Iron Road Ltd · ASX:IRD
Iron Road — Shareholder Meeting (November 2010)
15 slides from Iron Road's shareholder meeting presentation, Nov 12, 2010
Slide 1: Delivering Iron Ore Opportunities: On the Road to Development
Click to edit Master title style Iron Road limited For personal use only Delivering Iron Ore Opportunities On the Road to Development Andrew Stocks, Managing Director Annual General Meeting, 12 November 2010
Slide 2: Current Work
Current Work Iron Road limited Current work For personal use only Mineral Resource drilling Interim upgrade June 2010 328Mt Current drilling expected to add 400-800Mt Pre-feasibility study Infrastructure studies Community engagement and impact study Environmental baseline monitoring 2
Slide 3: Pre-feasibility Study
Pre-feasibility Study Iron Road limited Comprehensive pre-feasibility, with Oversight by Iron For personal use only Road and Evans & Peck Components include: Project implementation plan, scheduling, personnel, risk & opportunity management by Evans & Peck Geology, geotechnical and mining by Coff
Slide 4: CEIP – Key Aspects
CEIP – Key Aspects Iron Road limited Location For personal use only Infrastructure Geology Geometry Size Mineralogy Low variability Metallurgy State Government Communities 4 www.ironroadlimited.com.au
Slide 5: CEIP – Iron and Silica versus Grind Size
CEIP – Iron and Silica versus Grind Size Iron Road limited For personal use only Fe concentrate P80 @ 75µm 68.9% Fe 1.9% SiO2 0.00% P High grade blast furnace feed 5 www.ironroadlimited.com.au
Slide 6: CEIP – Concentrate Grade versus Grind Size
CEIP – Concentrate Grade versus Grind Size Iron Road limited For personal use only CEIP 6 www.ironroadlimited.com.au
Slide 7: CEIP – Processing Scenario for High Grade BF Product
CEIP – Processing Scenario for High Grade BF Product Iron Road limited Fe: 23.2% For personal use only SiO2: 47.9% D-LIMS ROM Ore 70% original mass Fe: 18.8% Crushing P80~ 21 mm SiO2: 53.0% 100% mass enters Cleaner W-LIMS Tails 30% of HPGR original mass Simple process Tails P80~75 µm 33% original
Slide 8: Current Drilling – Murphy South
Current Drilling – Murphy South Iron Road limited Murphy For personal use only Dolphin Boo-Loo Murphy South N Scale 1000m 8 www.ironroadlimited.com.au
Slide 9: Current Drilling – Murphy South Cross-Section
Current Drilling – Murphy South Cross-Section Iron Road limited For personal use only 400m 9 www.ironroadlimited.com.au
Slide 10: Concentrate Transport
Concentrate Transport Iron Road limited Numerous options For personal use only and routes under review ~160km slurry pipeline currently preferred transport medium Shared port – Sheep Hill Possible desalination unit at Sheep Hill New power transmission line from Port Augusta 10 www.ironroad
Slide 11: Pipeline Scenario Pump Station
Pipeline Scenario Pump Station Iron Road limited Example of typical For personal use only positive displacement pump station 11 www.ironroadlimited.com.au
Slide 12: Summary
Summary Iron Road limited Mineral Resource For personal use only Confirmation of high grade, clean concentrate Current drilling on track to deliver an additional 400-800Mt Large potential Exploration target of 2.8-5.7Bt Pre-feasibility study Simple process flow, waste early rejection
Slide 13: On the Road to Development
Iron Road limited For personal use only On the Road to Development 13 www.ironroadlimited.com.au
Slide 14: Notice: Forward-Looking Statements
Notice Iron Road limited Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Iron Road Limited. Statements concerning mining reserves For personal use only and resources may also be deemed to be forward looking statements in that they inv
Slide 15: Appendix – Iron Road Resource Statement
Appendix 1 – Iron Road Resource Statement Iron Road limited Boo-Loo Resource Estimate For personal use only Resource Material Mt Fe % SiO2 % Al2O3 % P% LOI % Classification Type Fresh 277 17.3 52.5 11.5 0.095 0.5 Inferred Transitional 13 17.0 52.4 11.6 0.094 10.7 Oxide 38 17.2 52.1 11.6 0.094 10.8 T