  1. Slide 1: Commercializing a Lower-Cost U.S. Critical Minerals Processing Platform

    PROJECT HEADWATERS Building a domestic, sustainable supply of critical battery materials Aqua Metals Commercializing a Lower-Cost U.S. Critical Minerals Processing Platform July 2026 Investor Presentation Headwaters ARC begins with staged LFP processing and expands through AquaRefining

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains forward-looking statements concerning Aqua Metals, Inc. Forward-looking statements include, but are not limited to, our plans, objectives, expectations and intentions and other statements that contain words such as "expects," "contemplates," "anticipates," "plan

  3. Slide 3: Investment Thesis: Why Aqua Is Investable Now

    Investment Thesis: Why Aqua Is Investable Now 1 Commercialization is beginning Proven mechanical processing creates a pathway to early revenue. 2 Lower-cost refining architecture AquaRefiningTM is designed to reduce one-time-use chemicals and waste streams. 3 A broader critical-minerals platform Hea

  4. Slide 4: The LFP Opportunity Is Moving Toward Aqua's Target Geography

    The LFP Opportunity Is Moving Toward Aqua’s Target Geography LFP is moving from niche chemistry to mainstream U.S. manufacturing and ESS/EV adoption, creating a local scrap- management problem before end-of-life volumes arrive Manufacturing scrap needs local, compliant, and economical preprocessing.

  5. Slide 5: From Headwaters ARC to a Scalable Critical Minerals Platform

    From Headwaters ARC to a Scalable Critical Minerals Platform Headwaters ARC is intended to serve as the first node in a modular LFP circular-materials network – regional preprocessing and selected 3rd party EU lanes supplying a centralized North American refining hub North America EU Midwest launch

  6. Slide 6: Phased Revenue Model: Preprocessing First, Refining Second

    Phased Revenue Model: Preprocessing First, Refining Second 1 2 Phase 1 Phase 2 Preprocessing AquaRefining integration Recover copper, aluminum and high-grade black Produce higher-value lithium carbonate, iron mass using commercially proven equipment; scale phosphate, and graphite using AquaRefining

  7. Slide 7: Headwaters Launch Campus: Staged Critical-Minerals Processing

    Headwaters Launch Campus: Staged Critical-Minerals Processing 1 2 3 4 Inbound LFP Safe discharge + Metals + black Li₂CO₃ + scrap shredding mass Graphite + FePO₄ 20,000 TPY AquaRefining Phase 1 design capacity: two higher-value product recovery from preprocessing lines of approximately the same feeds

  8. Slide 8: Commercial Equipment Strategy Reduces Phase 1 Capital and Execution Risk

    Commercial Equipment Strategy Reduces Phase 1 Capital and Execution Risk Aqua is combining commercially deployed mechanical processing with AquaRefining to accelerate commercialization and reduce initial execution risk Commercially deployed platform • Large international lithium-ion battery equipmen

  9. Slide 9: Why AquaRefining Can Lower Processing Cost

    Why AquaRefining Can Lower Processing Cost Designed to reduce one-time-use process chemicals, lower waste generation and support a safer, more efficient domestic critical- minerals processing route Illustrative hydromet comparison Lower reagent intensity Cost / process driver Conventional AquaRefini

  10. Slide 10: Technical Validation: AquaRefining Supports Headwaters

    Technical Validation: AquaRefining Supports Headwaters Innovation Center and pilot work provide the proof base for staged commercial deployment of LFP critical-minerals processing 5,000+ Battery-grade cumulative operating hours lithium carbonate produced >98% Process-flow Leach efficiency in extende

  11. Slide 11: Illustrative Project Value Drivers + Layered Financing Framework

    PROJECT VALUE DRIVERS Illustrative Project Value Drivers + Layered Financing Framework Multiple value drivers support the staged commercial model Capital can be layered as execution risk is reduced Early preprocessing revenue 1 Commercial mechanical processing creates copper, aluminum and black-mass

  12. Slide 12: Near-Term Headwaters Execution Milestones

    Near-Term Headwaters Execution Milestones NOW NEXT Execution Active workstreams Convert active workstreams Position Phase 1 for formal underway into definitive structures execution decision • Finalize equipment scope, schedule and • Complete key site engineering, permitting • Submitted state incenti

  13. Slide 13: Platform Expansion: LFP → NMC → Selected Critical Minerals

    Platform Expansion: LFP → NMC → Selected Critical Minerals Headwaters starts with LFP, but the processing platform is intended to expand into additional battery chemistries and selected mining or industrial waste streams over time Common platform architecture: mechanical preprocessing + hydromet ref

  14. Slide 14: Why Aqua Metals / Why Now

    Why Aqua Metals / Why Now Commercialization, not A staged path begins with proven mechanical processing and early revenue 1 development 2 Lower-cost processing design AquaRefining targets lower chemical consumption, reduced waste streams and safer operations Critical minerals, not only The platform

  15. Slide 15: Management