Harmony Gold Mining Co. Ltd. · JSE:HAR

Harmony Gold Mining — PNG Mining Conference 2017

18 slides from Harmony Gold Mining's conference presentation, Nov 30, 2017

  1. Slide 1: Wafi-Golpu Project

    WAFI-GOLPU PROJECT A Greenfield copper-gold Project with a multi- generational value proposition BRYAN BAILIE EXECUTIVE PROJECT DIRECTOR 1 PNG Mining Conference – 30 November 2017

  2. Slide 2: Safe Harbor Statement Harmony Gold Mining Company Limited

    Private Securities Litigation Reform Act Safe Harbor Statement Harmony Gold Mining Company Limited Forward Looking Statements This presentation contains forward-looking statements within the meaning of the safe harbor provided by Section 21E of the Securities Exchange Act of 1934, as amended, and Se

  3. Slide 3: Disclaimer Newcrest Mining Limited

    Disclaimer Newcrest Mining Limited Forward Looking Statements This document includes forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipat

  4. Slide 4: Multi-generational

    Multi-generational Potential for Significant contribution to PNG economy Largest underground Large deposit with mine in PNG if significant scale developed Over 28 years, ore Projected long-life mine body open at depth Projected low operating Can sustain cost commodity cycles Open at depth Access to

  5. Slide 5: Project Location

    Project Location Current proposed Mine to Port footprint Highlands NADZAB Highway Airport Lae City & Concentrate Export Facility Northern Access Pipeline Corridor Road to site to and from site Huon Gulf SML – Mine site 5

  6. Slide 6: Progressing the Project

    Progressing the Project FEASIBILITY STUDY UPDATE PERMITTING PROCESS (Targeting completion by end March 2018) Improve design Update to SML 10 application supporting and business case documentation Additional data • Mine design Significant effort being put into environmental studies collection • Proce

  7. Slide 7: Advancing Project to Production

    Advancing Project to Production Long lead time from approval to production PERMITTING EXECUTION PHASE PHASE Permitting efficiency important to progressing the Project as quickly as possible Harmony and ±28 year operating mine will require fiscal and legislative stability Newcrest Board approvals 3 b

  8. Slide 8: Proposed Mining Layout

    Proposed Mining Layout Extensive Underground Development BC 1 BC 2 BC 3 8

  9. Slide 9: Proposed Process Plant Surface Layout

    Proposed Process Plant Surface Layout Compact , low environment impact footprint Water treatment Bulk power switch yard Water treatment Tailings pumps Flotation Maintenance facility Ore stockpile Milling Decline Mill feed conveyor conveyor Storm water 9 dam

  10. Slide 10: Proposed Concentrate Export Facility Layout

    Proposed Concentrate Export Facility Layout Concentrate dewatering and ship loading Mobile ship loading Concentrate dewatering conveyors and storage Lae Port Facility Water treatment and power generation 10

  11. Slide 11: Indicative Power Demand

    Indicative Power Demand Require reliable, low cost of supply Staged power generation solution required Construction power 11

  12. Slide 12: Tailings Disposal Options

    Tailings Disposal Options Regional context Simberi Ramu Nickel Minahasa Porgera Lihir Batu Hijau Bougainville Grasberg Ok Tedi Woodlark Hidden Valley Misima Yellow - Sub-sea White – Terrestrial 12 Blue - Riverine

  13. Slide 13: Land-based Tailings Storage

    Land-based Tailings Storage 13

  14. Slide 14: Huon Gulf is a highly suitable Location for DSTP

    Huon Gulf is a highly suitable Location for DSTP Huon Gulf New Britain Trench Huon Gulf Steep sub-sea slopes Deep Canyon Sediment movement River sediment towards New Britain migration pathways Trench – 9000m deep • Local rivers discharge 60mtpa of natural sediment into the Markham Canyon which repor

  15. Slide 15: Working with our Stakeholders

    Working with our Stakeholders Wafi-Golpu Project Community Development WASH, Agriculture, Transport, Capacity Building, Community Health, Infrastructure, Education, 15

  16. Slide 16: Mining Chocolate – supporting agribusiness development

    Mining Chocolate – supporting agribusiness development in the Wafi-Golpu Project area • Aided creation of a vibrant cocoa industry • Development of nurseries for high yielding cocoa seedlings • Crop husbandry training • Provision of fermenting and drying training • Provision of quality training and

  17. Slide 17: Critical drivers for the project include:

    Critical drivers for the project include: • The completion of the updated feasibility study, and Environmental impact statement • Completion of the permitting and approval by the Harmony and Newcrest Boards. • Stable, competitive legislative and fiscal regimes • Sustained landowner and community sup

  18. Slide 18: Any questions?

    EM TASOL – DANGE NGAYAM Any questions? 18 You can email me at grant.batterham@wafigolpujv.com Strictly Confidential

Harmony Gold Mining Company — PNG Mining Conference 2017 on 6ix