Mondi Plc · LSE:MNDI
Mondi — Corporate Update (October 2008)
14 slides from Mondi's corporate update, Oct 8, 2008
Slide 1: Investor Site Visit - 07/08 October 2008
Investor Site Visit - 07/08 October 2008 Clinton van Vught Operations Manager: Merebank
Slide 2: Merebank Mill
MEREBANK MILL Page 2
Slide 3: Merebank Operations
MEREBANK OPERATIONS A. Number of employees 606 B. Production Capacities: 1. Stock preparation 500 000 tons 2. Paper Machine – 31 280 000 tons 3. 32 120 000 tons 4. 33 160 000 tons 5. Cut Size 450 000 tons 6. Folio 30 000 tons Page 3
Slide 4: Safety Development
Number of LTI's 0 2 4 6 8 10 12 2007 JANUARY FEBRUARY MARCH APRIL MAY SAFETY DEVELOPMENT JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER Page 4
Slide 5: Pulping and Refining
PULPING AND REFINING Pulping of the fibres Bales of pulp Refining CSF Consistency Fibre morphology Page 5
Slide 6: Additives
ADDITIVES ASA Particle distribution PCC Temperature Retention Aids pH Solids Viscosity Solids Conductivity Additives into the Furnish Internal Starch Temperature Shade – FWA & Dyes Solids Solids Viscosity pH Size Press FWA Sodium Chloride – Solids Surface Starch – Solids, viscosity, pH, temp. & dens
Slide 7: Paper Machine Process
PAPER MACHINE PROCESS Wetend monitoring Dryend monitoring Paper testing Retentions Cylinder temperatures Physical properties of paper Drainage time On-line scanners, slabs Curl Ex-Press moistures Formation Wetend surveys Creases, piping, ridges Winder A4 Cut size Correct core & plugs Size Cutting qu
Slide 8: Paper Testing
PAPER TESTING L & w Autoline 300 Profiler Physical properties Optical properties Sheet dimensional properties Techpap Formation Curl evaluation – Docutech 6135, Canon and HP Page 8
Slide 9: Finishing – Cut Size
FINISHING – CUT SIZE Will Cutter Chop & Slit cutting quality, dust Size deviation Jogging of ream Folded corners Creases, piping, dirt Ream paper count Set curl & copying curl Excellent Quality Palletising Boxing Product to the Correct labels Neatness of box Customer ! Neatness of stack Strap tightn
Slide 10: 2005 PM31 Upgrade
2005 PM31 UPGRADE Before Rebuild: Grade: SC and NP Capacity: 110 000 tons Manning: 56 After Rebuild: Grade UWF Manning: 32 Capacity: 280 000 tons Benefits: Reduced energy consumption Reduced water consumption Lower manning World class copy quality Page 10
Slide 11: Environmental Performance: Purchased Electricity Consumption
ENVIRONMENTAL PERFORMANCE Purchased Electricity Consumption 1.6 1.4 1.2 1 MWh/t 0.8 0.6 0.4 0.2 0 2004 2005 2006 2007 2008 ytd Page 11
Slide 12: Environmental Performance: Specific Effluent Generation
ENVIRONMENTAL PERFORMANCE Mondi Specific Effluent Generation 25 20 15 M3/t 10 5 0 YTD 2004 2005 2006 2007 2008 Page 12
Slide 13: Environmental Performance: Sulphur Dioxide Emission
ENVIRONMENTAL PERFORMANCE Sulphur Dioxide Emission tons/day 14 12 10 8 6 4 2 0 2003 2004 2005 2006 2007 2008 ytd Sulphur Dioxide Permit Limit Target Page 13
Slide 14: © mondi