  1. Slide 1: Merdeka Copper Gold Investor Presentation

    MERDEKA COPPER GOLD INVESTOR PRESENTATION August 2024 IDX: MDKA I www.merdekacoppergold.com Investor Presentation – August 2024

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by PT Merdeka Copper Gold Tbk (“Merdeka” or “MDKA”) and consists of written materials/slides for a presentation concerning Merdeka. By reviewing/attending this presentation, you agree to be bound by the following considerations: • No representation or w

  3. Slide 3: Portfolio Overview

    PORTFOLIO OVERVIEW Merdeka controls a portfolio of globally significant assets across Indonesia with group mineral resources containing: 36.4Moz 8.5Mt 13.8Mt 1.0Mt TUJUH BUKIT COPPER PROJECT GOLD COPPER NICKEL COBALT SCM MINE Ownership: 100% Ownership: 51.0% Status: Optimisation studies Resources: 1

  4. Slide 4: Corporate Structure

    CORPORATE STRUCTURE Thohir Group Other Merdeka Shareholders 5% 44% Other MBM Shareholders IDX: MDKA 7.6% 50.0% 42.4% JV partner on mine, JV partner for HPAL plants processing facilities and IKIP IDX: MBMA 4 Investor Presentation – August 2024

  5. Slide 5: Major Shareholders

    MAJOR SHAREHOLDERS •Provident, Major Saratoga and the Thohir Group have a long history of co-investments with a proven track record in building Shareholders multi-billion-dollar companies, and attracting high quality institutional investors Thohir Group • Provident has created and driven the success

  6. Slide 6: Pani Gold Project

    PANI GOLD PROJECT Pani is currently under construction and will be one of the largest gold mines in Asia Pacific upon achieving full design production capacity 70% 6.9Moz Ownership Contained gold resources 2025 5.5Moz Expected first gold Indicated gold resources production from heap- leach operation

  7. Slide 7: Economic Highlights

    ECONOMIC HIGHLIGHTS Pani is expected to deliver robust project economics and attractive returns Indicative Financial Metrics $2.6b $840m $6.2b 40% Post-tax NPV8 Average revenue per annum Cumulative Free cash flow IRR $550m ~$250m ~$600 & 900/oz Average EBITDA per annum Upfront capital Cash cost and

  8. Slide 8: Production Highlights

    PRODUCTION HIGHLIGHTS Pani is expected to deliver robust returns with a cumulative LOM gold production of 4.7Moz Key Operational Metrics 191Mt 19.0Mtpa ~90% 500,000oz Ore mined Peak processing capacity Average gold recoveries Peak gold production Pani Production Plan Heap leach CIL 2025 2026 2027 20

  9. Slide 9: One of the Largest Undeveloped Gold Mines in APAC

    ONE OF THE LARGEST UNDEVELOPED GOLD MINES IN APAC Pani is a low-cost gold development project with target production in excess of 500,000 ounces of gold per annum • One of the Largest Undeveloped Gold Mines in APAC Select Gold Projects in Asia Pacific ranked by AISC, Grade and Total Contained Gold1

  10. Slide 10: Tier Production Profile

    TIER 1 PRODUCTION PROFILE Pani is positioned to be a globally significant, primary gold mine producing 500,000+ ounces of gold per annum • One of the Largest Undeveloped Gold Mines in APAC Top Global Primary Gold Mines ranked by Production (koz p.a.)1 2,842 2,000 1,815 1,643 816 801 717 710 693 691

  11. Slide 11: Pani Development Progress

    PANI DEVELOPMENT PROGRESS Pre-development construction activities continued across the site, with the development of independent access roads Road Access to Site Access Road Mining Open Pit Site Access Road Road Access to Mining Open Pit 11 Investor Presentation – August 2024

  12. Slide 12: Pani Development Progress continued

    PANI DEVELOPMENT PROGRESS continued Establishment of accommodation facilities Office Accommodations 12 Investor Presentation – August 2024

  13. Slide 13: Pani Development Progress continued

    PANI DEVELOPMENT PROGRESS continued Supporting infrastructure and bypass bridges 13 Investor Presentation – August 2024

  14. Slide 14: Tujuh Bukit Copper Project

    TUJUH BUKIT COPPER PROJECT TB Copper is a globally significant, development ready, underground copper-gold porphyry project, convenient situated beneath Merdeka’s TB gold mine 100% 8.5Mt Ownership Contained copper resources PFS 27.9Moz Completed in May 2023 Contained gold resources UNDERGROUND Mine

  15. Slide 15: Development Strategy

    DEVELOPMENT STRATEGY The PFS demonstrates that TB Copper will be a globally significant underground mine extracting only 24% of the currently defined mineral resource 15 Investor Presentation – August 2024

  16. Slide 16: TB Copper Is a Globally Significant Copper-Gold Deposit

    TB COPPER IS A GLOBALLY SIGNIFICANT COPPER-GOLD DEPOSIT TB Copper is anticipated to be a low-cost and long-life operation with a 1st quartile cost copper operation Globally Significant Copper Mines by Copper and Gold Grade 2.5 : Size indicates resource, Ore tonnage (tonnes) 2.0 Khoemacau Resource Go

  17. Slide 17: Competitive Cycle-Proof Cost Structure

    COMPETITIVE “CYCLE-PROOF” COST STRUCTURE TB Copper is anticipated to be a low-cost, long-life operation with a 1st quartile AISC of US$1.0/lb net of gold credits – Competitive •favourably positioned“Cycle-Proof” Cost compared to peer SLC Structure and block caving operations Global Copper Cost Curve

  18. Slide 18: TB Gold Mine

    TB GOLD MINE TB gold mine was developed by Merdeka’s inhouse construction team and has been in continuous production since 2017 delivering over one million cumulative ounces of gold 25,382oz US$1,110/oz Gold produced in Q2 2024 Cash cost in Q2 2024 100-120koz US$900–1,050/oz 2024 production guidance

  19. Slide 19: Wetar Copper / Pyrite Mine

    WETAR COPPER / PYRITE MINE Wetar is a mature operation with a highly valuable stockpile of pyrite ore – capable for reprocessing at the AIM plant to extract a multiple suite of non-ferrous products 3,626t US$2.66/lb Copper produced in Q2 2024 Cash cost in Q2 2024 14,000-16,000t US$3.25-4/lb 2024 pro

  20. Slide 20: Overview of MBM Assets

    OVERVIEW OF MBM ASSETS MBM assets are strategically located in central Sulawesi, Indonesia’s battery materials hub SCM Mine Mineral resource of 1.1 billion dmt containing 13.8Mt of nickel (77% limonite) and 1.0Mt of cobalt HPAL Processing Developing multiple HPAL plants in partnership with leading b

  21. Slide 21: SCM Mine

    SCM MINE The SCM Mine was discovered by Rio Tinto in 2000 and is regarded as one of the world’s largest nickel deposits • SCM Mine Overview 51% 65Mtpa Multi-decade MBMA Ore production Mine life ownership target 1.1 billion dry metric tonnes (dmt) containing 13.8Mt Resources: of nickel and 1.0Mt of c

  22. Slide 22: SCM Mine Haul Road

    SCM MINE HAUL ROAD MBM owns a dedicated haul road linking the mine site to IMIP facilitating consistent ore delivery 22 Investor Presentation – August 2024

  23. Slide 23: SCM Mine – Huayou FPP

    SCM MINE – HUAYOU FPP Huayou feed preparation plant, situated within the SCM Mine concession area, and underground slurry pipeline is now operational FPP Area FPP Facilities (camp, warehouse, workshop, office) FPP Area Camp 23 Investor Presentation – August 2024

  24. Slide 24: HPAL Development Plan

    HPAL DEVELOPMENT PLAN MBM is developing multiple HPAL processing plants in partnership with leading battery material companies HPAL JV MBM ownership Nameplate capacity Target commissioning Location PT ESG New 60% 30ktpa End 2024 Energy Material 12.5% 25ktpa Q1 2025 PT Meiming New Energy Material 67%

  25. Slide 25: PT ESG HPAL Overview

    PT ESG HPAL OVERVIEW PT ESG is a brownfield HPAL expansion project, adjacent to QMB, an existing, profitable HPAL plant operated by GEM Ramp up Profile Capital Cost JV Partner Profile ~US$600m STAGE 1 STAGE 2 20ktpa +10ktpa + working capital. GEM Nameplate capacity Nameplate capacity committed to co

  26. Slide 26: PT ESG Site Photo

    PT ESG SITE PHOTO Construction is advancing ahead of anticipated project commissioning in Q4 2024 HPAL plant construction progress 26 Investor Presentation – August 2024

  27. Slide 27: RKEF Plants Overview

    RKEF PLANTS OVERVIEW MBM operates three RKEF plants producing low-cost NPI for the stainless steel and battery material markets Overview 50.1% 88ktpa 2020 MBMA Nameplate capacity Achieved commercial ownership (Ni in NPI) production Product: Nickel pig iron containing ~12% nickel Saprolite nickel ore

  28. Slide 28: Nickel Matte Overview

    NICKEL MATTE OVERVIEW HNMI produces a high-grade nickel matte product enabling MBM to capture the additional margin to NPI Overview LGNM Facility HNMI 60% 50ktpa 2022 MBMA Avg. production Achieved commercial ownership (Ni in HGNM) production Processing Facility Product: High-grade nickel matte conta

  29. Slide 29: AIM Plant Overview

    AIM PLANT OVERVIEW AIM is a highly strategic asset – well positioned to benefit from the growth in acid demand expected as additional HPAL plants are constructed at IMIP and across Indonesia Overview 80% 1.2Mtpa 2024 MBMA Acid production Achieved commercial ownership production Acid and steam (used

  30. Slide 30: Capturing the Entire Battery Value Chain

    CAPTURING THE ENTIRE BATTERY VALUE CHAIN MBM is a vertically integrated operation with existing, profitable nickel processing facilities and near term production from HPAL plants to capture the full battery materials value chain Limonite, Acid, SCM Mine AIM Plant Limestone Mine Steam, Limestone 3RD

  31. Slide 31: Commitment to Sustainability

    COMMITMENT TO SUSTAINABILITY ‘A’ Top Quartile ESG Sector Leader ESG Leaders Index MSCI ESG Rating Sustainalytics ESG IDX Kehati MSCI Indonesia Risk Rating IDX KEHATI Index constituents Index consists of large and mid-cap Highest rating received by an Indonesian Metals Metals & Mining Companies repre

  32. Slide 32: Summary

    SUMMARY Established and proven Strong Indonesian Transformational growth Commitment to sustainability, nickel, gold and copper shareholder support with projects supporting the safety, environmental production capability a proven track record of clean energy transition protection and corporate value

  33. Slide 33: Thank you

    Thank you investor.relations@merdekacoppergold.com www.merdekacoppergold.com Investor Presentation – August 2024

  34. Slide 34: Management Team with a Proven Track Record

    MANAGEMENT TEAM WITH A PROVEN TRACK RECORD Albert Saputro Jason Greive Andrew Starkey Gavin Caudle David Fowler Titien Supeno Eric Rahardja Boyke Abidin Peter Scanlon Luke Morris President Director CEO & Vice Chairman & Director Director CFO & Director Director Commercial and External Affairs Constr