Slide 1: Corporate Update and Plans for 2022
Corporate Update and Plans for 2022 GSPros 2022Metals Kick-off ConferenceJanuary 26, 2022 Exhibit 99.1
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT This presentation contains forward-looking statements regarding CORE that are intended to be covered by the safe harbor "forward-looking statements" provided by the Private Securities Litigation Reform Act of 1995, based on CORE’s current expectations and includes statement
Slide 3: Cautionary Note Regarding Estimates of Measured, Indicated and Inferred Resources
The Preliminary Economic Assessment (“PEA”) referenced herein was prepared in accordance with Canadian National Instrument 43-101 (NI 43-101). CORE is not subject to regulation by Canadian regulatory authorities and no Canadian regulatory authority has reviewed the PEA or passed upon its accuracy or
Slide 4: Developing Alaska's Next Gold Mine(s)
Developing Alaska’s Next Gold Mine(s) Manh Choh – Development Stage Project in partnership with Kinross and the Alaska Native Tetlin Tribe100% Owned Lucky Shot Mine – High-grade gold explorationThree Early-Stage Exploration Projects:ShamrockEagle-HonaTriple Z 4
Slide 5: Corporate Overview
CORPORATE OVERVIEW Now trading on the NYSE American: CTGO6.75 Million Shares Outstanding6.85 Million Shares Fully Diluted100,000 Options; No Warrants and No Long Term Debt~ $US17 Million Cash as of Jan. 2022Contango 30% owner of Peak JV; Kinross Owns 70% and is Operator100% owner of the Lucky Shot P
Slide 6: Manh Choh Gold Deposit
Manh Choh Gold Deposit1.3 Moz Gold – Measured plus Indicated Resources1Average grade = 4g/t Gold1Located in Alaska on the Alaska HwyOn Private Land Owned by the Tetlin Alaska Native TribeBusiness Partnership with Kinross – Paid $93 Million for 70% interest Using the Fort Knox Milling Facilities Lo
Slide 7: Near-Term Production Potential & Excellent Exploration Upside
NEAR-TERM PRODUCTION POTENTIAL & EXCELLENT EXPLORATION UPSIDE 7 MANH CHOH GOLD PROJECT NYSE-A:CTGO In September 2020 entered into JV agreement between Contango (30%) and Kinross (70% and Operator) to form new Peak Gold LLC, with Royal Gold and Tetlin Tribe retaining royalty interests;Plan is to mine
Slide 8: Manh Choh Gold Project: Anticipated Economics
MANH CHOH GOLD PROJECT: Anticipated Economics Using existing infrastructure at Fort Knox, the Peak Gold LLC is planning on a 2024 start dateKinross estimates +1 million oz gold production over a 5-year period equating to roughly 220,000 oz GEO per annum (30% to Contango Ore = 66,000 GEO/Yr)1Using el
Slide 9: Community Meetings - Tetlin Village
Community Meetings - Tetlin Village2500 direct engagements with stakeholders TokTanacrossNorthwayMentasta LakeDelta JunctionFairbanks Fox Tanana Chiefs ConferenceDoyon Alaska Chamber & AMA 9
Slide 10: Benefits to Alaska Residents and Businesses
10 MANH CHOH GOLD PROJECTBenefits to Alaska Residents and Businesses McKinley Research confirms jobs, economic boost to Tok, road and infrastructure enhancements, and taxes: • 250 to 300 new Construction jobs• 400 to 600 direct Mine and Trucking jobs plus indirect and induced jobs (2X)• The average
Slide 11: Manh Choh Gold Project Location
The project is located 15 km (10 mi) from the Alaska Hwy and 400 km (250 mi) to the Fort Knox Milling Complex 11 MANH CHOH GOLD PROJECT LOCATION MANH CHOH DEPOSIT Image used with permission from Kinross
Slide 12: Peak Gold JV Project Highlights
PEAK GOLD JV 12 Processing ore from the Peak Gold Project at Fort Knox avoids mill construction and is expected to decrease execution risk, lower capital expenditures, drive attractive returns, and reduce the project’s environmental footprint and permitting requirements.Leverages Fort Knox’s success
Slide 13: Manh Choh Gold 2021 Program
13 MANH CHOH GOLD 2021 PROGRAM Completed On Budget: $19 Million In-fill drilling to upgrade Resources from Indicated to Measured and Inferred to Indicated Categories – Reserves with FSCondemnation drill – Placement of FacilitiesMetallurgy – Testing Completed Hydrology – Water Management PlanIn-pit
Slide 14: Manh Choh Gold Project Simple Development Plan
14 MANH CHOH GOLD PROJECT Simple Development Plan $48 million 2022 BudgetTwo Open Pits with Development Rock/Waste materials adjacent to pitsNo Mill No Tailings FacilityFeasibility Study and Permitting are UnderwayFeasibility Study expected in 2H 2022Early construction to start in the summer of 2022
Slide 15: Manh Choh Gold Project and Surrounding Targets
15 MANH CHOH GOLD PROJECT AND SURROUNDING TARGETS Main MC North MC $3 Million Exploration Program Planned for 2022
Slide 16: Lower Risk & Reduced Timeline to Production Decision
16 LOWER RISK & REDUCED TIMELINE TO PRODUCTION DECISION DRILLING SCOPING STUDY PERMITTING & FEASIBILITY PRODUCTION DETAILED DESIGN PROCURMENTCONSTRUCTION $19 million Program in 2021: Resource In-fill, Hydrology, Geotechnical, Metallurgical Engineering; Environment and Community OutreachWith ~$2 mill
Slide 17: Reference
17 1 Hart, C.J.R., 2005. Mid-Cretaceous Magmatic Evolution and Intrusion-related Metallogeny of the Tintina Gold Province, Yukon and Alaska. Unpublished PhD thesis, University of Western Australia, 198 p. 1
Slide 18: Lucky Shot Property Historic Resources
Lucky Shot Property Historic Resources1 M&I: 206k Tonnes @ 18.3 g/t Gold for 121,500 Ounces of Contained Gold2 1 The historical production information presented is based upon reports file by the US Geological Survey from information provided by prior owners and operators of the mines. The Company ha
Slide 19: Lucky Shot Portal Circa 1930
Lucky Shot Portal Circa 1930 19
Slide 20: Lucky Shot Portal Circa 1930
Lucky Shot Portal Circa 1930 20
Slide 21: Lucky Shot Land Package
~17,000 acres of patented and State of Alaska mining claims Focus on Coleman-Lucky Shot-War Baby and Gold Bullion Mines 21
Slide 22: Lucky Shot Property Location
Lucky Shot Palmer Anchorage Willow Wasilla Mill Building Fairbanks Mill Building Parks Hwy Glenn Hwy Willow-Fishhook Rd Lucky Shot Property Palmer Wasilla 22
Slide 23: Lucky Shot: Established Infrastructure and High Grade
23 Established InfrastructureHigh Grade – 1 to 2 oz/t Historic grades1District Scale Potential – 30 historic minesWell understood geologyLarge digital databaseHired ex-Pogo Mine General Manager to lead Lucky Shot Program1 The historical production information presented is based upon reports filed by
Slide 24: Lucky Shot Property Historic Drill Intercepts
1 The historical production information presented is based upon reports file by the prior owners and operators of the mines. The Company has not undertaken any independent work to verify or confirm the previously reported information. The historical information may not be representative of future re
Slide 25: En: res *
aa} ; ae En: res * Coleman block By Lucky Shot block Om Ai a Hull 0 fy. yen 4 9 ,. \ 4 Wie ‘ . % .
Slide 26: CONTANGO OR=
CONTANGO OR= LO SILVER PER
Slide 27: 27
27
Slide 28: CONTANG® _ ae
) CONTANG® _ ae
Slide 29: Slide 29
Slide 30: Contango Exploration Plan for Lucky Shot Project
Contango Exploration Plan for Lucky Shot Project Rehab and extend existing Enserch tunnel in 2021-2022 to explore the Lucky Shot vein down-dip from historically produced 250,000 ounces at 40g/t average grade 1 - prep for exploration drilling in three stages:Stage 1a Rehabilitate and extend Enserch t
Slide 31: Contango ORE - Key Takeaways
31 CONTANGO ORE - Key Takeaways Image used with permission from Kinross Advancing our flagship project - 1.3 million ounce Manh Choh project in partnership with Tetlin Alaska Native Tribe and Kinross as OperatorKinross paid $93 Million for their 70% interest in Peak Gold JV$19 million 2021 program c
Slide 32: Thank You
GOLD SiLveR COPPER THANK YOU_
Slide 33: Corporate Inquiries
Corporate Inquires:info@contangoore.com+1-778-386-6227www.contangoore.com NYSE American: CTGO Twitter: @orecontangoLinkedIn: Contango OREInstagram: ContangoOREFacebook: Contango ORE
Slide 34: Non-GAAP Measures Notice
This presentation contains forward looking estimates of all-in sustaining cost (“AISC”), resources and EBITDA, which are a financial measure not determined in accordance with United States generally accepted accounting principles (“GAAP”). We cannot provide a reconciliation of estimated AISC, resour