  1. Slide 1: Western Massachusetts Natural Gas Reliability Project

    Western Massachusetts Natural Gas Reliability Project Longmeadow and Springfield, Massachusetts MEPA Virtual Public Consultation Session June 21st, 2022

  2. Slide 2: Project Description

    Project Description ▪ Project Scope: • Construct new Point of Delivery in Longmeadow • Install 5.3 miles of new 16-inch pipeline (Longmeadow and Springfield) • Construct upgrades to the Bliss Street Regulator Station ▪ Project Purpose: • Provide an independent supply of natural gas during peak perio

  3. Slide 3: Area of Contingency

    Area of Contingency EVERSSURCE ENERGY Site 0 - Agawam DPW Ste 1 Agawam Police Department Ste 2- Agawam Pre Department Outage Ste 3 National Guard Armory A Site 4 - Baystate Health Urgent Care rea Site 5 - Riverbend Medical Group Site 6 - Southwick DPW Site 7 - Southwick Public Works Site 8 - Southwi

  4. Slide 4: Project Alternatives Considered

    Project Alternatives Considered ▪ Pipeline Options – Alternative POD locations (including East Longmeadow) ▪ Non-Pipeline Options – No-Build Alternative – Portable LNG/CNG – Emerging Technologies and Non-Pipeline Alternatives 3

  5. Slide 5: Point of Delivery

    Point of Delivery EVERSSURCE ENERGY LANDSCAPE PLANT SCHEDULE: = SECURITY FENCE (TGP) == SCREENING FENCE (EGMA) (@QBB ADDITIONAL PLANTINGS (EGMA) TENNIS COURTS PERMIT

  6. Slide 6: Routing Analysis: Universe of Routes

    Routing Analysis Universe of Routes Routing Considerations: ▪ TGP Delivery Point ▪ Residential Areas ▪ Forest Park ▪ Interstate 91 ▪ Environmental Impacts ▪ Project Length All Routing Options Considered 5

  7. Slide 7: Routing Analysis: Proposed Project and Alternatives/Variations

    Routing Analysis Proposed Project and Alternatives/Variations ▪ Preferred Route – (solid green) – I-91 (MassDOT) – Approximately 5.4 miles – Approximately 1,000 abutters ▪ Noticed Variation 1 to Preferred Route – (solid blue) – Approximately 5.4 miles – Approximately 900 abutters ▪ Noticed Variation

  8. Slide 8: Overview of Anticipated Permits and Consultations

    Overview of Anticipated Permits and Consultations Table 6-1: Permit List Approval Type Regulatory Citation Local Local Street Opening Permits Town and City Ordinances Building Permit (for POD) Town Ordinance Forest Park Temporary Occupancy approval (for HDD staging) City Ordinance State Massachusett

  9. Slide 9: Comprehensive Outreach

    Comprehensive Outreach • State, Municipal, and Community Group Outreach • State and Municipal Officials • State Agencies • Chambers of Commerce, Economic Development Commissions • Community Groups • Advocacy Organizations • Public Presentations before Municipal Boards • Direct Outreach to Hundreds o

  10. Slide 10: Enhanced Outreach in EJ Communities

    Enhanced Outreach in EJ Communities • Multiple Community Engagement “Pop-up” events • Project maps and facts sheets available in multiple languages • In-person translation present • Language accommodations available • Spanish, Russian, Vietnamese, Korean • Continued engagement with local organizatio

  11. Slide 11: Comments and MEPA Contact Information

    Comments and MEPA Contact Information MEPA comments due on or before: July 28, 2022 MEPA Contact: Alex Strysky, (857) 408-6957, alexander.strysky@mass.gov Comments may be submitted via email to alexander.strysky@mass.gov or via the MEPA Public Comments Portal. 10