Tesmec S.p.a. · MIL:TES

Tesmec — Le Eccellenze del Made in Italy Conference 2026

43 slides from Tesmec's conference presentation, Oct 1, 2026

  1. Slide 1: Le Eccellenze del Made in Italy Conference

    LE ECCELLENZE DEL MADE IN ITALY CONFERENCE Milan I October 1st, 2026

  2. Slide 2: Agenda

    AGENDA GROUP OVERVIEW ▪ GROUP OVERVIEW BUSINESS UNITS ▪ BUSINESS UNITS ▪ GROUP FINANCIALS ▪ 2026 OUTLOOK ▪ ANNEX All rights reserved 2

  3. Slide 3: Tesmec Overview

    TESMEC OVERVIEW All rights reserved 3

  4. Slide 4: Our Vision, Our Mission

    OUR VISION OUR MISSION FOR THE FUTURE FOR THE PLANET COMMITTED TO ENERGY TRANSITION, SAFETY AND DIGITALIZATION Technology partner with INNOVATIVE, ADDED-VALUE INTEGRATED SOLUTIONS for the construction, maintenance and efficiency of INFRASTRUCTURES for the TRANSPORT AND DISTRIBUTION OF ​ENERGY, DATA

  5. Slide 5: Enabling Infrastructure Megatrends

    ENABLING INFRASTRUCTURE MEGATRENDS STRINGING AUTOMATION TRENCHERS RAILWAY ENERGY TRANSITION • ELECTRIFICATION RISING POWER CONSTRUCTION SMART GRIDS & ELECTRIFIED DATA CENTERS DEMAND OF NEW LINES AND SUBSTATION RAILWAY READINESS • RENEWABLES EXPANSION & GRID SUBSTATIONS DIGITALIZATION NETWORKS COMPLE

  6. Slide 6: Tesmec Group Technological Developments

    TESMEC GROUP TECHNOLOGICAL DEVELOPMENTS STRINGING OF LAYING OF LAYING OVERHEAD CABLES SYSTEMS FOR ELECTRICAL ENERGY ELECTRIC CABLES UNDERGROUND CABLES FOR RAILWAY NETWORKS SUBSTATIONS THE COMMON THREAD OF OUR HISTORY ENERGY 1984 | TRENCHERS 2017 | AUTOMATION 2012 | RAILWAY • Systems and devices for

  7. Slide 7: Capturing Megatrends Through Cutting Edge Technologies

    CAPTURING MEGATRENDS THROUGH CUTTING EDGE TECHNOLOGIES “‘TIPO 4” DIAGNOSTIC VEHICLES TRENCHER 1875XL EVO GAS PIPELINE WHY TESMEC IS POSITIONED TO WIN TECH-DRIVEN, HIGH-BARRIERS • LEADING POSITIONS IN HIGHLY SPECIALIZED GLOBAL NICHES • PROPRIETARY TECHNOLOGIES • EXECUTION IN LARGE-SCALE INFRASTRUCTUR

  8. Slide 8: From Infrastructure Trends to Strategic Outlook

    FROM INFRASTRUCTURE TRENDS TO STRATEGIC OUTLOOK HOW TESMEC CREATES VALUE TECHNOLOGY, VALUE, MARKETS AND EFFICIENCY, BUSINESS EXECUTION VOLUMES SUPPORTING GROWTH MODEL • REVENUE VISIBILITY SUPPORTED BY INFRASTRUCTURAL CAPEX • EXPOSURE TO HIGH-GROWTH GEOGRAPHIES AND LARGE-SCALE PROJECTS INNOVATION FOR

  9. Slide 9: Energy Stringing

    ENERGY STRINGING • SOLUTIONS FOR CONSTRUCTION AND MAINTENANCE OF ELECTRICAL NETWORKS • ADVANCED METHODOLOGIES FOR AUTOMATED CONSTRUCTION SITES • ZERO EMISSION MACHINES DIGITAL & GREEN SOLUTIONS: NEW METHODOLOGIES FOR CONSTRUCTION AND MAINTENANCE OF ENERGY TRANSPORT AND DISTRIBUTION INFRASTRUCTURES A

  10. Slide 10: Trenchers & Surface Miners

    TRENCHERS & SURFACE MINERS • OIL & GAS, WATER PIPELINES, RENEWABLES • BULK EXCAVATION, QUARRIES & SURFACES MINING • TELECOM NETWORKS, FTTH & LONG DISTANCE, POWER CABLE INSTALLATION ADVANCED WORKING METHODOLOGY: INTEGRATED SYSTEMS & TECHNOLOGICAL SOLUTIONS FOR A COMPLETE JOBSITE MANAGEMENT All rights

  11. Slide 11: Railway

    RAILWAY • CATENARY INSTALLATION & MAINTENANCE • DIAGNOSTIC VEHICLES AND SYSTEMS • INTEGRATED PLATFORM FOR SAFE INFRASTRUCTURE GLOBAL CATENARY SPECIALIST FOR THE INSTALLATION AND MAINTENANCE OF RAILWAY LINES: SOLUTIONS WITH INTEGRATED SYSTEMS AND RAIL VEHICLES FOR A SAFE, EFFICIENT AND SUSTAINABLE RA

  12. Slide 12: Energy Automation

    ENERGY AUTOMATION • PROTECTION & MONITORING SOLUTIONS • REMOTE CONTROL SOLUTIONS • SERVICE TELECOMMUNICATIONS SOLUTIONS FOR HV GRIDS • SMART METERING SOLUTIONS GRID RELIABILITY, EFFICIENCY AND SECURITY: A FULL PORTFOLIO OF POWER GRID TECHNOLOGIES, TAILORED AND INTEGRATED SOLUTIONS TO FACE FAST-CHANG

  13. Slide 13: Italian DNA, Global Footprint

    16 SALES SUBSIDIARIES 7 PRODUCTION PLANTS ITALY: Grassobbio, Sirone, Monopoli, Fidenza, Patrica ITALIAN USA: Alvarado; FRANCE: Durtal DNA, GLOBAL FOOTPRINT 75 YEARS OF EXPERIENCE 35+ PATENTS DEVELOPED 900+ EMPLOYEES WORLDWIDE TESMEC GROUP HEADQUARTERS BERGAMO, ITALY Founded in northern Italy in the

  14. Slide 14: Industrial Footprint

    INDUSTRIAL FOOTPRINT GRASSOBBIO, BG HEADQUARTERS MONOPOLI SIRONE, LC GRASSOBBIO 68.000 mq FIDENZA, PR 33.000 mq FIDENZA MONOPOLI E BITETTO, BA PATRICA, FR 2.180 mq ALVARADO, DURTAL, TEXAS FRANCIA STRINGING AUTOMATION TRENCHERS RAILWAY 14 All rights reserved All rights reserved

  15. Slide 15: At a Glance

    AT A GLANCE FY.2025 PERFORMANCES SALES €M 257,6 REVENUE BREAKDOWN (FY25) BACKLOG BREAKDOWN (H1.26) €M 239,5 in 2024 Energy Trencher Energy Trencher EBITDA €M 40,5 37% 42% 238,5 80,9 €M €M €M 41,1 in 2024 EBITDA MARGIN 15,7% 17,2% in 2024 Rail 21% Rail 178,9 €M EBIT €M 19,5 €M 0,4 in 2024 MARKETS (FY

  16. Slide 16: Business Units

    TESMEC BUSINESS UNITS All rights reserved 16

  17. Slide 17: Trenchers & Surface Miners

    TRENCHERS & SURFACE MINERS SURFACE PIPELINES BULK MINING & UTILITIES EXCAVATION Replacing use of Heavy civil projects explosives and (construction, traditional methods. foundations, road construction) Oil and gas pipelines, canals, water and sewage utilities networks and drainage work DETECTION & MA

  18. Slide 18: Trenchers & Surface Miners Highlights

    TRENCHERS & SURFACE MINERS HIGHLIGHTS MARKETS REVENUE AND EBITDA TREND (€M) ▪ MANUFACTURING FACILITIES IN ITALY, FRANCE AND USA 2023 2024 2025 H1.2026 ▪ SUBSIDIARIES IN AFRICA, MIDDLE-EAST AND OCEANIA ▪ BROAD INTERNATIONAL REACH, WITH SELECTIVE APROACH ON HIGH-PRIORITY REGIONS 121,4 111,9 107,60 LAN

  19. Slide 19: Railway & Surface Miners Trenchers

    RAILWAY & SURFACE MINERS TRENCHERS CATENARY INSTALLATION DIAGNOSTIC OF INFRASTRUCTURE & MAINTENANCE SOLUTIONS FOR CONSTRUCTION AND REFURBISHMENT OF INTEGRATED SYSTEMS, VEHICLES, SOLUTIONS FOR THE DIAGNOSTIC OF RAIL RAILWAY LINE AND CERTIFIED VEHICLES FOR CATENARY AND CIVIL INFRASTRUCTURE MAINTENANCE

  20. Slide 20: Railway Highlights

    RAILWAY HIGHLIGHTS MARKETS REVENUE AND EBITDA TREND (€M) ▪ SOLID DOMESTIC ANCHOR 2023 2024 2025 H1.2026 ▪ SELECTIVE INTERNATIONAL EXPANSION 53,4 50,4 LANDSCAPE & VALUE 46,9 ▪ COMPETE ON CUSTOMIZATION, NOT SCALE (LARGE PLAYERS FOCUSED ON STANDARD SOLUTIONS) ▪ SELECTIVE EXPORT THROUGH TENDER-DRIVEN OP

  21. Slide 21: Energy – Stringing

    ENERGY – STRINGING TOWER NEW POWERLINE HELICOPTER POWERLINE ERECTION CONSTRUCTION STRINGING REFURBISHMENT The perfect match between For the installation of any type The solution for the “direct Line refurbishment & hydraulic winches and derricks. of conductor, including htls. stringing” by helicopte

  22. Slide 22: Energy-Stringing Highlights

    ENERGY-STRINGING HIGHLIGHTS MARKETS REVENUE AND EBITDA TREND (€M) 2023 2024 2025 H1.2026 ▪ EXPORT-ORIENTED ▪ HIGH-DEMAND CONCENTRATED IN KEY REGIONS: USA (ALSO VIA CONDUX 65,7 TESMEC JV), MIDDLE EAST, INDIA, AUSTRALIA LANDSCAPE & VALUE 50,8 All rights reserved 41,7 42,8 ▪ LEADING IN A GLOBAL NICHE M

  23. Slide 23: From Energy Stringing to Energy Automation

    FROM ENERGY STRINGING... BU ENERGY STRINGING OH DIVISION OH OH OH HV PS SS UG UG UG PRODUCTION TRANSMISSION DISTRIBUTION PROSUMER OH UG HV PS SS OVERHEAD UNDERGROUND SUBSTATION PROTECTION, Solutions for the Complete range for AUTOMATION MONITORING installation and cable laying and SYSTEMS (SAS) AND

  24. Slide 24: Energy-Automation Value Proposition

    ENERGY-AUTOMATION VALUE PROPOSITION • Allow security and stability SERVING THE ELECTRIFICATION VALUE CHAIN • Communicate and interconnect Tesmec Automation support the grid in all its chain, help in managing the flow to • Automate solutions to reduce action time Power Generation HV Substation Primar

  25. Slide 25: Energy-Automation Highlights

    ENERGY-AUTOMATION HIGHLIGHTS MARKETS REVENUE AND EBITDA TREND (€M) 2023 2024 2025 H1.2026 ▪ STRONG DOMESTIC ANCHOR WITH AN INCREASINGLY DIVERSIFIED DOMESTIC CUSTOMER PORTFOLIO ▪ SCALING INTERNATIONAL PRESENCE THROUGH TARGETED EXPANSION IN 30,9 FRANCE AND SELECT HIGH-GROWTH MARKETS 26,5 LANDSCAPE & V

  26. Slide 26: Group Financials

    GROUP FINANCIALS All rights reserved 26

  27. Slide 27: Trend by Division, 2023-2025

    TREND BY DIVISION, 2023-2025 (€M) REVENUE TREND AND MIX EBITDA TREND AND MIX (% ON TOTAL REVENUE) (EBITDA MARGIN) TOTAL 2025: TOTAL 2023: TOTAL 2024: 257,6 239,5 TOTAL 2024: 236,0 TOTAL 2025: 41,1 53,4 40,5 46,9 50,4 (20, 7%) TOTAL 2023: 9,5 10,2 (19,9%) (21,0%) 32,8 (18,9%) (19,0%) 8,6 67,7 96,6 (1

  28. Slide 28: Backlog Trend

    BACKLOG TREND 227,5 ENERGY 239€M, of which Energy- RAIL Stringing 65€M 179 €M Duration <1 year 162,6 Duration 3-4 years 121,9 116,6 H1.2026: 498,3 €M 72,1 Energy- 66,2 Automation 175€M TRENCHERS Duration 4-5 years 81€M 2025 2024 2025 2024 2024 2025 Duration <1 year Energy Trencher Railway Long- term

  29. Slide 29: Net Financial Position Trend, 2024-2026

    NET FINANCIAL POSITION TREND, 2024-2026 (€M) TOTAL PFN: 183,6 TOTAL PFN: ▪ FINANCIAL DISICPLINE TO CONTROL 147,0 TOTAL PFN: TOTAL PFN: NWC 130,4 120,3 132,6 ▪ NWC DECREASING DESPITE VOLUME GROWTH 113,2 102,8 95,9 ▪ CAPEX ALIGNED WITH DEPRECIATION 51,0 33,8 27,6 24,3 ▪ INDUSTRIAL NET DEBT AT ~€30M Ju

  30. Slide 30: H1.2026 Results

    H1.2026 RESULTS All rights reserved 30

  31. Slide 31: H1.2026 Profit & Loss Statement

    H1.2026 PROFIT&LOSS STATEMENT (€M) PROFIT & LOSS H1.2025 H1.2026 Δ Δ% REVENUES 128,6 144,2 15,6 +12,2% ▪ REVENUES growing by 12,2%, driven by strong Energy performance and recovery in the Trencher business, with EBITDA 21,2 24,3 3,1 +14,7% increased manufactured volumes. Rail’s results, though in %

  32. Slide 32: H1.2026 Statement of Financial Position

    H1.2026 STATEMENT OF FINANCIAL POSITION (€M) Δ Jun. 30, 2026 vs Dec.31, 2025 Jun.30, 2026 Dec.31, 2025 NET WORKING CAPITAL 71,8 64,3 (7,5) ▪ NET INVESTED CAPITAL decreasing by 3,1€M vs. Dec-2025, mainly driven by Net working FIXED ASSETS 116,8 117,5 0,7 capital decreased by 7,5€M, thanks to the Ener

  33. Slide 33: H1.2026 Net Financial Position Evolution

    H1.2026 NET FINANCIAL POSITION EVOLUTION (€M) 130,4 27,6 6,8 2,6 24,3 120,3 7,5 102,8 1,9 95,9 8,2 Dec. 31,2025 IFRS16 Net debt OCF NWC CAPEX FLEET EQUITY ADJ.* Net debt IFRS16 Jun.30,2026 31/12/2025 EXCLUDING 30/06/2026 FLEET €M Jun.30, 2026 Dec.31,2025 Jun.30,2025 INVENTORIES 101,9 87,7 96,8 WORK

  34. Slide 34: Trenchers: H1.2026 Facts & Figures

    TRENCHERS: H1.2026 FACTS & FIGURES (€M) KEY FACTS 60,2 63,3 ▪ Recovery trajectory started in H1.2026, supported by higher production volumes and a progressively strengthening backlog, providing improved visibility for 9,1 9,1 the coming quarters 15,1% 14,3% ▪ Selective focus on high-value end-market

  35. Slide 35: Rail: H1.2026 Facts & Figures

    RAIL: H1.2026 FACTS & FIGURES (€M) KEY FACTS 25,0 ▪ Acceleration in execution activities expected in H2 2026, 20,7 supported by the progressive ramp-up of recently awarded contracts and the advancement of key projects through their respective operational phases 4,2 ▪ Continued progress of the new bi

  36. Slide 36: Energy: H1.2026 Facts & Figures

    ENERGY: H1.2026 FACTS & FIGURES (€M) KEY FACTS 60,2 STRINGING ▪ Strong growth momentum and a backlog up ~86% vs. Jun- 43,4 25, providing increasing visibility beyond the current year ▪ Condux Tesmec JV confirmed as a key growth platform in the U.S. market, supporting margin expansion through 13,7 si

  37. Slide 37: 2026 Guidelines

    2026 GUIDELINES | TESMEC

  38. Slide 38: 2021-2025 Equity Story and 2026 Outlook

    2021-2025* EQUITY STORY and 2026 OUTLOOK 2026 OUTLOOK: EXPECTED GROWTH OF KEY ECONOMIC INDICATORS VS. 2025 AND FURTHER REDUCTION OF NET FINANCIAL INDEBTENESS VS. JUNE 30, 2026, THANKS TO AN ACCELERATION OF BUSINESS MOMENTUM IN H2.2026 REVENUE EBITDA NFP Solid, high-quality order backlog, enduring vi

  39. Slide 39: Annex

    ANNEX All rights reserved 39

  40. Slide 40: FY.2025 Summary P&L and BS

    FY.2025* SUMMARY PL AND BS SUMMARY PROFIT & LOSS STATEMENT BALANCE SHEET €M 2025 2024 €M Dec.31, 2025 Dec.31, 2024 NET REVENUES 257,6 239,5 Inventory 87,7 96,1 Raw materials costs (-) (116,0) (109,0) Work in progress contracts 34,3 36,7 Cost for services (-) (52,4) (42,7) Accounts receivable 61,1 55

  41. Slide 41: H1.2026 Summary

    H1.2026 SUMMARY (€M) PROFIT & LOSS (€ Mln) H1.2026 H1.2025 BALANCE SHEET (€ Mln) Jun.30,2026 Dec.31, 2025 NET REVENUES 144,2 128,6 Inventory 101,9 87,7 Raw materials costs (-) (67,8) (58,3) Work in progress contracts 30,6 34,3 Cost for services (-) (29,1) (23,8) Accounts receivable 72,9 61,1 Personn

  42. Slide 42: Disclaimer

    DISCLAIMER This presentation has been prepared by Tesmec S.p.A. (“Tesmec”, the “Company” or the “Group”). As used herein, “Presentation” means this document, any oral presentation, the question and answer session and any written or oral material discussed or distributed during the presentation. The

  43. Slide 43: Tesmec

    TESMEC

Tesmec — Le Eccellenze del Made in Italy Conference 2026 on 6ix