Puravankara Limited · NSE:PURVA

Puravankara — Q2 FY27 Earnings Presentation

56 slides from Puravankara's earnings presentation, Nov 2, 2026

  1. Slide 1: Exchange intimation letter for analyst meeting presentation

    Date: 02.11.2026 To, The General Manager, The Manager, Listing Operations Listing Department, Department of Corporate Services National Stock Exchange of India Limited, BSE Limited Exchange Plaza, 5th Floor, Plot No. C/1, P. J. Towers, Dalal Street, Fort, G Block, Bandra-Kurla Complex, Bandra (E), M

  2. Slide 2: Investor Corporate Presentation Q2 FY27

    Investor Corporate Presentation Q2 FY27 A LWAY S A B O U T YO U An Artist’s impression of Purva Heritage, Bangalore 1

  3. Slide 3: Table of Contents

    TABLE OF CONTENTS Table of 01 Company Overview 03-05 Contents 02 Revenue & PAT 06-08 03 Sales & Collection 09-13 BUILDING SPACES. 04 Pan-India Presence 14-18 ENRICHING LIVES. 05 Update on Financials 19-22 06 Update on Cashflows 23-26 07 Capital Management 27-29 08 Project Status 30-37 09 Environment

  4. Slide 4: Company Overview

    BUILDING TRUST FOR FIVE DECADES 01 51 Company Years of Legacy Overview 98 Completed Projects 10 For over five decades, Puravankara has shaped India’s urban landscape through thoughtfully designed residential and commercial developments, built on trust, Cities · Pan-India quality and execution excell

  5. Slide 5: 51 years of Legacy

    O U R J O U R N E Y 51 years of Legacy YEARS SINCE 1975 From a strong foundation in 1975 to a Pan-India footprint today, our journey has been one of trust, innovation and enduring value creation. 1975 1989 2005 2009 Established in Expanded JV with 1 Keppel Launched Provident 2018 2021 Housing Ltd. f

  6. Slide 6: Completed Projects and Land Bank

    98 60 Million Sft 21,000+ 46 Million Sft Completed Delivered Area Homes Under Land Bank Projects Across 98 projects Development 40.82 msft Group's 33.61 msft ongoing economic interest 5 Puravankara Limited · Investor Presentation Q2 FY27

  7. Slide 7: Revenue & PAT

    OPERATIONAL OVERVIEW 02 ₹ 82 Cr PAT - Q2 FY27 Revenue ₹ 1,051 Cr Total Revenue - Q2 FY27 & PAT 59% up Y-o-Y Handover momentum contributed ₹ 1,301 Cr to profitability. Customer Collections - Q2 FY27 24% up Y-o-Y Artist’s impression of Purva Atmosphere, Bangalore DIVERSE MARKETS STRONG DEMAND EXECUTIO

  8. Slide 8: Key Business Highlights – H1FY27

    Key Business Highlights – H1FY27 ₹ 3,575 Cr 3.19 msft ₹ 2,500 Cr ₹ 11,199 SALES VALUE SALES VOLUME* CUSTOMER COLLECTIONS AVERAGE REALISATION ₹ PER SFT H1FY26 sales of ₹ 2,455 Cr H1FY26 sales volume of 2.75 msft H1FY26 collection of ₹ 1,904 Cr 26% YoY increase 46% increase Y-o-Y 16% increase Y-o-Y 31

  9. Slide 9: Key Business Highlights – Q2FY27

    Key Business Highlights – Q2FY27 ₹ 2,136 Cr 1.83 msft ₹ 1,301 Cr ₹ 11,651 SALES VALUE SALES VOLUME* CUSTOMER COLLECTIONS AVERAGE REALISATION ₹ PER SFT Q2FY26 sales of ₹ 1,322 Cr Q2FY26 sales volume of 1.50 msft Q2FY26 collection of ₹ 1,047 Cr 32% YoY increase 62% increase Y-o-Y 22% increase Y-o-Y 24

  10. Slide 10: Sales & Collection

    ACROSS MARKET SEGMENTS 03 ₹ 2,136 Cr Sales Value Q2 FY27 62% up Y-o-Y Sales & 1.83 msft Collection Area Sold Q2 FY27 22% up Y-o-Y Sales performance during the period across diversified 1,403 geographies and development Units Sold Q2 FY27 segments. 12% up Y-o-Y Artist’s impression of Purva Clermont,

  11. Slide 11: Sales Performance H1 FY27 vs H1 FY26

    Sales Performance H1 FY27 vs H1 FY26 MOMENTUM ACROSS MARKETS AND SEGMENTS Quarter Ended Area Sold Units Sold Sale Value Sale Realization Based On Bookings Sep-26 Sep-25 % Sep-26 Sep-25 % Sep-26 Sep-25 % Sep-26 Sep-25 % Msft msft Nos. Nos. ₹ in crs ₹ in crs ₹ psft ₹ psft Purva South 2.55 2.05 25% 201

  12. Slide 12: Sales Performance Q2 FY27 vs Q2 FY26

    Sales Performance Q2 FY27 vs Q2 FY26 MOMENTUM ACROSS MARKETS AND SEGMENTS Quarter Ended Area Sold Units Sold Sale Value Sale Realization Based On Bookings Sep-26 Sep-25 % Sep-26 Sep-25 % Sep-26 Sep-25 % Sep-26 Sep-25 % Msft msft Nos. Nos. ₹ in crs ₹ in crs ₹ psft ₹ psft Purva South 1.47 1.10 34% 118

  13. Slide 13: Sales area classification – Unit value & Regional contribution

    Sales area classification – Unit value & Regional contribution UNIT VALUE WISE CONTRIBUTION TO SALES VALUE H1 FY27 H1 FY26 • Unit Value wise 71% of the Group’s sales are accounted by units, for which average > Rs. 2 Cr > Rs. 2 Cr sales price per unit is less < Rs 1 Cr 19% 29% than ₹ 2 Cr in H1 FY27

  14. Slide 14: Collections Trend

    Collections Trend GROWTH IN COLLECTIONS ACROSS MARKETS Collections (INR cr) 1,400 1,301 1,213 1,199 1,200 1,140 236 177 1,032 1,047 247 173 973 1,000 107 910 937 Q2 FY27 COLLECTIONS 885 892 177 126 857 827 127 60 108 ₹ 1,301 Cr 800 45 153 157 600 HIGHEST SECOND QUARTER 1,065 collections achieved in

  15. Slide 15: Pan-India Presence

    EXPANDING WITH A PAN-INDIAN PRESENCE 04 10 Cities Active Markets Pan-India 33.61 Presence msft Ongoing Area Present across India’s most dynamic real estate markets, creating long-term value and 14.50 msft sustainable growth. Planned and Launch Pipeline Artist’s impression of Purva Highlands, Bangalo

  16. Slide 16: Diversified across markets, brands and stages of development

    Diversified across markets, brands and stages of development DEVELOPABLE AREA AS AT 30 SEPTEMBER 2026 IN MILLION SQ. FT. Completed Ongoing Land Assets Total Assets (A) (B) (A)+(B) South India Bengaluru 41.93 17.02 30.22 47.25 Chennai 7.91 4.76 0.00 4.76 Hyderabad 2.78 0.00 0.00 0.00 Kochi 2.74 2.52

  17. Slide 17: Launches & Completions H1FY27

    Launches & Completions H1FY 27 LAUNCHES IN H1 FY27 L A U N C H E S B Y G E O G R A P H Y (msft) Developable Area opened Sr. No. Quarter Project Name New Project/Phase City Zone at the time of launch (msft) Pune 12% Mumbai 1 Q1 FY27 Emerald Bay (Tower B12) New Phase Pune PL-West 0.13 0.13 msft 7% Q1

  18. Slide 18: Ongoing and New Launches

    Ongoing and New Launches Non-Bengaluru projects now account for 49% of the share of ongoing and 47% of Planned projects. Mumbai & Pune together constitute 25% of the Planned projects. ONGOING PORTFOLIO PLANNED & LAUNCH PIPELINE 1% 12% Bengaluru 24% 15% Chennai South 33.61 51% Mumbai 14.50 West msft

  19. Slide 19: Planned Projects

    Planned Projects 16.41 msft 13.96 msft Upto Q1FY28 UPCOMING LAUNCHES ACROSS SOUTH AND 16 Total Developable Area Total Developable Area Planned Launch WEST MARKETS Total New Including Including Timeline Launches 1.91 msft from existing projects) 1.91 msft from existing projects) Puravankara South Pur

  20. Slide 20: Update on Financials

    UPDATE ON FINANCIALS 05 ₹ 1,051 Cr Total Income For Q2 FY27 59% up Y-o-Y Update on ₹ 289 Cr Q2 FY27 EBITDA Financials Operational performance driving ₹ 82 Cr Q2FY27 Profit After Tax consistent profitability and value creation. Artist’s impression of Provident Winworth, Kochi DIVERSE MARKETS STRONG D

  21. Slide 21: Consolidated Statement of Profit & Loss – H1 FY27

    Consolidated Statement of Profit & Loss FOR THE SIX MONTHS ENDED SEPTEMBER 30, 2026 ₹ 1,928 Cr + 60% 1,722 TOTAL INCOME REVENUE GROWTH UNITS HANDED OVER H1 FY27 YoY H1 FY27 (All numbers in ₹ Cr) Particulars H1 FY27 H1 FY26 OPERATIONAL HIGHLIGHTS I. INCOME Revenue from operations 1,881 1,169 Other in

  22. Slide 22: Consolidated Statement of Profit & Loss – Q2 FY27

    Consolidated Statement of Profit & Loss FOR THE QUARTER ENDED SEPTEMBER 30, 2026 ₹ 1,051 Cr + 59% 977 TOTAL INCOME REVENUE GROWTH UNITS HANDED OVER Q2 FY27 YoY Q2 FY27 (All numbers in ₹ Cr) Particulars Q2 FY27 Q1 FY27 Q2 FY26 OPERATIONAL HIGHLIGHTS I. INCOME Revenue from operations 1,033 849 644 Oth

  23. Slide 23: Balance Sheet

    Balance Sheet CONSOLIDATED BALANCE SHEET AS AT SEPTEMBER 30, 2026 30-Sep-26 31-Mar-26 30-Sep-26 31-Mar-26 EQUITY AND LIABILITIES Unaudited Audited ASSETS Unaudited Audited Shareholders’ Funds Non-Current Assets (a) Equity share capital 119 119 (a) Property, plant and equipment 296 235 (b) Other equi

  24. Slide 24: Update on Cash Flows

    UPDATE ON CASH FLOWS 06 ₹ 8,149 Cr Estimated Surplus From Ongoing Projects Cash ₹ 1,692 Cr Flows Estimated Surplus From Commercial Projects Cashflow generation ₹ 8,725 Cr from portfolio projects Estimated Surplus from Pipeline Projects Artist’s impression of Purva Orient Grand, Bangalore DIVERSE MAR

  25. Slide 25: Direct Cashflows

    Direct Cashflows ₹ IN CRORES S.No. Cash Flow Statement Q2 FY27 Q1 FY27 Q2 FY26 H1 FY27 H1 FY26 Half Year YoY Operating Inflows Collection from operations 1,813 1,423 1,182 3,236 2,144 51% (₹ Cr) Operating +51% A Inflows Collection from other than operations - - - - - Total Operating Inflows 1,813 1,

  26. Slide 26: Cash Flow Potential

    Cash Flow Potential STRONG CASHFLOW VISIBILITY AND SIGNIFICANT FUTURE SURPLUS ₹ 18,566 Cr ₹ 6,585 Cr ₹ 8,725 Cr CASHFLOW VISIBILITY TOTAL ESTIMATED SURPLUS BALANCE COLLECTION FROM SOLD UNITS PIPELINE PROJECTS ₹ 8,149 Cr estimated surplus (Next 3–5 Years) ~67% of Balance Cost to Complete SURPLUS POTE

  27. Slide 27: Cash Flow and Debt Management

    Cash Flow and Debt Management ESTIMATED SURPLUS VISIBILITY ₹ 18,566 Cr ₹ 8,149 Cr ₹ 8,725 Cr ₹ 2,366 Cr CAPITAL STRENGTH TOTAL SURPLUS POTENTIAL SURPLUS FROM SURPLUS FROM NET DEBT (A+B+C) ONGOING PROJECTS PIPELINE PROJECTS INR 18,566 Cr projected surplus Sufficiently covers the total debt Particular

  28. Slide 28: Capital Management

    EFFICIENT CAPITAL MANAGEMENT 07 ₹ 2,366 Cr Net Debt Capital Management 1.26 x Net Debt-Equity Ratio Capital structure and liquidity position aligned with ongoing development and business activities. Artist’s impression of Purva Aspire, Pune DIVERSE MARKETS STRONG DEMAND EXECUTION EXCELLENCE LONG-TER

  29. Slide 29: Debt Movement

    Debt Movement QUARTER ON QUARTER DEBT MANAGEMENT › DEBT MOVEMENT PATTERN (₹ in Crores) KEY HIGHLIGHTS Particulars Sep-26 Jun-26 Mar-26 Dec-25 Opening Balance 3,942 4,016 3,564 3,599 Cost of debt reduced to 10.94% Net Addition (Repayment) -180 -74 452 -35 in Q2 FY27. Debt Outstanding** 3,763 3,942 4,

  30. Slide 30: Debt Composition and Repayment Schedule

    Debt Composition and Repayment Schedule D E B T P R O F I L E W I T H R E P AY M E N T S C H E D U L E DEBT COMPOSITION (₹ Cr) REPAYMENT SCHEDULE AS AT 30 SEPTEMBER 2026 (₹ Cr) As at As at Increase/(decrease) 30 September 2026 30 June 2026 Residential 2,753 2,686 67 More than 3 years 759 20% Land 45

  31. Slide 31: Project Status

    PROJECT STATUS 08 Project Status BUILDING TODAY FOR A BRIGHTER TOMORROW 30 Artist’s impression of Purva Emerald bay, Pune

  32. Slide 32: Expanding Redevelopment Portfolio in Mumbai

    Expanding Redevelopment Portfolio in Mumbai Strengthening our presence across high-value micro-markets through strategic redevelopment opportunities. 6.04 msft 3.56 msft 7 PROJECTS DEVELOPABLE AREA SALEABLE AREA ACROSS MUMBAI Miami, Breach Candy Deccan, Pali Hill Apna Ghar 3, Malabar Hill - Project

  33. Slide 33: Recent Land Acquisitions

    Recent Land Acquisitions WITH INR 14,100 Cr GDV-H1 FY27 INR 14,100 Cr 7 3 10+ msft CITIES Mandur, 2,300 Cr Doddagubbi, 1,100 Cr Bengaluru GDV North Bengaluru GDV Secures 14.57-acre land parcel in Mandur, Bengaluru, Entered a joint development for a 11.23-acre land with GDV of Rs 2,300 crores, offeri

  34. Slide 34: Update on Possession for Completed Projects

    Update on Possession for Completed Projects EXECUTION TRANSLATING INTO FUTURE REVENUE VISIBILITY 977 Units 0.97 msft 4.28 msft 3,644 Units Total possession in Total possession Completed inventory Completed inventory Units in Q2 FY27 Area in Q2 FY27 pending recognition pending recognition Particulars

  35. Slide 35: Project Status – Completed Projects

    Project Status – Completed Projects WITH INVENTORY AS ON SEPTEMBER 30, 2026 12.61 msft 11,203 Units 87% 1.49 msft Sold (Area) Completed Inventory Total Units Residual inventory Of launched Developable JD / JV Share Puravankara’s Share - Area EXECUTION HIGHLIGHTS Total Flats Sold Cumulative Inventory

  36. Slide 36: Project Status – Under Construction

    Project Status – Under Construction AS ON SEPTEMBER 30, 2026 25.02 msft 19,067 63% 7.93 msft Under Construction Total Development Sold Area Unsold Inventory (Developable Area) Units of Launched Projects (Area) Puravankara South Puravankara West Overall Portfolio (Under Construction) 17 Projects | 20

  37. Slide 37: Project Status – Not yet open for Sale

    Project Status – Not yet open for Sale AS ON SEPTEMBER 30, 2026 8.58 msft 2,897 Units 2,618 units 11 Upcoming Pipeline Total Units in pipeline Unsold inventory Phases / Projects (Developable Area) (Group's Share) Future Launches LAUNCH READINESS Developable JD / JV Share Puravankara’s Share - Area U

  38. Slide 38: Ongoing (Open for Sale) Residential Projects – City Wise

    Ongoing (Open for Sale) Residential Projects – City Wise AS ON SEPTEMBER 30, 2026 26 25.02 msft 21.41 msft 13.48 msft 7.93 msft Total Projects Total Area Puravankara’s Sold Area Inventory Share of Area Puravankara’s AREA (MSFT) BREAK-UP BY CITY Total Projects Area Sold Area Inventory City share (No'

  39. Slide 39: Environment Social & Governance

    ENVIRONMENT, SOCIAL & GOVERNANCE 09 Environment Social & Governance EN V I R O N M E N TA L S T E WA R D S H I P AND S U STAINAB LE O P E RAT IO NS 38 Artist’s impression of Purva Seasons, Bangalore

  40. Slide 40: ESG – Progress and Priorities

    ESG – Progress and Priorities ENVIRONMENTAL STEWARDSHIP AND SUSTAINABLE OPERATIONS 1 ENVIRONMENTAL ACTIONS AND EMISSIONS 2 SUSTAINABLE PROJECTS AND COMPLIANCE DRIVING RENEWABLE ENERGY, EMISSIONS MANAGEMENT AND RESPONSIBLE OPERATIONS IMPLEMENTING ENVIRONMENTAL CONTROLS, GREEN BUILDINGS AND SITE IMPRO

  41. Slide 41: Good Governance Practices

    GOOD GOVERNANCE PRACTICES 10 Good Governance Practices ETHICAL LEADERSHIP.TRANSPARENT ACTIONS .S U S T A I N A B L E V A L U E C R E A T I O N . 40 Artist’s impression of Purva KVN Northern Lights, Bangalore

  42. Slide 42: Board of Directors

    P U R AVA N K A R A L I M I T E D Board of Directors Experienced leadership driving strategic growth and governance excellence. MR. RAVI PURAVANKARA MR. ASHISH R PURAVANKARA MS. AMANDA JOY PURAVANKARA MR. ANUP SHAH SANMUKH MR. K.G KRISHNAMURTHY MS. SHAILAJA JHA CHAIRMAN MANAGING DIRECTOR WHOLE_TIME

  43. Slide 43: Leadership Team

    P U R AVA N K A R A L I M I T E D Leadership Team Experienced leadership driving strategic growth and governance excellence. MR. RAVI PURAVANKARA MR. ASHISH R PURAVANKARA MS. AMANDA JOY PURAVANKARA MR. MALLANNA SASALU MR. RAJAT RASTOGI MR. NIRAJ GAUTAM CHAIRMAN MANAGING DIRECTOR WHOLE_TIME DIRECTOR

  44. Slide 44: Artist's impression of Purva Silversky, Bangalore

    11 Artist’s impression of Purva Silversky, Bangalore 43

  45. Slide 45: Our Growth Story in the News

    Our Growth Story in the News WIDELY COVERED ACROSS LEADING PLATFORMS Puravankara enters Puravankara Bags Rights Puravankara signs JDA for Bengaluru Delhi-NCR market to Redevelop 3 Societies project with ₹1,100 crore GDV in Mumbai The 7.83-acre project near Electronic City will have about 0.89 millio

  46. Slide 46: Awards and Accolades

    Awards and Accolades Recognised for excellence, innovation and our commitment To creating a positive impact. Orient Grand- CIDC Vishwakarma Luxury Real Estate Awards 2025: Project of the Year Achievement Award The Times Real For social Estate Conclave & Development & Awards Impact Developer of the Y

  47. Slide 47: Shareholding Pattern

    Shareholding Pattern AS AT SEPTEMBER 30, 2026 KEY SHAREHOLDERS Diverse and credible investor base reflecting strong institutional trust. FPIs holding more than 2% Insurance • Atyant Capital Companies • Gothic Corporation • Duke Endowment 0.37% • Vanguard AIF • BNP Paribas 0.20% • Morgan Stanley Asia

  48. Slide 48: Share Price Movement

    Share Price Movement RELATIVE PERFORMANCE OVER THE LAST 12 MONTHS PRICE PERFORMANCE (REBASED TO 100) 20% 0% -20% -40% -60% -80% -100% Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Purva Sensex BSE 01-Oct-25 30-Sep-26 PURVA 263.25 206.85 SENSEX 80,173.24 72,529.0

  49. Slide 49: Recently Completed Projects

    APPENDIX 2 Recently Completed Projects Delivering quality spaces. Strengthening Communities PROVIDENT WINWORTH PURVA CLERMONT (Tower A) KOCHI MUMBAI Saleable Area (Group Share) Saleable Area (Group Share) 0.54 msft 0.14 msft Puravankara Limited · Investor Presentation Q2 FY27 48

  50. Slide 50: Ongoing Projects

    APPENDIX 2 Ongoing Projects Delivering quality spaces. Strengthening Communities PROVIDENT DEANSGATE PURVA BLUBELLE BENGALURU BENGALURU Saleable Area (Group Share) Saleable Area (Group Share) 0.60 msft 0.57 msft Puravankara Limited · Investor Presentation Q2 FY27 49

  51. Slide 51: Ongoing Projects

    APPENDIX 2 Ongoing Projects Delivering quality spaces. Strengthening Communities PROVIDENT EQUINOX PURVA ORIENT GRAND BENGALURU BENGALURU Saleable Area (Group Share) Saleable Area (Group Share) 1.95 msft 0.26 msft Puravankara Limited · Investor Presentation Q2 FY27 50

  52. Slide 52: Ongoing Projects

    APPENDIX 2 Ongoing Projects Delivering quality spaces. Strengthening Communities PROVIDENT BOTANICO PURVA WINDERMERE BENGALURU CHENNAI Saleable Area (Group Share) Saleable Area (Group Share) 1.52 msft 2.16 msft Puravankara Limited · Investor Presentation Q2 FY27 51

  53. Slide 53: Ongoing Projects

    APPENDIX 2 Ongoing Projects Delivering quality spaces. Strengthening Communities PURVA MERAKI PROVIDENT ECOPOLITAN BENGALURU BENGALURU Saleable Area (Group Share) Saleable Area (Group Share) 0.12l msft 1.30 msft Puravankara Limited · Investor Presentation Q2 FY27 52

  54. Slide 54: Ongoing Commercial Projects

    APPENDIX 2 Ongoing Commercial Projects Delivering quality spaces. Strengthening Communities Block B Block D PURVA AEROCITY BENGALURU Saleable Area (Group Share) 1.33 msft Puravankara Limited · Investor Presentation Q2 FY27 53

  55. Slide 55: Disclaimer

    Disclaimer This presentation has been prepared by Puravankara Limited (“Company”) solely for providing information about the Company and its subsidiaries and joint ventures. The forward-looking statements appear in a number of places throughout this presentation and include statements regarding the

  56. Slide 56: Thank You

    THANK YOU Puravankara Limited 130/1, Ulsoor Road, Bengaluru - 560042 Tel: 080-25599000/43439999 Corporate Identification Number : L45200KA1986PLC051571 Website:- https://www.puravankara.com/ Investor Relations Contact: Email –investors@puravankara.com; Investor Presentation Q2 FY 27 55

Puravankara — Q2 FY27 Earnings Presentation on 6ix