Taseko Mines Limited · TSX:TKO

Taseko Mines — Investor Presentation (November 2017)

31 slides from Taseko Mines's investor presentation, November 2017

  1. Slide 1: Quality, Diverse Group of Mining Assets

    Quality, Diverse Group of Mining Assets November 2017 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Some of the statements contained in the following material are "forward‐looking statements". All statements in this release, other than statements of historical facts, that address estimated mineral resource and reserve quantities, grades and contained metal, and possible

  3. Slide 3: NI 43-101 Compliance

    NI 43‐101 Compliance Unless stated otherwise, Taseko Mines Limited (the “Company”) has prepared the technical information in this presentation including Mineral Reserve Mineral Resource estimates (“Technical Information”) based on information contained in the technical reports and news releases (col

  4. Slide 4: Diversified Asset Base

    Diversified Asset Base Principal Operating Asset Gibraltar: Second largest open‐pit copper mine in Canada  Stake: 75% (unincorporated JV)  Commodities: copper (primary), molybdenum (by‐product) and silver (by‐ product)  688 million tons P&P reserves at a grade of 0.28% Cu Eq as of December 31, 20

  5. Slide 5: Gibraltar Copper Mine

    Gibraltar Copper Mine Canada’s Second Largest Open‐Pit Copper Mine Location: 65 km north of Williams Lake, British Columbia Ownership: 75% 3.3 billion pounds recoverable copper Mineral Reserves: 62 million pounds recoverable molybdenum Reserves Update (Dec 2016: 688mm tons at 0.28% copper equivalent

  6. Slide 6: Gibraltar Copper Mine

    Gibraltar Copper Mine GDP3 Expansion – New 30k tpd Concentrator (commissioned in 2013) 34’ SAG Mill 20’ Ball Mill 160m3 Float Circuit Gibraltar Production (100%, Mlbs Cu) • Operating at steady-state 180 after six years of expansion 150 activities 120 • Modernized mine stabilized 90 at reduced operat

  7. Slide 7: Operating Costs

    Operating Costs Focussed on Lower Cost per Ton Milled • Cost per ton milled sustained at low levels for past two years due to cost saving initiatives, including revised mine plan with lower strip ratio • Comparable open pit mines in South America at $15-20 per ton milled Cost Per Ton Milled (C$) $15

  8. Slide 8: Cost Benefits

    Cost Benefits BC Advantage • Low cost power - $0.06/kWh vs. $0.15-$0.20 elsewhere • Established infrastructure in a favorable jurisdiction – highway access, rail, port, grid power (existing infrastructure funded by government) • Skilled and efficient labor force – similar sized South American mine e

  9. Slide 9: Recent Results

    Recent Results Performance Over Last Four Quarters • Strong production performance and copper price recovery has resulted in excellent recent quarterly results • Expect performance to continue throughout 2017 Copper Production – MM lbs Total Operating Costs (C1) – US$/lb Cost/ton Milled – C$ 50 $2.0

  10. Slide 10: Operating Margin Sensitivity

    Operating Margin Sensitivity Highly levered to copper price recovery and further cost reductions C1 Costs (US$/lb) Operating Margin (C$, millions) $1.80 $1.70 $1.60 $1.50 $1.40 $1.30 $2.50 $92 $105 $118 $131 $144 $158 Cu Price (US$/lb) $2.75 $125 $138 $151 $164 $177 $190 $3.00* $158 $171 $184 $197 $

  11. Slide 11: Impact of Copper Price

    Impact of Copper Price Equity levered to copper price Dec ‐ 2010 Dec ‐ 2014 Current ↓19% US$ Copper Price $3.95 $3.10 $3.20 ↑2.5% C$ Copper Price $3.95 $3.45 $4.05 LTM Production (Mlbs) 82 140 155 ↑89% Share Price $4.67 $1.34 $2.75 ↓41% Market Cap $870 $265 $630 ↓28% 11

  12. Slide 12: Debt Refinancing

    Debt Refinancing In June, Taseko Closed a 5‐Year High Yield Financing Offering Details: Issuer Taseko Mines Limited Issue US$250 million Senior Secured Notes Coupon 8.75% Term 5 years, due June 2022 Ratings B3 (stable) / B- (stable) – corporate and issue Security Secured by first priority lien on Ta

  13. Slide 13: Florence Copper

    Florence Copper A Near Term, Low Cost Copper Producer Location: Central Arizona near the community of Florence Ownership: 100% (acquired in 2014 for US$70 million) 345 million tons grading 0.36% TCu (at a 0.05% total Mineral copper cutoff) containing 1.7 billion pounds of recoverable Reserves: coppe

  14. Slide 14: Florence Copper 2017 Technical Study

    Florence Copper 2017 Technical Study • In January 2017, Taseko announced the results of a two-year metallurgical test program as well as an optimization of the project well field development sequence • The updated data was used to re-cost the project which resulted in a significant improvement in pr

  15. Slide 15: In-Situ Copper Recovery (ISCR)

    In‐Situ Copper Recovery (ISCR) How does in‐situ copper recovery work? Injection and recovery wells are drilled deep into the bedrock where the oxide copper ore is Wells are concrete encased and sealed to protect water quality Highly diluted acid (99.5% water, 0.5% acid) is pumped under low pressure

  16. Slide 16: Florence Copper Project

    Florence Copper Project PTF development Details • In September 2017, Taseko’s Board of Directors approved construction of the Phase 1 Production Test Facility (PTF) • Operation of the PTF is intended to prove the ability to control the movement of fluid within the oxidized zone and also will provide

  17. Slide 17: Copper Fundamentals: Constrained Supply

    Copper Fundamentals Constrained Supply Constrained Supply Deterioration of the quality of deposits Lower grades, increased rock hardness, impurities and depth Constrained supply leading to: Productivity Labour and capital constraints • Market deficit possibly earlier than expected Availability of wa

  18. Slide 18: Copper Fundamentals: Constrained Supply

    Copper Fundamentals Constrained Supply 18

  19. Slide 19: Copper Fundamentals: R,D&D – Improving Technology

    Copper Fundamentals R,D&D – Improving Technology Research, development and deployment (RD&D) and mass production prospects are leading to rapid battery cost declines and increases in energy density. Signs of continuous improvements from technologies currently being researched confirm that this trend

  20. Slide 20: Copper Fundamentals

    Copper Fundamentals EV push could lead to copper shortage, mining group says Clara Ferreira-Marques and Gavin Maguire – Reuters / September 26, 2017 @ 7:00 am SINGAPORE -- The push toward electric cars could lead to shortages in raw materials such as copper, mining group BHP said. The EV boom would

  21. Slide 21: Copper Fundamentals

    Copper Fundamentals Mercedes‐Benz plans to invest $1 billion in Alabama to produce EV Mercedes-Benz makes a $1B bet it can take down Tesla / Nathan Bomey, USA TODAY Published Sept. 21, 2017 Showing its seriousness about an electric future, Mercedes-Benz plans to invest $1 billion in Alabama to produ

  22. Slide 22: Copper Fundamentals: Demand for Copper

    Copper Fundamentals Demand for Copper (refined basis) 26 24 Metric Tonnes (millions) 22 20 18 16 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Base Case Mines Demand for mine production capability (refined metal) • After 5 years of substantial capacity additions (2011-2015), a lack of inves

  23. Slide 23: Aley Project – Niobium

    Aley Project – Niobium Accretive Development Opportunity Location: Northern British Columbia Ownership: 100% Mine Type: Open Pit Mine Life: +24 years 2014 Technical Report – Project Highlights • Proven and probable reserves of 84 million tonnes grading 0.50% Nb2O5 announced in September 2014 • Pre-t

  24. Slide 24: Thank You

    Thank You

  25. Slide 25: Corporate Information

    Corporate Information Cash on Hand (9/30/17): C$96 million LT Debt (9/30/17) : C$300 million Listed: TSX; TKO / NYSE American; TGB Shares Outstanding: 226.6 million Market ~C$650 million Capitalization: 52 Week High/Low: C$2.96/C$0.56; US$2.46/US$0.42 Analyst Coverage: BMO, Scotia Capital, National

  26. Slide 26: Copper Fundamentals: Constrained Supply

    Copper Fundamentals Constrained Supply Source: Scotia Capital Markets, Wood MacKenzie 26

  27. Slide 27: New Prosperity Project

    New Prosperity Project One of the Largest Gold/Copper Porphyries in the World Location: 125 km south west of Williams Lake, British Columbia Ownership: 100% 7.7 million ounces recoverable gold Mineral Reserves: 3.6 billion pounds recoverable copper Mine Type: Open-pit, 70,000 tpd mill throughput Min

  28. Slide 28: Aley Niobium Project

    Aley Niobium Project What is Niobium Niobium Benefits in Steel $9 of Niobium used in a Car • Specifically used in manufacturing high strength, low alloy steels • Green technologies, turbines, aerospace, automobile steels, oil and gas = 100 kg Weight • Global annual consumption of ferro-niobium is 21

  29. Slide 29: Experienced Management Team

    Experienced Management Team Russell Hallbauer, P. Eng - President & CEO and Director – Mr. Hallbauer is a professional engineer with over 35 years of mining experience. He has a strong background in open pit and underground mining, overseeing operating joint ventures and revitalizing mines to profit

  30. Slide 30: Reserves & Resources

    Reserves & Resources Size Grade Recoverable Metal Contained Metal Gibraltar Category (at 0.15% Cu (M Tons) The resource and reserve estimation was completed by cut-off) Cu (%) Mo (%) Cu (B lbs) Cu (B lbs) Gibraltar mine staff under the supervision of Scott Jones, P.Eng., Vice President, Engineering

  31. Slide 31: Reserves & Resources

    Reserves & Resources Aley Category Grade Recoverable Metal Contained Metal The reserve estimation (effective date Sept 15 2014) was Size (M reviewed by Scott Jones, P.Eng., Vice-President Tonnes) Nb205 (%) Nb (M kg) Nb (M kg) Engineering for Taseko and a Qualified Person under National Instrument 43

Taseko Mines — Investor Presentation (November 2017) on 6ix