  1. Slide 1: Developing a Next Generation Industrial Raw Materials Supplier

    VA N A D I U M RESOURCES rsonal use only INVESTOR PRESENTATION –5 OCTOBER 2026 Developing a Next Generation Industrial Raw Materials Supplier Building a tier-1, integrated critical raw materials enterprise supplying Western markets​ ASX: VR8 | www.vr8.global Page 1

  2. Slide 2: Disclaimer, Forward-looking Statements & Cautionary Statement

    IMPORTANT NOTICE Disclaimer, Forward-looking Statements & Cautionary Statement This presentation has been prepared by Vanadium Resources Limited (“the Company” or ASX: VR8) to provide summary information about the Company and its activities. It does not constitute investment, financial, legal or tax

  3. Slide 3: Cautionary Statement (Continued)

    IMPORTANT NOTICE Cautionary Statement (Continued) Cautionary Statement (Continued): The information in this announcement relating to the pit optimisation, pit design, mining inventory and mining schedule (Mining Information) was originally compiled by consultants engaged for the Company's Definitive

  4. Slide 4: Building Blocks to Critical-Raw-Materials Production

    STRATEGY 6 Building Blocks to Critical-Raw-Materials Production FORGING A TIER-1 PRODUCER OF VANADIUM-SLAG, PIG-IRON AND TITANIUM-SLAG 1 rsonal use only 1. VTM 2. VTM 3. Tier 1 Mineral Resource Magnetic Concentration Next-gen V-Iron plant Steelpoortdrift: A world-class, high grade and Concentration:

  5. Slide 5: Experienced Team Driving V-Iron Plant Development

    BOARD & MANAGEMENT Experienced Team Driving V-Iron Plant Development PROJECT-DEVELOPMENT, PROJECT-FINANCE AND BUSHVELD MINING AND PROCESSING EXPERTISE Board Management rsonal use only JURIE WESSELS | Executive Chairman 0 NICK DIACK | CEO Jurie Wessels is a qualified lawyer and founder of Vanadium Re

  6. Slide 6: Scoping Study Financial Metrics - Base Case Scenario

    V-IRON PLANT SCOPING STUDY Scoping Study Financial Metrics1 - Base Case Scenario All financials are presented on a 100% Project Basis. VR8 holds a 100% interest in the V-Iron plant and an 86.49% interest in the Steelpoortdrift Project. CAPEX & OPEX estimated accuracy of ±30%. The Scoping Study is pr

  7. Slide 7: Scoping Study Sensitivity (Post-tax USD NPV) & Base Case Scenario

    V-IRON PLANT SCOPING STUDY Scoping Study Sensitivity (Post-tax USD NPV) & Base Case Scenario1 All financials are presented on a 100% Project Basis. VR8 holds a 100% interest in the V-Iron plant and an 86.49% interest in the Steelpoortdrift Project. CAPEX & OPEX estimated accuracy of ±30%. The Scopin

  8. Slide 8: Where the Project Sits in the Commodity Price Cycle

    V-IRON PLANT SCOPING STUDY Where the Project Sits in the Commodity Price Cycle1 Both commodities are indexed to their Base Case price (= 100) using 20 years of real price history (2006 to 2025, 2026 US dollars): Base Case = 10-year (2016 to 2025) median; Low Case = 2015-16 trough; High Case = 2021 l

  9. Slide 9: Where the Value Sits Across the Pricing Cases

    V-IRON PLANT SCOPING STUDY Where the Value Sits Across the Pricing Cases1 Estimated post-tax Project NPV at each pricing case: the Project remains value-accretive at the 20-year price trough, delivers approx. US$665 million NPV (Post-tax) at current spot pricing and approx. US$842 million NPV (Post-

  10. Slide 10: A Strategic Critical Metal with Irreplaceable Demand

    THE CRITICAL VALUE OF VANADIUM A Strategic Critical Metal with Irreplaceable Demand DESIGNATED CRITICAL IN THE U.S. AND EU, WITH MINE SUPPLY DOMINATED BY CHINA AND RUSSIA 1,2 rsonal use only 90% 2 41% 3 250% 4 4 of global vanadium mine U.S. net import reliance, with no projected increase in annualiz

  11. Slide 11: Structurally Deficient U.S. Supply

    THE CRITICAL VALUE OF VANADIUM Structurally Deficient U.S. Supply VANADIUM: A CRITICAL MINERAL WITH NO U.S. MINE PRODUCTION AND HIGH IMPORT DEPENDENCE rsonal use only Global vanadium mine production by country, 2025 estimates U.S. Vanadium Consumption & Domestic Production, 2025 estimate (tonnes of

  12. Slide 12: A Globally Significant Tier 1 Critical Mineral Asset

    THE MINERAL RESOURCE AND ITS LOCATION A Globally Significant Tier 1 Critical Mineral Asset A WORLD-CLASS FULLY PERMITTED VTM RESOURCE SITUATED IN A MAJOR MINING HUB Steelpoortdrift Project: Asset Highlights rsonal use only Bushveld Complex, host to major vanadium, ferrochrome, and PGE Tier 1 Locatio

  13. Slide 13: A High-Tech & Energy-Efficient Co-Production Plant

    THE V-IRON PLANT A High-Tech & Energy-Efficient Co-Production Plant1 MODERN 3-STEP FLOWSHEET PRODUCING CRITICAL RAW MATERIALS AT LOW ENERGY INTENSITY rsonal use only 1 2 3 Submerged Open-ARC Devanadation (Vanadium-slag Calcination and Pre-reduction in Fluidised Beds Smelting production) 1.00Mtpa 603

  14. Slide 14: The Co-Production Advantage

    VANADIUM-SLAG & PIG IRON CO-PRODUCTION The Co-Production Advantage A PROVEN, LOW-COST, 1 RESILIENT ROUTE TO MARKET rsonal use only ~17%² ~73%² of global vanadium is produced in South Africa, of global vanadium is produced via Brazil, the US and Europe hydrometallurgically pyrometallurgical co-produc

  15. Slide 15: Vanadium Slag Non-Binding Offtake by US-Vanadium

    STRATEGIC OFFTAKE TO THE USA Vanadium Slag Non-Binding Offtake by US-Vanadium STRENGTHENING U.S. SUPPLY CHAINS: VR8 SLAG TO U.S. VANADIUM, ARKANSAS rsonal use only U.S. VANADIUM1 STEP-CHANGE IN FEEDSTOCK QUALITY The only US World's highest- USV FEEDSTOCK TODAY integrated refinery purity V oxide 8–12

  16. Slide 16: Pig Iron for Southern African Steelmaking

    POTENTIAL LOCAL OFFTAKES FOR STEEL Pig Iron for Southern African Steelmaking LOCAL PIG-IRON OFFTAKE PATHWAYS INTO SOUTHERN AFRICAN STEELMAKING rsonal use only OFFTAKE DYNAMICS DOMESTIC PULL FOR PIG IRON VR8 in discussions with several South African steel producers for its pig iron. ~4.0Mtpa projecte

  17. Slide 17: Clear, Milestone-Driven Roadmap

    THE PATH TO PRODUCTION Clear, Milestone-Driven Roadmap1 PROGRESSIVE DE-RISKING AND VALUE BUILD ON THE PATH TO FIRST PRODUCTION rsonal use only Expansion of Owner’s Scoping study Team Complete Feasibility Construction Preliminary assessment of Isabel Geldenhuys joins to DFS & detailed technical Build

  18. Slide 18: Get in Touch

    Get in Touch rsonal use only Email & Website contact@VR8.global www.VR8.global Phone: AUS: +61 8 6158 9990 RSA: +27 83 212 6669 Twitter/X https://x.com/VanadiumResVR8 LinkedIn https://www.linkedin.com/company /vanadium-resources-limited/ Page 18

  19. Slide 19: JORC Mineral Resource Estimate

    ADDITIONAL MATERIAL JORC Mineral Resource Estimate1 JORC COMPLIANT 680 Mt MINERAL RESOURCE, WITH ~70% MEASURED & INDICATED Global Mineral Resource of 680 Mt at 0.70% V₂O₅, containing 4.74Mt of V₂O₅ rsonal use only Mineralisation outcrops at surface and dips shallowly (~10°), supporting less waste, a

  20. Slide 20: Company Structure

    ADDITIONAL MATERIAL Company Structure Vanadium Resources Limited rsonal use only Holding Company · ASX: VR8, FSE: TR3 Steelpoortdrift Community Trust 13.51% 86.49% 100% Vanadium Resources (Pty) Ltd VR8 Highveld (Pty) Ltd Mineral Resource Owner V-Iron Plant Co Mine and Concentrator Co Subject to land