Corvus Gold Inc

Corvus Gold — Investor Presentation (November 2017)

27 slides from Corvus Gold's investor presentation, November 2017

  1. Slide 1: Corporate Presentation - November 2017

    Corporate Presentation - November 2017

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and US securities legislation. All statements, other than statements of historical fact, included her

  3. Slide 3: Corvus Gold Experience

    Corvus Gold Experience Management Directors Jeffrey Pontius - CEO & President Catherine Gignac - Chair of Board Ex AngloGold NA Expl. Mgr, Five discoveries Ex Northland Capital, corp. financial & technical skills Carl Brechtel - COO Ex AngloGold Mgr. of New Project Development Steven Aaker - Ex Fran

  4. Slide 4: Share Structure

    Share Structure ~Shareholder Distribution Management & Employees 6.8% Institutional 28.1% 25.2% Strategic 18.0% Retail 26.5% High Net Worth Long Term Top Shareholders %  99,569,582 shares I&O Tocqueville Asset Management 17.4  106,475,582 shares fully diluted, No Warrants AngloGold Ashanti Limited

  5. Slide 5: Nevada: A Go-To Mining Jurisdiction

    Nevada: A Go-To Mining Jurisdiction Called “The Silver State” but accounts for 83% of U.S gold production 5.3M oz gold produced in 2015, 4th largest globally Gold produced: • 1859 - 1994: ~60M oz • 1995 - 2015: ~140M oz Walker Lane Trend includes:  Comstock (35M Aueq oz)  Round Mountain (20M Au oz

  6. Slide 6: North Bullfrog & Mother Lode Districts

    North Bullfrog & Mother Lode Districts Fluorspar Canyon Fault 6 Nov 2017 | Corporate Presentation | TSX: KOR | OTCQX: CORVF *Gold Endowment Source: Nevada Mining Association, Non Corvus Gold Production

  7. Slide 7: Mother Lode Addition to North Bullfrog

    Mother Lode Addition to North Bullfrog • Acquired from Goldcorp for 1,000,000 shares • Historic non 43-101 resource* of 433,000 ozs gold (8.5 Mt @ 1.6 g/t) • 172 existing drill holes in database • Numerous +3 g/t structural zones • Historic tests ~50% heap leach recovery, being evaluated for AAO and

  8. Slide 8: Mother Lode - Selected Historic Drill Intercepts

    Mother Lode - Selected Historic Drill Intercepts* Location Drill Hole # From (m) To (m) Interval (m) Gold Grade (g/t) ML-85 48.8 134.1 85.3 1.52 ML-86 68.6 117.3 48.8 2.96 High-Grade Main Zone ML-115 86.9 140.2 53.3 2.14 Target D-442 129.8 184.4 54.6 2.91 D-445 80.9 123.4 42.5 3.92 D-447 123.4 159.8

  9. Slide 9: Mother Lode Target Areas

    Mother Lode Target Areas • Phase I drill program evaluating area approximately 500m x 300m to a depth of 300m • Further expansion Potential north, west and at depth. • Project has large sediment hosted deposit with N-S structural zone Plan map showing recent drill holes on new >0.5 g/t grade shell p

  10. Slide 10: Mother Lode - New Exploration Results

    (Reported intercepts are not true widths as there is currently insufficient Mother Lode - New Exploration Results data to calculate true orientation in space. Mineralized intervals are calculated using a 0.3 g/t and 1 g/t cutoff) Drill Hole # From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) Loca

  11. Slide 11: Mother Lode Exploration Upside

    Mother Lode Exploration Upside North-South cross section showing recent select intercepts (0.3 g/t cut) on new grade shell model (>0.5 g/t green & >1 g/t brown) • Historic drilling was vertical, mostly to depths less than 200m, many holes ending in ore with open ended mineralization • Potential for

  12. Slide 12: Mother Lode Exploration Upside

    Mother Lode Exploration Upside • Expansion to the northwest of historic pit along main intrusive trend • High-grade core of the Upper Zone follows main dike trend to the west • Potential for deeper repeated deposit in the Paleozoic, lower plate below Lower Zone East-West cross section showing recent

  13. Slide 13: Mother Lode Upper Zone - Tertiary Host Rocks

    Mother Lode Upper Zone - Tertiary Host Rocks Tertiary sediments to a depth of about 200m hosting historical resource* of about 400,000 ounces of gold in volcanoclastic tuffs, with potential to more than double in size with northern and western expansion. * Non NI-43-101 compliant, historical resourc

  14. Slide 14: Mother Lode Lower Zone - Paleozoic Host Rocks

    Mother Lode Lower Zone - Paleozoic Host Rocks First holes through the FCF into lower plate Paleozoic sediment • Deep oxidation of Pz seds • Broad jasperoid development • Crosscutting quartz veins • Cut by dikes and sills • Strong As & Hg geochem 14 Nov 2017 | Corporate Presentation | TSX: KOR | OTCQ

  15. Slide 15: North Bullfrog Project

    North Bullfrog Project

  16. Slide 16: NBP Heap Leach Pad, Mill Site and Tails Storage conceptual locations

    NBP Heap Leach Pad, Mill Site and Tails Storage are conceptual locations and have not been currently built

  17. Slide 17: North Bullfrog Two Phase Plan & Resource Update

    North Bullfrog Two Phase Plan & Resource Update* • Total mineral resource expanded to 1.76M ounces gold measured & indicated (M&I), 0.43M ounces gold inferred* • Phase I, highlights: • M&I mineral resource ~900k ounces at avg. grade of 0.8 g/t gold in 35Mt for mill* • 94% of Phase I plan resource is

  18. Slide 18: North Bullfrog - Near-Term Gold Production

    North Bullfrog - Near-Term Gold Production Development De-Risking  Water: Own 1,600 ac/ft water right (will allow expansion)  Power: New 16 Mw power line (50% more than required) Leach  Access: Adjacent to major Pad highway & extensive quality road waste access throughout the property  Labor: Wi

  19. Slide 19: Processing Plan NBP & MLP

    Processing Plan NBP & MLP • North Bullfrog Project includes an Oxide Mill for high-grade ore and a Run Of Mine heap leach for surrounding low-grade ore • Mother Lode Project contains oxide and transitional heap leach material as well as sulfide mill mineralization • Mill planned to convert to sulfid

  20. Slide 20: 2017-2018 Project Workplan

    2017-2018 Project Workplan Phase I (July-Dec 2017) Completion of NBP resource • Expand & characterize Mother Lode resource with initial 13,000m drill program • Define metallurgical characteristic of high and low grade Mother Lode mineralization & initial processing plan • Define conceptual multi-pr

  21. Slide 21: Producers Production Profiles In Decline

    Producers Production Profiles In Decline Projected 2015-2020 Production Decline -2.6% Goldcorp -4.2% Kinross -4.9% Coeur Mining -5.2% Hecla -5.7% Newmont -6.8% IAMGOLD -10.4% Barrick -18.0% AngloGold Ashanti -20% -15% -10% -5% 0% 21 Nov 2017 | Corporate Presentation | TSX: KOR | OTCQX: CORVF *Source

  22. Slide 22: Corvus Gold - Performance

    Corvus Gold - Performance Leverage to exploration news • Corvus up 275% on the heels of YellowJacket drill hole results • For the same period GLD was down 6% 22 Nov 2017 | Corporate Presentation | TSX: KOR | OTCQX: CORVF

  23. Slide 23: Corvus Gold - Compelling Gold Investment

    Corvus Gold - Compelling Gold Investment District potential for series of low strip, open pit, oxide/sulfide gold deposits in favorable permitting & operating area Infrastructure in-hand, permitting advanced to support potential commercial production in ~3 years Large resource expansion potential

  24. Slide 24: Corvus Gold

    CORVUS GOLD 700 West Pender Street, Suite 1750 Vancouver, British Columbia Canada, V6C 1G8 Telephone: (604)-638-3246 Toll Free: 1-844-638-3246 www.corvusgold.com

  25. Slide 25: Resource Estimate, Phase 1 & 2

    Resource Estimate, Phase 1 & 2 Measured, Indicated, & Inferred Mineral Resource Estimate for the North Bullfrog Project Constrained by Whittle TM pit volumes, including both the YellowJacket Vein/Stockwork & Disseminated Oxide Mineralization @ $1,250 Gold Price Mill Resource Disseminated Phase 1 (ox

  26. Slide 26: Resource Estimate, Total & Sulfides

    Resource Estimate, Total & Sulfides Measured, Indicated, & Inferred Mineral Resource Estimate for the North Bullfrog Project Constrained by Whittle TM pit volumes, including both the YellowJacket Vein/Stockwork & Disseminated Oxide Mineralization @ $1,250 Gold Price Phase Mill Resource Disseminated

  27. Slide 27: Assumptions

    Assumptions WhittleTM Input Parameters used for the 2017 North Bullfrog Mineral Resource Estimate Sierra Parameter Unit Mayflower* Jolly Jane* YellowJacket** Sulfide*** Blanca* Mining Cost US$/tonne 1.64 1.42 1.54 1.54 1.54 Au Cut-Off*** g/tonne 0.10 0.10 0.10 0.35 0.71 Processing Cost US$/tonne 1.7

Corvus Gold — Investor Presentation (November 2017) on 6ix