Slide 2: Steelpoortdrift Vanadium Project - 1-2-1 & Mining Indaba Presentation
For personal use only Steelpoortdrift Vanadium Project 1-2-1 & Mining Indaba Presentation February 2023 ASX:VR8 WWW.VR8.GLOBAL
Slide 3: Disclaimer
Disclaimer This presentation does not constitute investment advice. This presentation has been prepared by Vanadium Resources Limited (“the Company” or ASX:VR8) to provide summary information about the Company and its activities as at the date of this presentation (February 2023). Neither this prese
Slide 4: Emerging Vanadium Producer
Emerging Vanadium Producer For personal use only One of the world’s largest and DFS indicates strong financial Ore body easy to mine, Using conventional / proven highest-grade vanadium outcomes with post-tax NPV7.5% of low strip ratio & low concentrate & Salt Roast Leach deposits US$1.2Bn (US$0.9Bn
Slide 5: Corporate Overview
Corporate Overview For personal use only Corporate Structure (ASX: VR8) – as at 1 February 2023 Top Shareholders Board of Directors 1 Danterne Pty Ltd1 9.4% Jurie Wessels 484.4m A$0.084 A$40.7m 2 Raubex Pty Ltd 9.1% Executive Chairman Shares on issue Share Price Market Cap (undiluted) (@ $0.084c) 3
Slide 6: Milestones Delivered
Milestones Delivered In the last 12 months VR8 has delivered important de-risking For personal use only milestones for Steelpoortdrift DFS completed on-time and on budget – Revised Mineral Resource and Ore Reserve providing validation for the development of estimate with enhanced block model and the
Slide 7: Why Vanadium
Why Vanadium Listed as a Critical Mineral in Australia, the US, UK and European Union, Vanadium For personal use only demand is expected to grow significantly from its energy storage capabilities Vanadium Redox Flow Batteries (VRFB’s) Steel & Alloys ➢ VRFBs forecast to represent between 15 – 25% of
Slide 8: Global Demand & Pricing Dynamics
Global Demand & Pricing Dynamics For personal use only Forecasters expect over 1,200GW of battery capacity to be added between today and 2050, with approximately 600GW before 2025.1 Could add up to 10,000mtV of Projection of MtV demand change 2020-2025 Vanadium Pentoxide 98% min Europe US$/lb demand
Slide 9: DFS Delivers World Class Vanadium Project
DFS Delivers World Class Vanadium Project For personal use only US$1.21bn US$896m US$152m 42% (A$1.9bn) (A$1.4bn) (A$237m) NPV7.5% (post-tax) Attributable NPV Yearly Free Cashflows IRR (post-tax) 27 months US$211m US$3.24 US$9.50 (A$329m) (Deloitte forward mid-range) Incl. Contingency Payback Start
Slide 10: Location – in the Bushveld Complex
Location – in the Bushveld Complex This world-renowned mining location is host to several mining For personal use only operations, multiple major mining companies are active in the area, and is in close proximity to existing infrastructure. Other Mines in the Bushveld Complex Vametco – Vanadium Mine
Slide 11: Mine, Concentrator & SRL
Mine, Concentrator & SRL Mine Site – View of the North of Mining Area For personal use only The mine site, concentrator and SRL sites are located within a substantial mining and smelting district, with well established infrastructure (including water, power, sealed roads, rail, etc) VR8 Offices and
Slide 12: Resources & Ore Reserves
Resources & Ore Reserves ➢ Global Mineral Resource of 680Mt at 0.70% V2O5 For personal use only ➢ Total Ore Reserve of 77Mt at 0.72% V2O5 ➢ Mineralisation outcrops at surface and dips shallowly (~10º) – less waste to mine, low strip ratios (0.88x waste : ore) and cheaper mining cost ➢ Orebody able t
Slide 13: Global Primary Resources
Global Primary Resources 3.0% 2100 For personal use only Tonnes In Situ Grade Concentrate Grade 1800 2.5% Resource Tonnage (Millions) 1500 2.0% 1200 %V2O5 1.5% 900 1.0% 600 0.5% 300 0.0% 0 Largo Glencore Bushveld Bushveld Bushveld Vanadium Australian Richmond Technology Maracás Rhovan Vametco Brits
Slide 14: Location of Mineral Resources & Ore Reserves
Location of Mineral Resources & Ore Reserves ➢ The final pit design and Ore Reserves based on LOM of 25 For personal use only years (designed to match Mining Right term) ➢ Final pit design was based on Pit 17, which highlights potential for a larger ultimate pit design ➢ Ore Reserves represents 12%
Slide 15: Open Pit Design and Schedule
Open Pit Design and Schedule For personal use only ➢ Detailed pit designs have been developed across three open pits and scheduled over the 25-year life of the project ➢ The mining schedule was able to achieve high ROM grades of greater than 0.80% V2O5 for the first 8 years, with a LOM average grade
Slide 16: Concentrator Plant
Concentrator Plant For personal use only Concentrator flow sheet based on proven technology Two-stage Crushing Circuit Wet Magnetic Separation Dewatering Ball Milling Regrind Magnetic Concentrate Product @ Separation Areas 2.08-2.16% V2O5 Dewatering 14 WWW.VR8.GLOBAL
Slide 17: SRL Plant
SRL Plant For personal use only SRL flow sheet based on proven technology SO2 Scrubber SRL Plant comprises kiln Kiln roasting, desilification, Roasting ammonium metavanadate (“AMV”) precipitation, flash Crystalliser drying and V205 flake production Flash Concentrate feed rate of 790ktpa Drying with
Slide 18: Peer Comparison
Peer Comparison Largo Maracas1,2&3 Steelpoortdrift (VR8) 4&5 Bushveld Mokopane6 TMT Project7,8 AVL Project9 Richmond Vanadium10 For personal use only In Production DFS Stage PFS Stage DFS Stage BFS stage PFS Stage (Results as at 30 Dec 2021) V2O5 Price US$7.80/lb US$9.50/lb US$7.50/lb US$10.50/lb US
Slide 19: Offtake, Strategic Investment and Project Financing
Offtake, Strategic Investment and Project Financing Commenced process toward securing binding offtake, strategic For personal use only investment and project financing Offtake Agreement & Strategic Investment ➢ A process is underway with a range of international traders and downstream users of vanad
Slide 20: ESG Initiatives
ESG Initiatives For personal use only Renewable electricity Dry deposition of Co-products Community supply tailings Inclusion of PV solar plant Dewatering of tailings Studies underway to unlock Initiatives to maximize reduces carbon footprint and material means reduced risk value from other metals c
Slide 21: Preliminary Project Timeline
Preliminary Project Timeline For personal use only Year CY23 CY24 CY25 Quarter Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Environmental & Water Permits Build Project Development & Operations Team FEED Offtake & Strategic Investment Debt Financing FID Engineering & Procurement Construction Production (incl.
Slide 22: Growth Catalysts to Increase Shareholder Value
Growth Catalysts to Increase Shareholder Value For personal use only Key Catalysts to FID ➢ Secure long-term offtake(s) ➢ Secure project funding from combination of: ➢ Ropeway conveyor from Mine to SRL plant i. Debt ~65% PF debt Optimise ➢ Delineation drilling and re-optimisation ii. Equity ~35% fro
Slide 23: Investment Highlights
Investment Highlights Strong financials with attributable NPV of A$1.4bn, IRR of 42% For personal use only and payback period of 27 months Unlocking Steelpoortdrift as one of the Competitive Capex (US$211m) and lowest quartile Opex (Cash Cost US$3.24/lb) world’s largest and highest-grade Long life p
Slide 24: Appendix
For personal use only Appendix February 2023 ASX:VR8 WWW.VR8.GLOBAL
Slide 25: Board & Management
Board & Management Jurie Wessels has 26 years’ experience in the exploration industry and co-founded a number of exploration and mining companies, including Bauba Resources For personal use only Ltd (BAU.J), which owns three operating chrome mines, GoldStone Resources Ltd (GRL.L), which company is m
Slide 26: Peer Comparison Table
Peer Comparison Table Resourc Resource Concentrate For personal use only Company Code Project Stage Resource Category e Information Source Grade Grade Tonnes Measured, Indicated Largo LGO.TSX Maracas Production 79 0.79 2.46 Largo Maracas NI43-101 Technical Report - 16th December 2021 & Inferred (NI4