Golden Arrow Resources Corp. · TSXV:GRG
Golden Arrow Resources — Investor Presentation (March 2013)
22 slides from Golden Arrow Resources's investor presentation, March 2013
Slide 1: Corporate Presentation March 2013
March 2013 GROSSO GROUP MEMBER COMPANY
Slide 2: Disclaimer
Disclaimer Forward‐Looking Statements • This presentation contains forward‐looking statements, including but not limited to comments regarding predictions and projections. Forward‐looking statements address future events and conditions and therefore involve known and unknown risks and uncertainties.
Slide 3: Company Overview
Company Overview Pioneer in Argentina since 1993 when the mining industry was opened to foreign investment Dr. Vicente Mendez, Argentinean Government’s chief geologist for 14 years, critical to early property selections Commitment to adopting modern exploration, environmental and community rel
Slide 4: Investment Highlights
Investment Highlights New Discovery in Jujuy Province: Chinchillas Silver Project. Intend to move the project towards a NI 43‐101 resource after a minimum 6,500 m infill and expansion drill program (Started November 2012) to follow‐up on the previous three campaigns drilled to date. Well positio
Slide 5: Chinchillas Silver Project, Jujuy
Chinchillas Silver Project, Jujuy Advanced‐stage, previously‐drilled project with 5 mineralized zones within a 1.5 km by 0.6 km area 14 historical drill holes of which 11 holes cut potentially economic mineralized intercepts. Golden Arrow’s Phase 1 drill program: 3,225 m infill and expansion p
Slide 6: Chinchillas Exploration Program
Chinchillas Exploration Program GRG’s Phase 1 Program – Drilling Completed 3,224 m infill and expansion drill program 26 of 27 holes contained significant mineralization Drilling focused on two main zones – Silver Mantos and Socavon del Diablo – both with room for significant expansion Sever
Slide 7: Chinchillas: Drilling to Date
Chinchillas: Drilling to Date 7
Slide 8: Silver Mantos Zone
Silver Mantos Zone Currently defined by 25 drill holes over an area ~23 ha (480 m x 480m) Phase 1 drilling identified near‐ surface disseminated mineralization mainly in two flat lying layers (“mantos”) composed of strongly clay altered volcanic tuffs and breccias Phase 2 drilling intercepted
Slide 9: Silver Mantos Drill Hole Highlights
Silver Mantos Drill Hole Highlights From Length Zn Zone HOLE To (m) Ag (g/t) Pb (%) (m) (m) (%) CGA‐17 3 34 31 132 ‐ ‐ CGA‐18 17 37.7 20.7 163 2.47 ‐ CGA‐19 5 22 17 49 ‐ 1.90 CGA‐20 23 26 3 80 0.83 ‐ CGA‐34 16 39 23 217 0.64 0.48 and 44 57 13 88 ‐ 2.32 CGA‐35 6 35 29 631 1.72 0.93 includes 26 32 6 1
Slide 10: Socavon del Diablo Zone
Socavon del Diablo Zone ~500 m east of Silver Mantos zone Currently defined by 16 drill holes that have tested an area approx. 5.5 ha (290 m x 190 m) Near‐surface mineralization includes manto‐style within favourable shallow dipping volcanic tuff horizons, crosscutting feeder structures and hy
Slide 11: Socavon del Diablo Summary of Drill intercepts
Socavon del Diablo Summary of Drill intercepts From To Length Ag Pb Zn Zone HOLE (m) (m) (m) (g/t) (%) (%) CGA‐21 2 79 77 64 1.36 3.09 CGA‐22 45 57 12 75 1.15 3.98 CGA‐23 18 29 11 47 0.86 1.10 CGA‐24 25 32 7 42 1.14 4.22 CGA‐25 0 36 36 64 0.60 0.97 SOCAVON CGA‐26 66 72 6 86 1.73 4.09 del DIABLO CGA‐
Slide 12: Chinchillas Next Steps
Chinchillas Next Steps • Complete 6,500 m drill program (Started November 2012) • In‐fill and step‐out at Silver Mantos and Socavon del Diablo; definition and expansion of known zones • Test new targets in Chinchillas basin: Near surface targets, contact zone breccias, at depth within basin (feeder
Slide 13: Other Portfolio Highlights
Other Portfolio Highlights Mogote Copper Gold Silver Project (JV with Vale) Caballos Copper Gold Project Property is 83 km2 (8,300 ha) and 100% owned 100% owned 252 km2 (25,200 ha) property Drill programs: 2004 – 5 hole, 1,475 m diamond drill; 2005 Located in a developing Porphyry district b
Slide 14: Other Portfolio Highlights
Other Portfolio Highlights Potrerillos Gold‐Silver Project Pescado Gold Project 4 km2 project, 100% owned, located 8 km east of Veladero 100 % owned 25 km2 property gold‐silver mine Strategically‐located immediately south and Access provided by all‐season Veladero mine road which southwest o
Slide 15: Project Portfolio
Project Portfolio Discovery By Management 15
Slide 16: Management & Directors
Management & Directors JOSEPH GROSSO – Executive Chairman Mr. Grosso is a respected entrepreneur who is a specialist in financing, negotiations, corporate and marketing strategy, and socio economic commitment. He was one of the early pioneers of the mining sector in Argentina in 1993 when mining was
Slide 17: Carlos H. Fernandez Mazzi – President & CEO
Carlos H. Fernandez Mazzi – President & CEO Mr. Carlos Fernandez Mazzi’s career spans over 30 years in international business and investment banking highlighted by his leadership as Chief Executive Officer of the Bolivian subsidiary of APEX Silver Mines where Mr. Fernandez Mazzi led the strategy, fi
Slide 18: Management & Directors
Management & Directors BRIAN McEWEN PGeol. ‐ VP Exploration & Development Mr. McEwen is a professional geologist with more than 30 years of exploration and production experience in open‐pit and underground mining projects and operations. The extent of his experience is global in managing numerous pr
Slide 19: Directors
Directors CHAD WILLIAMS PEng – Director Mr. Williams is the former CEO, President and Director of Victoria Gold Corp. where he raised $110 million in seven financings, completed two corporate mergers, and increased market value up to 20‐fold in a four year period. Mr. Williams has extensive experien
Slide 20: Opportunity
Opportunity Intend to move the Chinchillas Silver Project towards a NI 43‐101 resource after a minimum 6,500 m infill and expansion drill program which started November 2012). Well positioned for shareholder growth with a strong cash position in the treasury. Strong property base in Argentina
Slide 21: Capital Structure
Capital Structure As at February 25, 2013 Shares Issued: 41,823,655 Warrants: 0 Options: 4,100,000 Fully Diluted: 45,923,655 ¾ Average option price is $0.36 21
Slide 22: Contact
Contact Corporate Head‐Office: Suite 709, 837 W Hastings ST Vancouver, BC, Canada V6C 3N6 Telephone: 604 687 1828 Toll free: 1 800 901 0058 info@goldenarrowresources.com TSX.V: GRG; Frankfurt: GAC www.goldenarrowresources.com 22
Golden Arrow Resources — Investor Presentation (March 2013) on 6ix