide 14: Business Units

    TESMEC BUSINESS UNITS All rights reserved EUROPEAN MIDCAP EVENT 14 June 11th, 2025

  15. Slide 15: Energy Stringing

    ENERGY STRINGING • SOLUTIONS FOR CONSTRUCTION AND MAINTENANCE OF ELECTRICAL NETWORKS • ADVANCED METHODOLOGIES FOR AUTOMATED CONSTRUCTION SITES • ZERO EMISSION MACHINES DIGITAL & GREEN SOLUTIONS: NEW METHODOLOGIES FOR CONSTRUCTION AND MAINTENANCE OF ENERGY TRANSPORT AND DISTRIBUTION INFRASTRUCTURES A

  16. Slide 16: Energy – Stringing

    ENERGY – STRINGING TOWER NEW POWERLINE HELICOPTER POWERLINE ERECTION CONSTRUCTION STRINGING REFURBISHMENT The perfect match between For the installation of any type The solution for the “direct Line refurbishment & hydraulic winches and derricks. of conductor, including htls. stringing” by helicopte

  17. Slide 17: Energy – Stringing: Main Worldwide Experiences

    ENERGY – STRINGING MAIN WORLDWIDE EXPERIENCES Reconductoring Underground Cable Laying Stringing Machines 4.0 Fjord crossing USA UK BELGIUM NORWAY Continuous Linear Puller Romford 4.0 Machines Special machines for fjord crossing Type of line: transmission, 3 x 33 kV cable pulling and modular machines

  18. Slide 18: Reconductoring, Digital Stringing, Helicopter Stringing

    RECONDUCTORING OPERATIONS Digital Stringing Machine HELICOPTER STRINGING CHINA Extreme project in Zhejiang Province All rights reserved Tower height: 380 m EUROPEAN MIDCAP18EVENT 18 June 11th, 2025 Four bundled conductors 500 kV

  19. Slide 19: From Energy Stringing to Energy Automation

    FROM ENERGY STRINGING... BU ENERGY STRINGING OH DIVISION OH OH OH HV PS SS UG UG UG PRODUCTION TRANSMISSION DISTRIBUTION PROSUMER OH UG HV PS SS OVERHEAD UNDERGROUND SUBSTATION PROTECTION, Solutions for the Complete range for AUTOMATION MONITORING installation and cable laying and SYSTEMS (SAS) AND

  20. Slide 20: Energy Automation

    ENERGY AUTOMATION • PROTECTION & MONITORING SOLUTIONS • REMOTE CONTROL SOLUTIONS • SERVICE TELECOMMUNICATIONS SOLUTIONS FOR HV GRIDS • SMART METERING SOLUTIONS GRID RELIABILITY, EFFICIENCY AND SECURITY: A FULL PORTFOLIO OF POWER GRID TECHNOLOGIES, TAILORED AND INTEGRATED SOLUTIONS TO FACE FAST-CHANG

  21. Slide 21: Energy – Automation

    ENERGY – AUTOMATION SUBSTATION SERVICE AUTOMATION SYSTEMS PROTECTION & MONITORING TELECOMMUNICATIONS Protection and control systems for HV Integrated solution for protection, substations. Integrated solution of service control and automation of modern telecommunications for HV grids. and complex ele

  22. Slide 22: Energy – Automation: Main Worldwide Experiences

    ENERGY – AUTOMATION MAIN WORLDWIDE EXPERIENCES Telecommunication Substation Automation solution System ALGERIA ITALY Remote management of HV Protection and control systems for HV substations and protection substations (SAS) based on IEC 61850 systems against unexpected grid faults Fault Passage Indi

  23. Slide 23: Protection and Monitoring Solutions

    PROTECTION AND MONITORING SOLUTIONS for primary and secondary substations All rights reserved Telecommunication EUROPEAN MIDCAP23EVENT solution 23 June 11th, 2025

  24. Slide 24: Trenchers & Surface Miners

    TRENCHERS & SURFACE MINERS • TELECOM NETWORKS, FTTH & LONG DISTANCE, POWER CABLE INSTALLATION • OIL & GAS, WATER PIPELINES, RENEWABLES • BULK EXCAVATION, QUARRIES & SURFACES MINING ADVANCED WORKING METHODOLOGY: INTEGRATED SYSTEMS & TECHNOLOGICAL SOLUTIONS FOR A COMPLETE JOBSITE MANAGEMENT All rights

  25. Slide 25: Trenchers & Surface Miners

    TRENCHERS & SURFACE MINERS FIBER ENERGY PIPELINES OPTIC CABLES & UTILITIES Urban fiber optic networks Underground energy Oil and gas pipelines, (FTTx), suburban networks cables, especially in canals, water and sewage (city rings) and long- renewable energy utilities networks and DETECTION distance n

  26. Slide 26: Trenchers: Main Worldwide Experiences

    TRENCHERS & SURFACE MINERS MAIN WORLDWIDE EXPERIENCES Fiber Optics Laying Gas Pipeline UK USA Georadar Explorer 2.0 & Sidecut 1150XHD Chainsaw Surface mining Gold Water Pipeline RUSSIA CHILE 1475 Rock Hawg 1675 Chainsaw Bauxite Mining Limestone quarry UZBEKISTAN WEST AFRICA (GUINEA, IVORY COAST) 147

  27. Slide 27: Fiber Optics Laying and Tunneling Project

    Fiber Optics Laying UK Georadar Explorer 2.0 & Sidecut TUNNELING PROJECT All rights reserved AUSTRALIA EUROPEAN MIDCAP27EVENT 27 1475 Rock Hawg EVO June 11th, 2025

  28. Slide 28: Railway

    RAILWAY • CATENARY INSTALLATION & MAINTENANCE • DIAGNOSTIC VEHICLES AND SYSTEMS • INTEGRATED PLATFORM FOR SAFE INFRASTRUCTURE GLOBAL CATENARY SPECIALIST FOR THE INSTALLATION AND MAINTENANCE OF RAILWAY LINES: SOLUTIONS WITH INTEGRATED SYSTEMS AND RAIL VEHICLES FOR A SAFE, EFFICIENT AND SUSTAINABLE RA

  29. Slide 29: Railway & Surface Miners Trenchers

    RAILWAY & SURFACE MINERS TRENCHERS CATENARY INSTALLATION DIAGNOSTIC OF INFRASTRUCTURE & MAINTENANCE Integrated systems, vehicles, solutions for the diagnostic of rail and civil Solutions for construction and refurbishment of railway line and infrastructure Certified vehicles for catenary maintenance

  30. Slide 30: Railway: Main Worldwide Experiences

    RAILWAY MAIN WORLDWIDE EXPERIENCES Stringing & recovering RER Catenary renewal Safety of Railway Catenary maintenance wires FRANCE ITALY 9 vehicles (6 different models) Infrastructure 88 Multipurpose railway vehicles USA ITALY 16 Revamping maintenance units Engineered to allow a correct execution of

  31. Slide 31: Railway: Electrification of New Lines, High Speed

    ELECTRIFICATION OF NEW LINES HIGH SPEED CHINA RAILWAY: Main worldwide experience > 30 stringing units 1,318 km BEIJING-SHANGHAI CUSTOMIZED SOLUTIONS POLAND 4 Stringing units Tensioning system for railway wiring operations composed by working units mounted on ISO 20 size flat modules All rights reser

  32. Slide 32: A Long History Partnering with Major Players

    A LONG HISTORY PARTNERING WITH MAJOR PLAYERS ACQUISITION OF GROUPE MARAIS 2015 Trenchers focus STRINGING AUTOMATION TRENCHER RAIL • Sales • Support to • Sales& • Sales the Enedis Service PARTNERSHIP with OTE • Spare Parts • Spare Parts Strategic synergy for the Rental business Project • R&D & Servic

  33. Slide 33: Financials

    TESMEC FINANCIALS All rights reserved EUROPEAN MIDCAP EVENT 33 June 11th, 2025

  34. Slide 34: Key Consolidated Financials

    KEY CONSOLIDATED FINANCIALS REVENUE BY BU (% ON TOTAL REVENUE) EBITDA BY BU (EBITDA MARGIN) NET FINANCIAL POSITION (€M) (€M) (€M) TOT. TOT. TOT. 236,0 239,5 41,1 153,5 147,0 46,9 50,4 (19,9%) (21,0%) TOT. 9,5 32,8 (18,9%) 8,6 67,7 77,3 (18,3%) 11,3 (28,7%) (32,23%) (14,7%) 10,0 (14,7%) 121,4 111,9 2

  35. Slide 35: Key Consolidated KPIs

    KEY CONSOLIDATED KPIs BACKLOG SALES BY MARKETS RECURRING BUSINESS ▪ Long- term backlog in Automation and Rail ▪ Recurring: Rental, Projects, Spare Parts, Services (maintenance, ▪ Trencher backlog 2023 net of Groupe Marais revamping & refurbishing, consulting & training), LT backlog; discontinuing op

  36. Slide 36: 1Q.2025 Actual Profit & Loss Statement

    1Q.2025* ACTUAL PROFIT&LOSS STATEMENT “1Q.2024 Pro-Forma” excludes Groupe Marais discontinuing operations results (“after” JV operation in France) PROFIT & LOSS 1Q.2025 1Q.2024 €M Actual Pro-Forma Δ Δ% ▪ REVENUES growing by ca. 10% vs. 2024, with improvement in all business units REVENUES 61,4 55,8

  37. Slide 37: 1Q.2025 Statement of Financial Position

    1Q.2025* STATEMENT OF FINANCIAL POSITION €M Mar. 31, 2025 Dec. 31, 2024 Δ Net Working Capital 103,0 99,8 3,1 of which: inventory 94,2 96,1 (1,9) ▪ Increase in net working capital due to higher intra-year of which:A/R 61,2 55,4 5,7 receivables and WIP Fixed Assets 105,2 106,9 (1,7) ▪ Groupe Marais re

  38. Slide 38: Trenchers: 1Q.2025 Facts & Figures

    TRENCHERS: 1Q.2025* FACTS & FIGURES (€M) 50 KEY FACTS ▪ Solid business growth and market relaunch in Tesmec USA, 40 better than initial forecast even thought the uncertainty of the 30,7 31,8 market related to political and other developments 30 ▪ Enhancing local infrastructure in Australia with prom

  39. Slide 39: Rail: 1Q.2025 Facts & Figures

    RAIL: 1Q.2025 FACTS & FIGURES (€M) 20 KEY FACTS ▪ Significant milestones in internationalization: ✓ SWITZERLAND: successful achievement of the critical 9,6 design review (CDR). second significant milestone of the 10 sales contract for the design, production and 7,5 commissioning of the integrated di

  40. Slide 40: Energy: 1Q.2025 Facts & Figures

    ENERGY: 1Q.2025 FACTS & FIGURES (€M) 30 KEY FACTS 20,0 17,6 Stringing 20 ▪ Major opportunities in India and Middle East with development prospects and in US with the introduction of new innovative 10 tools. 2,9 3,2 ▪ PE1151 launch: a new full electrical machine complete the 16,4% 15,8% offer in the

  41. Slide 41: 1Q.2025 EBITDA Evolution by BU

    1Q.2025* EBITDA EVOLUTION BY BU (€M) 20 +0,6 (0,6) +0,3 10 Volumes and lower 9,1 Volumes Job-orders’ mix OPEX, more than 9,5 and lower OPEX offsetting quarterly mix 9,1 9,2 9,5 0 Pro-forma 1Q.2024 Trencher Railway Energy 1Q.2025 *Actual figures as of March 31, 2025 prepared in accordance with IFRS5.

  42. Slide 42: 1Q.2025 Net Financial Position Evolution

    1Q.2025* NET FINANCIAL POSITION EVOLUTION (€M) 200 Total delta: -5,6€M Delta IFRS: -3,3€M 150 Delta Net NFP: +8,9€M 153,5 30,5 152,6 147,0 33,8 3,5 3,1 2,2 122,1 100 113,2 50 0 Dec. 31, 2024 IFRS 16 Net debt NWC OFCF CAPEX Net debt IFRS 16 Mar.31, 2025 31/12/2024 31/03/2025 €M Mar. 31,2025 Dec. 31,2

  43. Slide 43: 2025 Business Guidelines

    2025 BUSINESS GUIDELINES All rights reserved EUROPEAN MIDCAP EVENT 43 June 11th, 2025

  44. Slide 44: 2020-2024 Equity Story and 2025 Outlook

    2020-2024 EQUITY STORY and 2025 OUTLOOK (€ mln) 17,2% LEVERAGING STRONG CAPABILITIES IN THE FACE OF CURRENT 41,1 153,5 MACROECONOMIC CHALLENGES AND UNCERTAINTY 14,5% 147 245,2 239,5 236 153,5 35,2 13,9% ▪ Growing reference markets driven by energy transition 32,8 128,4 121,0 ▪ Solid order book and e

  45. Slide 45: Trenchers

    TRENCHERS The strengthening of North Africa, Strengthening driven by favorable conditions, the the North Africa resumption of key projects, and market the consolidation of local structure. Tesmec invests in the Business advancement of digital solutions Strategic and services and AI technology for ex

  46. Slide 46: Rail

    RAIL TESMEC FRANCE: Strategic platform for the growth of French Growth of French activities in the railway sector: development activities of a specialized center to support the Railway business, aimed at meeting local needs for railway infrastructure maintenance solutions. STRENGTHEN THE MARKET POSI

  47. Slide 47: Energy

    ENERGY STRINGING AUTOMATION Continue leading the growth and extend Growth at a fast pace while improving the market share, we will implement diversification, exploiting our current strategic initiatives and innovative Profitability Digitalization portfolio and addressing contingencies, by solutions.

  48. Slide 48: Annex

    ANNEX All rights reserved EUROPEAN MIDCAP EVENT 48 June 11th, 2025

  49. Slide 49: Annex: 2024 Summary Profit & Loss Statement

    ANNEX: 2024* SUMMARY PROFIT & LOSS STATEMENT PROFIT & LOSS (€ Mln) 2024 ACTUAL 2023 PRO-FORMA 2023 ACTUAL NET REVENUES 239,5 236,0 251,9 Raw materials costs (-) (109,0) (106,3) (108,8) Cost for services (-) (42,7) (47,9) (52,2) Personnel Costs (-) (53,0) (56,6) (63,3) Other operating revenues/costs

  50. Slide 50: Annex: 2024 Balance Sheet

    ANNEX: 2024* BALANCE SHEET BALANCE SHEET (€ Mln) Dec.31, 2024 Dec. 31, 2023 Inventory 96,1 110,6 Work in progress contracts 36,7 29,2 Accounts receivable 55,4 45,6 Accounts payable (-) (79,9) (82,8) Op. working capital 108,4 102,7 Other current assets (liabilities) (8,6) (15,8) Net working capital 9

  51. Slide 51: Annex: 1Q.2025 Summary Profit & Loss Statement

    ANNEX: 1Q.2025* SUMMARY PROFIT & LOSS STATEMENT PROFIT & LOSS (€ Mln) 1Q.2025 ACTUAL 1Q.2024 PRO-FORMA NET REVENUES 61,4 55,8 Raw materials costs (-) (28,6) (25,0) Cost for services (-) (11,0) (10,0) Personnel Costs (-) (13,6) (13,9) Other operating revenues/costs (+/-) (1,5) (1,3) Non recurring rev

  52. Slide 52: Annex: 1Q.2025 Balance Sheet

    ANNEX: 1Q.2025* BALANCE SHEET BALANCE SHEET (€ Mln) Mar. 31, 2025 Dec.31, 2024 Inventory 94,2 96,1 Work in progress contracts 40,6 36,7 Accounts receivable 61,2 55,4 Accounts payable (-) (86,3) (79,9) Op. working capital 109,7 108,4 Other current assets (liabilities) (6,8) (8,6) Net working capital

  53. Slide 53: Disclaimer

    DISCLAIMER This presentation has been prepared by Tesmec S.p.A. (“Tesmec”, the “Company” or the “Group”). As used herein, “Presentation” means this document, any oral presentation, the question and answer session and any written or oral material discussed or distributed during the presentation. The

  54. Slide 54: Tesmec

    +> ee TESMEC

Tesmec — European Midcap Event 2025 on 6ix