  1. Slide 1: Clean TeQ Sunrise CCC meeting

    Clean TeQ Sunrise CCC meeting 15 February 2018

  2. Slide 2: Agenda

    AGENDA • General update • Modification 4 • Overview / update • Transport assessment • Clean TeQ’s submission • Modification 6 • Working with and investing in our community • Air quality • Q&A C l e a n Te Q S u n r i s e PA G E 4

  3. Slide 3: Since the CCC last met, we have:

    SINCE THE CCC LAST MET, WE HAVE: • Placed Modification 4 on public exhibition (closed 13 December) • Approval of Modification 5 • Placed Modification 6 on public exhibition (closed 7 February) • Completed an independent pedestrian safety review - Trundle • Transported two autoclaves to Port Pirie •

  4. Slide 4: Modification 4 (MOD4)

    d CLEAN 7 5 Ni Sc Nickel ‘ol Scandium 58.693 ¢ 4 44.9: Powering innovation Modification 4 (MOD4)

  5. Slide 5: MOD 4 Overview

    MOD 4 OVERVIEW MOD 4 details the proposed changes: There are NO changes to: • Addition of a water treatment plant • Approved surface development area • Mine Site – Modified Layout • Life of mine • Tailings Storage Facility (increased • Mining method and rate extent and height) • Open cut pits • Evap

  6. Slide 6: MOD 4 Overview

    MOD 4 OVERVIEW CLEAN TEQ SUNRISE PA G E 8

  7. Slide 7: MOD 4 Environmental Assessment

    MOD 4 ENVIRONMENTAL ASSESSMENT Environmental Assessment includes the following specialist assessments: • Noise and Blasting Assessment • Air Quality Assessment • Preliminary Hazard Analysis • Road Transport Assessment • Water Management Assessment • Aboriginal Cultural Heritage Assessment • Biodiver

  8. Slide 8: MOD 4: What We Propose

    MOD 4: WHAT WE PROPOSE Transport – Use and Increases • Increased sulphur demand • External limestone supply • Ammonium sulphate product • Proposed limited heavy vehicle use of the McGrane Way • Short-term road transport of water (during construction phase) Limestone Quarry, Rail Siding and Gas Pipel

  9. Slide 9: Modification 4: Submissions Received

    MODIFICATION 4: SUBMISSIONS RECEIVED Concern raised – Project Traffic in Trundle • We completed an independent Pedestrian Access Review while MOD4 was on public exhibition • The Review concluded that: …it is considered unlikely that a significant deterioration in the safety of that environment would

  10. Slide 10: 1. Modification 4

    1. MODIFICATION 4 Clean TeQ PA G E 12

  11. Slide 11: Modification 4: Submissions Received

    MODIFICATION 4: SUBMISSIONS RECEIVED • Concern raised – Project Traffic in Trundle In addition to the Pedestrian Safety Assessment Review, we: • Prepared a supplementary Road Noise Assessment (Renzo Tonin & Associates) concluded that the MOD 4 would not lead to any exceedances of the relevant road n

  12. Slide 12: We Have Reduced Our Traffic Numbers

    WE HAVE REDUCED OUR TRAFFIC NUMBERS Our proposed traffic movements through Trundle will be 20% below the approved Project As promised, we have committed to a number of initiatives: • Running employee shuttle buses from Condobolin, Parkes and Forbes • We have obtained heavy vehicle authorisation perm

  13. Slide 13: Modification 6 (MOD6) Accommodation Camp

    Modification 6 (MOD6) Accommodation Camp

  14. Slide 14: Modification 6 Status Update

    MODIFICATION 6 Status Update • EA lodged in December 2017 and public exhibition ended on 7 February 2018 • Draft Responses to Submissions Report to be prepared by 5 March 2018 Clean TeQ PA G E 16

  15. Slide 15: Working with our community

    CLEAN oe Ni Sc Nickel “0 Scandium 58.693 44.951 Powering innovation Working with our community

  16. Slide 16: Community Engagement

    COMMUNITY ENGAGEMENT 1. Hold community drop-in sessions in Trundle and Fifield on Monday and Tuesday, 26 and 27 February respectively (to be advertised) 2. Meet with ‘near neighbours’ in Fifield in the coming weeks 3. Publish and distribute the second edition of our community newsletter (print and e

  17. Slide 17: Investing in Our Community

    INVESTING IN OUR COMMUNITY Voluntary Planning Agreement • ‘In-principle’ agreement for Voluntary Planning Agreement with Forbes, Lachlan and Parkes Shire Councils for our Voluntary Planning Agreement • $400,000 per annum community contribution (50 % Lachlan Shire Council, 25% Forbes Shire Council an

  18. Slide 18: Our Values – What's Important to Us

    OUR VALUES – WHAT’S IMPORTANT TO US C l e a n Te Q S u n r i s e PA G E 20

  19. Slide 19: Air quality & emissions

    Air quality & emissions Ramboll Environment Stephen Grocott

  20. Slide 20: Air Emissions – Sulfur Dioxide

    AIR EMISSIONS – SULFUR DIOXIDE • Sulfur (by-product from natural gas production and oil refining) • Imported sulfur is burnt in an acid plant to make sulfur dioxide (SO2). • 99.7 – 99.9% of the SO2 is captured and oxidised to make sulfuric acid (H2SO4), electricity and steam • 0.1 – 0.3% of sulfur i

  21. Slide 21: Processing Plant

    Processing Plant Clean TeQ PA G E 23

  22. Slide 22: Sulfur Dioxide

    SULFUR DIOXIDE 1. High concentrations, for long periods of time, can affect health 2. Maximum acceptable air concentrations are often determined after applying a safety factor to the maximum concentration that doesn’t affect an “exercising asthmatic” *What is ppmv? 3. World-wide health authorities s

  23. Slide 23: Modification 4 Air Quality Assessment

    CLEAN TEQ SUNRISE PROJECT MODIFICATION 4 AIR QUALITY ASSESSMENT CLEAN TEQ SUNRISE PROJECT 15/02/2018

  24. Slide 24: Overview

    OVERVIEW • Overview of Air Quality Assessment in NSW – why and how • Understanding dispersion and how dispersion models work • Commonly used dispersion models in NSW • Overview of model inputs • Interpreting model outputs and results • Questions CLEAN TEQ SUNRISE PROJECT 15/02/2018

  25. Slide 25: Air Quality Assessment in NSW

    AIR QUALITY ASSESSMENT IN NSW • NSW EPA provide guidance for air quality assessment in NSW (the Approved Methods) which specifies: • How input data are collected and used: • Meteorological data; • Emissions data; • Terrain data; and • Building, receptors etc. • How dispersion modelling should be per

  26. Slide 26: What Is a Dispersion Model?

    WHAT IS A DISPERSION MODEL? • Set of mathematical equations (algorithms) which are used to characterise the behaviour of an emission source (e.g. a stack). • Can be used to predict pollutant concentrations at specified distances downwind of an emission source. Stack CLEAN TEQ SUNRISE PROJECT 15/02/2

  27. Slide 27: Example of Dispersion Equation (Gaussian Plume)

    EXAMPLE OF DISPERSION EQUATION (GAUSSIAN PLUME) Q  y 2    (z  He ) 2   2  ( z  H e )   ( x, y, z )  exp  2  exp    exp   2 y zU  2 y    2 z  2  2 z   2 • In simplified terms: where, • Emission rates determine source strength. (x,y,z) = concentration (µg/m

  28. Slide 28: Selecting the Right Dispersion Model

    SELECTING THE RIGHT DISPERSION MODEL • The model selected for an air quality • General rules assessment depends on the • Choose an approved ‘regulatory’ model. application: • Use professional judgement to select the • Some models may perform ‘better’ in best model for the application. complex terrai

  29. Slide 29: Common Dispersion Models Used in NSW

    COMMON DISPERSION MODELS USED IN NSW Model Notes AERMOD • Suitable for the majority of near field applications (<50km). • US EPA and Victorian EPA approved regulatory model and used and accepted in all other states – NSW EPA will include it when they update the Approved Methods. AUSPLUME • Previousl

  30. Slide 30: What Inputs Are Required for Dispersion Modelling?

    WHAT INPUTS ARE REQUIRED FOR DISPERSION MODELLING? Terrain Data Meteorological Dispersion Ground-level Data Model Concentrations Emission Source Data CLEAN TEQ SUNRISE PROJECT 15/02/2018

  31. Slide 31: Sunrise Project – Model Inputs (Terrain)

    SUNRISE PROJECT – MODEL INPUTS (TERRAIN) CLEAN TEQ SUNRISE PROJECT 15/02/2018

  32. Slide 32: Sunrise Project – Model Inputs (Meteorology)

    SUNRISE PROJECT – MODEL INPUTS (METEOROLOGY) • Available regional data reviewed. • Nearest site (Condobolin Airport) was comparable to EIS and other data sources (i.e. Northparkes & Cowal Mines). • Relatively ‘simple’ regional terrain – i.e. no mountains, etc. that would significantly alter weather

  33. Slide 33: Sunrise Project – Model Inputs (Emission Sources)

    SUNRISE PROJECT – MODEL INPUTS (EMISSION SOURCES) • Sulphuric acid plant emissions are based on: • NSW EPA’s allowable in-stack concentration limits (maximum case); and • Proposed stack design parameters. • Power generation emissions are based on: • Maximum power demand; and • Proposed stack design

  34. Slide 34: Sunrise Project – Interpreting Model Outputs

    SUNRISE PROJECT – INTERPRETING MODEL OUTPUTS Annual average SO2 (µg/m³) CLEAN TEQ SUNRISE PROJECT 15/02/2018

  35. Slide 35: Sunrise Project – NOx and SOx Emissions

    SUNRISE PROJECT – NOX AND SOX EMISSIONS • The phenomenon known as acid rain is a process where SOx and NOx emissions react with water in the atmosphere and fall to the ground as wet or dry deposition. • Acid rain historically occurred in industrialised areas with high emission loads of SOx and NOx (

  36. Slide 36: Sulfur Dioxide (SO2) Summary

    SULFUR DIOXIDE (SO 2) SUMMARY 1. We are selecting from amongst the world’s best acid plant manufacturers and designs 2. We are aiming for less than 280 ppm SO2 vs expected EPA limit of ~350 ppm (1,000 mg/m3 in POEO Clean Air Regulation standards). 3. We monitor stack emissions and publish online 4.

  37. Slide 37: Air Emissions – Sulfur Dioxide

    AIR EMISSIONS – SULFUR DIOXIDE C l e a n Te Q S u n r i s e PA G E 39

  38. Slide 38: How will we manage and monitor emissions

    How will we manage and monitor emissions • Process control systems to monitor and manage acid plant performance. • Stack concentration monitoring and reporting in accordance with EPL requirements. Clean TeQ PA G E 40

  39. Slide 39: Questions & Answers

    CLEAN oe Ni Sc Nickel Scandium 58.693 44.956 Powering innovation Questions & Answers

  40. Slide 40: Sunrise Project – Model Inputs (Emission Sources)

    Sunrise Project – Model Inputs (Emission Sources) •Sulphuric acid plant emissions are Exit velocity Flow rate based on: Stack Height Diameter (metres/ (cubic metres/ •NSW EPA’s allowable (metres) (metres) second) second) in-stack concentration limits (maximum case); and Sulphuric acid plant 80 1.8 2

  41. Slide 41: Backup

    CLEAN aa Ni Sc Nickel “0 Scandium 58.693 44.951 Powering innovation BACKUP

  42. Slide 42: Formation of Acid Clouds and Acid Rain

    Formation of Acid Clouds and Acid Rain Movement of Pollutants Gaseous Particulate eed 2 pollutants in pollutants in atmosphere atmosphere i= c 2 2 c=] P=] SOURCES : Pollutants | ay in cloud water & 2) and 8 voc NOx E precipitates E Wet Deposition voc @2 i Source: U.S. EPA

  43. Slide 43: Top Sources in County Area for SO2 Emissions

    : Top Sources in 7 County Area for SO2 Emissions (104816 tons/year) Fuel Comb- Commiinstitutional-Oil, 408 Industrial Processes - Ferrous Metals, 510 Fuel Comb - Industrial Waste Disposal, 360 Boilers, ICEs - Other, 2,187 Mobile - On-Road Gasoline Industrial Processes -NEC, Light Duty Vehicles, 348

  44. Slide 44: Worldwide sulfuric acid end-use

    Worldwide sulfuric acid end-use