Invinity Energy Systems Plc · LSE:IES

Invinity Energy Systems — Shareholder Meeting (October 2021)

9 slides from Invinity Energy Systems's shareholder meeting presentation, Oct 27, 2021

  1. Slide 1: Annual General Meeting

    ANNUAL GENERAL MEETING October 27, 2021

  2. Slide 2: Energy storage has always been critical to generating electricity

    Energy storage has always The global move toward been critical to generating primary energy sources electricity. introduces intermittency. Energy storage at a coal power plant in North Carolina Pre-production storage Post-production storage enables power plants to be enables renewable energy to what

  3. Slide 3: Market Size Projections

    Market Size Projections Analysts & researchers forecast immense growth… ….aligned with political will. California: “Governor proposes US$350m support for long-duration energy storage” BNEF UK: “Government’s US$100m long-duration energy storage funding competition underway.” IEA EU (IEA): “[Market de

  4. Slide 4: Lithium Ion vs Vanadium Flow

    Lithium Ion Vanadium Flow Prone to catching on fire – difficult to No fire risk – electrolyte is mild, water- Safe put out. based, battery acid. Degrades with use – five to seven years Unlimited cycles – over 20 years of Long life of daily cycling. continuous operation. Lower upfront capital cost, b

  5. Slide 5: Cycles per year by duration of storage

    Urban Decarbonization 800 700 Tidal Dispatch Operating Reserves (FFR) Wind and Tidal Dispatch 600 CYCLES PER YEAR 500 Solar Dispatch 400 Solar Dispatch 300 Resilience Overnight Renewables 200 100 Peaker Replacement Low-production infilling Resilience 0 1 2 3 4 5 6 7 8 9 10 11 12 Days Weeks Seasons D

  6. Slide 6: ESO – Cluster 2

    Cluster 2 ESO INVINITY MERGY SYSTEMS

  7. Slide 7: Scottish Water

    Sen 3) ~ = <= fn ~ ~ Oo Oo WY)

  8. Slide 8: Superior levelized cost of storage and no degradation

    Superior levelized cost of storage No degradation from heavy cycling (LCOS) 25 year lifetime Non-flammable Optimized for requirements of 3 to No risk of thermal runaway 10 hours No conflict minerals Standardized product drives price All components easily recyclable down & quality up 7

  9. Slide 9: AGM

    IN INITY

Invinity Energy Systems — Shareholder Meeting (October 2021) on 6ix