  1. Slide 1: Building South Australia's Infrastructure Gateway

    South Australian Resources & Energy Investment Conference 20 April 2016 Central Eyre Iron Project Building South Australia’s Infrastructure Gateway

  2. Slide 2: Cautionary Statements

    Cautionary Statements Forward Looking Statements This announcement contains certain statements with respect to future matters which may constitute "forward-looking statements". Such statements are only predictions and are subject to inherent risks and uncertainties which could cause actual values, r

  3. Slide 3: The Central Eyre Iron Project

    The Central Eyre Iron Project

  4. Slide 4: Mining and Ore Processing Operations

    Mining and Ore Processing Operations

  5. Slide 5: Multi-Use Infrastructure

    Multi-Use Infrastructure RON ROAD

  6. Slide 6: Strengthening the Team – Emerald Grain

    Strengthening the Team – Emerald Grain

  7. Slide 7: Strengthening the Team – Local Relationships

    Strengthening the Team – Local Relationships

  8. Slide 8: Strengthening the Team – China Railway Group

    Strengthening the Team – China Railway Group

  9. Slide 9: Strengthening the Team – China Railway Group

    Strengthening the Team – China Railway Group

  10. Slide 10: Strengthening the Team – China Railway Group

    Strengthening the Team – China Railway Group

  11. Slide 11: Strengthening the Team – China Railway Group

    Strengthening the Team – China Railway Group

  12. Slide 12: Strengthening the Team – Shandong Iron and Steel

    Strengthening the Team – Shandong Iron and Steel

  13. Slide 13: Shansteel and Iron Road and China Railway

    Shansteel and Iron Road and China Railway

  14. Slide 14: Identifying Additional Strength and Opportunity

    Identifying Additional Strength and Opportunity

  15. Slide 15: Operating Costs

    Operating Costs (US$/dmt FOB) PFS Operating Cost US$55/t DFS US$44.33/t Optimisation Value Drive US$37.72/t US$35.38/t Accuracy and Confidence

  16. Slide 16: Capital Requirements

    Capital Requirements $600-800 million of targeted reductions

  17. Slide 17: Key project partners established

    Key project partners established CEIP has been de-risked over 8 years Project essential to South Australia’s prosperity “This project has the potential to transform the Eyre Peninsula” Premier Weatherill September 2015

  18. Slide 18: Appendix 1 – CEIP Ore Reserve Summary

    Appendix 1 Table 1 – CEIP Ore Reserve Summary Metric Tonnes Fe SiO2 Al2O3 Resource Classification (Mt) (%) (%) (%) Proved 2,131 15.55 53.78 12.85 Probable 1,550 14.40 58.58 12.64 Total 3,681 15.07 53.70 12.76 The Ore Reserves estimated for CEIP involving mine planning is based on and fairly represen

  19. Slide 19: Appendix 2 – CEIP Global Mineral Resource

    Appendix 2 Table 2 – CEIP Global Mineral Resource Tonnes Fe SiO2 Al2O3 P LOI Location Classification (Mt) (%) (%) (%) (%) (%) Measured 2,222 15.69 53.70 12.84 0.08 4.5 Murphy South/Rob Roy Indicated 474 15.6 53.7 12.8 0.08 4.5 Inferred 667 16 53 12 0.08 4.3 Boo-Loo/Dolphin Indicated 796 16.0 53.3 12

  20. Slide 20: Appendix 3 – Agreements summary

    Appendix 3 Tripartite agreement with China •3 party agreement to work towards joint development of the Central Eyre Iron Project •Builds upon existing agreements with CREC and ShanSteel Railway and ShanSteel •Working towards Final Investment Decision Strategic cooperation agreement •Agreement to exe