Slide 1: NGPL Customer Meeting
NGPL Customer Meeting April 16, 2024 1

Slide 2: Agenda
Agenda ■ Welcome ■ Legal Cautionary Statement ■ Regulatory Update ■ Pipeline Operations Update ■ Fundamentals Update ■ Business Development Update ■ Afternoon/Evening Schedule ■ Closing Remarks 2

Slide 3: Legal Cautionary Statement
Legal Cautionary Statement Maria Pavlou Vice President - Legal

Slide 4: Legal Cautionary Statement
Legal Cautionary Statement Please keep in mind that sharing your company’s forecasts, predictions, pricing plans, production plans or purchasing plans with competitors is illegal. Please do not discuss current or future prices, price trends, production, demand or other sensitive information with per

Slide 5: Regulatory Update
Regulatory Update Maria Pavlou, Vice President - Legal Rahul Singh, Director - Regulatory Affairs

Slide 6: FERC Composition Update
Regulatory Updates FERC Composition Update Chairman Commissioner Nominee: David Nominee: Lindsay Nominee: Judy Phillips Christie Rosner See Chang Term Ends: 6/26 Term Ends: 6/25 Term End: 06/2027 Term End: 06/2028 Term End: 06/2029 ◼ Commissioner Clements term ends 6/2024. Three commissioners needed

Slide 7: Texas-Louisiana Section 7(c) Expansion Project (Docket No. CP24-8)
Texas-Louisiana Section 7(c) Expansion Project (Docket No. CP24-8) Overview: • Designed to transport incremental quantities from TexOk (Haynesville) and South Texas (Permian and Eagle Ford) to growing LNG markets on Natural’s Louisiana Line • Project is fully subscribed up to 467,000 Dth/day utilizi

Slide 8: Good Neighbor Plan
Good Neighbor Plan ◼ Environmental Protection Agency (EPA) rule effective August 4, 2023 ◼ Aimed at reducing nitrogen oxide pollution from power plants and other industrial facilities in 23 states ◼ Also includes natural gas pipeline compressor engines >1000 horsepower ◼ The rule requires compliance

Slide 9: Notice of Inquiry Regarding Allocation of Interstate Pipeline Capacity
Notice of Inquiry Regarding Allocation of Interstate Pipeline Capacity ◼ On March 21, 2024, FERC issued a Notice of Inquiry (NOI) in response to the Petition in Docket No. RM22-17-000 ◼ NOI establishes a comment procedure ▪ Initial Comments are due June 27, 2024 ▪ Reply Comments are due on July 29,

Slide 10: Pipeline Operations Review
Pipeline Operations Review Ganesh Venkateshan Director – NGPL Gas Control

Slide 11: Pipeline Operations Review
Pipeline Operations Review ▪ Winter 2023-24 Recap ▪ Weather ▪ System Deliveries ▪ Storage Update ▪ Summer 2024 Challenge 11

Slide 12: Winter 2023-24 Recap
Winter 2023-24 Recap ■ 2023/2024 winter operations were very steady, weather was in general mild with the brief but intense weather during mid January with no significant operational issues or scheduling interruptions ■ During periods of extended colder than normal weather, the system functioned as

Slide 13: Winter Weather 2023-24
Winter Weather 2023-24 Normals are based of 30 year averages. Chart is displaying 10 day moving average to smooth out Normal curve. 13

Slide 14: Winter System Deliveries
Winter System Deliveries Year to Date Summary Winter over Winter Summary 2024 2023 23/24 22/23 % Change % Change Jan – Mar Jan – Mar Nov – Mar Nov – Mar LDC 2,464 2,816 -13% LDC 2,513 2,875 -13% LNG 1,639 1,466 12% LNG 1,670 1,417 18% Interconnects 1,080 958 13% Interconnects 1,080 986 10% Power 630

Slide 15: NGPL Gas Storage Inventory Update
NGPL Gas Storage Inventory Update ■ 2023-24 Winter Season Lookback ■ Strong market and field reservoir performance throughout season ■ High peak deliverability capability available throughout season ■ 2024 Summer Preview ■ Market-area fields projected to achieve target inventory levels ■ North Lansi

Slide 16: Summer 2024 Challenge
Summer 2024 Challenge ■ Weatherwise was another mild winter leading to higher storage inventory as we finish winter ■ Focus on storage injections and reservoir maintenance ■ Meet October 31st Storage Inventory Targets ■ Active maintenance season ■ Outages posted on EBB (updated weekly) ■ Challenge:

Slide 17: Fundamentals Outlook
Fundamentals Outlook Tom Mikucki Director – Market Services Proprietary Information

Slide 18: Summary of Key Messages & Trends
Summary of Key Messages & Trends Change % Natural gas demand is forecasted to rise between 2024 and 2029 to 128.2 Bcf/d, led by LNG 2029 (2024-2029) Change and Mexico exports growth along with moderate growth in the residential and commercial sectors. L48 Supply +19.8 122.6 +19% — LNG nameplate capa

Slide 19: Natural Gas Macro Comparisons
Natural Gas Macro Comparisons LNG feedgas contributes to near Slower LNG export growth Supply declines from its term increases, but some delays in 2024-2025 moderates early 2024 high due to occur due to the Non-FTA pause. prices and supply levels off oversupply and low price Mexico exports increase

Slide 20: EIA DUC Well Trends
EIA DUC Well Trends Region Dec Feb Chg 2023 2024 MC 702 701 -1 DUCs began to decline Appl 783 805 22 in mid-2020; driven Bakken 317 325 8 mainly by Permian EF 350 349 -1 HV 748 764 16 Of the total DUCs Rox 686 656 -30 shown, about 50% are Perm 891 883 -8 DUCs that will never be completed due to age

Slide 21: Key Trends
Key Trends Permian & NE & Haynesville LNG Exports U.S. Power Gen Demand 120 40 45 35 40 100 30 35 80 30 25 Bcfd 25 Bcfd Bcfd 60 20 40 Eagle Ford +1.7 Bcfd 15 U.S. +18.9 Bcfd 20 +0.1 Bcfd 15 10 20 NE +4.9 Bcfd 5 10 Can. & Mex. +5.6 Bcfd 5 0 0 0 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2

Slide 22: Gas Demand
Gas Demand Including Exports North American Demand 152.9 U.S. Exports to Mexico 10.8 Ind + Power: +0.8 Plant: +0.4 Power: +0.3 Mexico LNG Exports -3.2 Res/Comm: -0.1 Comm: -0.3 Mexico Demand -10.0 Canada Demand -15.1 Canada LNG Exports -2.5 Res/Comm/Ind: +0.2 Power: -0.2 U.S. Demand (2033) 132.9 Pow

Slide 23: Long-Term Macro Projections
Long-Term Macro Projections Haynesville grows significantly, but a near term pause due to low prices will be followed by acceleration for LNG exports. Permian, Northeast, and Eagle Ford also indicate strong growth across the forecast. LNG Exports grow significantly while exports to Mexico are anothe

Slide 24: Additional Electric Growth Demand Drivers
Additional Electric Growth Demand Drivers — Data Centers and Blue Hydrogen Data Centers Blue Hydrogen/Ammonia By 2030, BCG expects energy use to grow from 126 TWh to 335 TWh, or ~3.4 Bcfd to ~9.2 Bcfd Demand grows from 0.1 Bcfd in 2024 to 1.9 Bcfd in 2033 >60% of Data Centers expected in MISO, CAISO

Slide 25: Current Landscape: NGPL Supply
Current Landscape NGPL Supply — Recent supply receipts at similar level to last year – Continued high utilization of NGPL, despite warm winter and recent reduced producer activity – Current South Texas benefiting from increased receipts from Whistler – Higher Rockies receipts with milder winter weat

Slide 26: Current Landscape: Deliveries to Direct Connect Power Plants
Current Landscape Deliveries to Direct Connect Power Plants — Recent deliveries to Market Area power plants have been higher YOY, primarily due to the start up of a new plant earlier this year and lower gas prices YOY — Recent higher market share for gas generation in MISO, SPP and PJM 26

Slide 27: Average Daily Deliveries by Zone
Average Daily Deliveries by Zone — FY 2023 higher vs FY 2022 — TXOK increase primarily at Moss Bluff (3rd party storage) — South Texas increase primarily at Gulf South Coastal Bend Header ~100 MDth/d (LNG) and Tres Palacios (3rd party storage) — Permian increase primarily at Agua Blanca and Trans Pe

Slide 28: Business Development
Business Development Lindsey Fritz, Manager

Slide 29: Permian North
Permian North Project Scope: ▪ Leverages NGPL’s Permian footprint to provide takeaway to liquid Midcontinent Pool and/or Chicago market area ▪ Compression Project Description: Receipts: Permian Receipt Zone, Lockridge Lateral Perm Deliveries: Chicago Markets & Segment 6 (Midcontinent Pool) North Pro

Slide 30: Delaware Basin North
Delaware Basin North Project Scope: ▪ Leverages NGPL’s Permian footprint to provide takeaway to liquid Midcontinent Pool, Chicago Markets and/or East Texas ▪ Compression Project Description: Receipts: Permian Receipt Zone, Lockridge Lateral Deliveries: Chicago Markets, Midcontinent Pool, & East Texa

Slide 31: Texas – Louisiana Moving Forward
Texas – Louisiana Moving Forward Project Scope: ▪ Leverages NGPL’s Gulf Coast footprint to provide expanded access to LNG corridor ▪ Provides access to TexOk and/or Midwest supply ▪ Provides access to South Texas supply, Wharton and Katy Hub receipts ▪ Compression Project Description: Receipts: Iowa

Slide 32: Gulf Coast Storage Expansion
Gulf Coast Storage Expansion Project Scope: ▪ Compression + storage lateral looping to facilitate additional NSS capacity Description: Receipts: Iowa-Illinois, Gulf Coast Mainline or Texok (Segment 26), South Texas, and Louisiana Receipt Zones Delivery: Louisiana Delivery Zone Capacity: 10 Bcf In-Se

Slide 33: Torito Dorado Project
Torito Dorado Project Project Scope: ▪ Incremental compression to move in-basin supply to Waha hub or Texas crosshaul pipes Description: Receipts: Segment 9 Delivery: Waha (Transpecos / Agua Blanca) Capacity: 125,000 Dth/d In-Service: Targeting 1H 2026 Commercial Status/Next Steps: ▪ Marketing ▪ Reg

Slide 34: What’s Next?
What’s Next? WISCONSIN ILLINOIS 39 116 Horizon ▪ Gulf Coast LNG Driven Growth 30 Chicago 40 30 32 33 113 32 36 ▪ Power Demand 110 14 14 33 202 28 201 34 Herscher Storage ▪ Natural Gas Production Growth ▪ System Optimization & Storage 16 ▪ Contact Information: 7 Lindsey Fritz Office: 713-420-2626 Cel

Slide 35: NGPL Customer Meeting
NGPL Customer Meeting April 16, 2024 35
Source: Internet Archive copy of pipeline2.kindermorgan.com
More decks from Kinder Morgan, Inc.
Q4 2025 Earnings Presentation38 slides · Jan 21, 2026
Investor Presentation (January 2026)64 slides · January 2026
Investor Presentation (December 2025)24 slides · Dec 3, 2025
Q3 2025 Earnings Presentation36 slides · Oct 6, 2025
Corporate Update (September 2025)22 slides · Sep 17, 2025
Q2 2025 Earnings Presentation36 slides · Jul 16, 2025