  1. Slide 1: LDC Roundtable - Northeast Operations & Winter Preparedness

    9/17/2025 LDC Roundtable - Northeast Operations & Winter Preparedness September 17, 2025 1 Agenda Presenters • Welcome & Meeting Objectives Ron Miller • Safety Share Director, Operations- Division 10 • Introductions (All Participants) Greg Bare Manager, Technical Services – Northern Division 10 • Sa

  2. Slide 2: Safety Share: Normalization of Deviance

    9/17/2025 Safety Share Evacuation Briefing 3 Normalization of Deviance Safety Share “The gradual process through which unacceptable practices or standards become treated as acceptable. As the deviant behavior is repeated without catastrophic results, it becomes the social norm for the organization”

  3. Slide 3: Safety at Kinder Morgan

    9/17/2025 Safety at Kinder Morgan 5 Safety Culture at Kinder Morgan Division 10 Geographical Area 6 3

  4. Slide 4: Safety Culture at Kinder Morgan

    9/17/2025 Safety Culture at Kinder Morgan Maintaining a Safe Work Culture Our culture is centered around our values of safety, integrity, accountability and excellence. We are committed to fostering a workplace where every individual is empowered to work safely and we provide them with the tools to

  5. Slide 5: Protecting Our Pipe: Public Awareness and Damage Prevention

    9/17/2025 Protecting Our Pipe Public Awareness and Damage Prevention 9 Protecting Our Pipe Public Awareness & Damage Prevention One of the greatest operational risks to our pipelines is line strikes by third parties. To combat this risk we have a robust Public Awareness and Damage Prevention Program

  6. Slide 6: Protecting Our Pipe: Flyscan Partnership and Damage Prevention Statistics

    9/17/2025 Protecting Our Pipe Public Awareness & Damage Prevention In January 2025, Kinder Morgan and Flyscan Systems announced a strategic partnership to better enhance aerial patrols along the pipeline right-of-way. Flyscan technologies are state-of-the-art for pipeline leak detection and right-of

  7. Slide 7: Winter 2024-2025 Look Back

    9/17/2025 Winter 2024-2025 Look Back 13 TGP Winter Review 14 14 7

  8. Slide 8: TGP Winter Restrictions

    9/17/2025 TGP WINTER 2024/2025 Segment Constraints for Timely Cycle (November – March) 15 15 TGP Winter Restrictions Percent Days Restricted for Timely Cycle (November – March) 16 16 8

  9. Slide 9: Summer Review – April through July

    9/17/2025 Summer Review – April through July 17 TGP Summer Review 18 18 9

  10. Slide 10: TGP Summer Restrictions

    9/17/2025 TGP Summer 2025 Segment Constraints for Timely Cycle (April – July) 19 19 TGP Summer Restrictions Percentage Days for Timely Cycle (April – July) 20 20 10

  11. Slide 11: Looking Ahead: Pipeline Outages and Planning

    9/17/2025 Looking Ahead…. • Continued high utilization system wide • No major outages or system issues anticipated going into the Winter • Storage inventory moving toward an average level by the end of injection season • Continued focus on maintenance to remain safe, reliable and compliant while als

  12. Slide 12: Winter Preparedness: Winter Readiness - Operations

    9/17/2025 Winter Preparedness 23 Winter Readiness - Operations • Scheduled Maintenance − All Routine Compressor station maintenance shall be completed by early November: • Station/Unit Protective Devices • Compressor maintenance • Borescope Inspections • Test Run Units − All Routine pipeline and met

  13. Slide 13: Improvement and Maintenance Activities 2025-2026

    9/17/2025 Winter Readiness - Operations • Gas Control Preparation • Daily coordination calls with Gas Control and System Planning • TGP Gas Control to LDC Gas Control meetings as necessary. • Pre-winter preparation meetings with operational support groups. • Extreme Weather/Event Readiness • Northea

  14. Slide 14: ILI Runs & Discoveries; 2025-2026 Improvement Examples

    9/17/2025 ILI Runs & Discoveries EMAT Tool Usage & Excavation Summary This Table Summarizes EMAT tool activity and related excavation efforts Completed Anomaly Start Date End Date Total EMAT Runs Planned Excavation Digs 8/1/2024 8/31/2025 82 92 - 9/1/2025 9/30/2029 85 - 131 Source: Rosen Group 27 20

  15. Slide 15: 2025-2026 Improvement Examples; Zone 6 Planned Outages

    9/17/2025 2025-2026 Improvement Examples • Meter Tube Cleaning & Inspection – Across Division • 34 Meter Tube Cleaning and/or Inspections • Mainline Valve Enhancements – Across Division • Installation of RMV Functionality on select MLVs • Implementation of SOLAR Insight Program • Realtime Reliabilit

  16. Slide 16: Zone 5 and Zone 4 Highlighted Planned Outages

    9/17/2025 Zone 5 (Highlighted Planned Outages) MLV 236-1 to MLV 237-1BR: Special Permit Replacement (9/29/2025-10/10/2025) Arlington Storage Shut-in Tests (10/13/2025 – 10/17/2025) (11/3/2025 – 11/7/2025) (11/17/2025-11/21/2025) 31 Zone 4 (Highlighted Planned Outages) MLV 317-1 to MLV 318-1: Hot Tap

  17. Slide 17: Customer Initiated Improvements at Meter Stations

    9/17/2025 Customer Improvement Initiative Customer Initiated Improvements at Meter Stations 33 Customer Initiated Improvements at Interconnects Customer Improvement Initiative Kinder Morgan is committed to meeting the needs of our customers while ensuring our commitment to safety and operational exc

  18. Slide 18: Customer Initiated Improvements at Interconnects: Objectives

    9/17/2025 Kinder Morgan Customer Interconnects 35 Customer Initiated Improvements at Interconnects Customer Improvement Initiative Objectives Of Initiative 1. Provide Transparency of Customer Improvements at Interconnect Locations. 2. Ensure appropriate Communication between all parties. 3. Ensure n

  19. Slide 19: Outage Planning and Customer Communication

    9/17/2025 Outage Planning and Customer Communication 37 TGP – System Notifications 38 38 19

  20. Slide 20: Gas Control Update and Wrap-Up

    9/17/2025 TGP – Outage Impact Report 39 39 Gas Control Update and Wrap-Up 40 20

  21. Slide 21: Gas Control Update

    9/17/2025 Gas Control Organizational Structure 41 Gas Control Update  TGP Performed well Winter/Summer 2025  Pipeline maintenance activities created many challenges, but overall system performed well  Increase system utilization especially with LNG facilities  Managing new flow patterns and incr

  22. Slide 22: Thank You