Slide 1: Wafi-Golpu Project
WAFI-GOLPU PROJECT A Greenfield copper-gold Project with a multi- generational value proposition BRYAN BAILIE EXECUTIVE PROJECT DIRECTOR 1 PNG Mining Conference – 30 November 2017
Slide 2: Safe Harbor Statement Harmony Gold Mining Company Limited
Private Securities Litigation Reform Act Safe Harbor Statement Harmony Gold Mining Company Limited Forward Looking Statements This presentation contains forward-looking statements within the meaning of the safe harbor provided by Section 21E of the Securities Exchange Act of 1934, as amended, and Se
Slide 3: Disclaimer Newcrest Mining Limited
Disclaimer Newcrest Mining Limited Forward Looking Statements This document includes forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipat
Slide 4: Multi-generational
Multi-generational Potential for Significant contribution to PNG economy Largest underground Large deposit with mine in PNG if significant scale developed Over 28 years, ore Projected long-life mine body open at depth Projected low operating Can sustain cost commodity cycles Open at depth Access to
Slide 5: Project Location
Project Location Current proposed Mine to Port footprint Highlands NADZAB Highway Airport Lae City & Concentrate Export Facility Northern Access Pipeline Corridor Road to site to and from site Huon Gulf SML – Mine site 5
Slide 6: Progressing the Project
Progressing the Project FEASIBILITY STUDY UPDATE PERMITTING PROCESS (Targeting completion by end March 2018) Improve design Update to SML 10 application supporting and business case documentation Additional data • Mine design Significant effort being put into environmental studies collection • Proce
Slide 7: Advancing Project to Production
Advancing Project to Production Long lead time from approval to production PERMITTING EXECUTION PHASE PHASE Permitting efficiency important to progressing the Project as quickly as possible Harmony and ±28 year operating mine will require fiscal and legislative stability Newcrest Board approvals 3 b
Slide 8: Proposed Mining Layout
Proposed Mining Layout Extensive Underground Development BC 1 BC 2 BC 3 8
Slide 9: Proposed Process Plant Surface Layout
Proposed Process Plant Surface Layout Compact , low environment impact footprint Water treatment Bulk power switch yard Water treatment Tailings pumps Flotation Maintenance facility Ore stockpile Milling Decline Mill feed conveyor conveyor Storm water 9 dam
Slide 10: Proposed Concentrate Export Facility Layout
Proposed Concentrate Export Facility Layout Concentrate dewatering and ship loading Mobile ship loading Concentrate dewatering conveyors and storage Lae Port Facility Water treatment and power generation 10
Slide 11: Indicative Power Demand
Indicative Power Demand Require reliable, low cost of supply Staged power generation solution required Construction power 11
Slide 12: Tailings Disposal Options
Tailings Disposal Options Regional context Simberi Ramu Nickel Minahasa Porgera Lihir Batu Hijau Bougainville Grasberg Ok Tedi Woodlark Hidden Valley Misima Yellow - Sub-sea White – Terrestrial 12 Blue - Riverine
Slide 13: Land-based Tailings Storage
Land-based Tailings Storage 13
Slide 14: Huon Gulf is a highly suitable Location for DSTP
Huon Gulf is a highly suitable Location for DSTP Huon Gulf New Britain Trench Huon Gulf Steep sub-sea slopes Deep Canyon Sediment movement River sediment towards New Britain migration pathways Trench – 9000m deep • Local rivers discharge 60mtpa of natural sediment into the Markham Canyon which repor
Slide 15: Working with our Stakeholders
Working with our Stakeholders Wafi-Golpu Project Community Development WASH, Agriculture, Transport, Capacity Building, Community Health, Infrastructure, Education, 15
Slide 16: Mining Chocolate – supporting agribusiness development
Mining Chocolate – supporting agribusiness development in the Wafi-Golpu Project area • Aided creation of a vibrant cocoa industry • Development of nurseries for high yielding cocoa seedlings • Crop husbandry training • Provision of fermenting and drying training • Provision of quality training and
Slide 17: Critical drivers for the project include:
Critical drivers for the project include: • The completion of the updated feasibility study, and Environmental impact statement • Completion of the permitting and approval by the Harmony and Newcrest Boards. • Stable, competitive legislative and fiscal regimes • Sustained landowner and community sup
Slide 18: Any questions?
EM TASOL – DANGE NGAYAM Any questions? 18 You can email me at grant.batterham@wafigolpujv.com Strictly Confidential