Slide 1: ANCCG update: Second runway
ANCCG update Second runway Kellie Roland Airport Planning Manager 26 July 2017
Slide 2: Passenger numbers growth forecasts
1 Since 2014 passengers numbers have increased from 14.5 million to 19 million 24 million by 2024 40 million by 2044
Slide 3: Airport development projects including a second runway
2 A new domestic jet terminal joined on to the existing international terminal Upgrading the international check-in and departure experience and public arrivals area Improving the roading, public transport and walking access around the airport precinct A second runway
Slide 4: Investing $1 million every working day
3 Investing $1 million every working day $1.8 billion by 2022
Slide 5: Planning context and designation
4 Existing Auckland Airport Designation Airport Masterplan 2014 Auckland Unitary Plan Process Aircraft Noise Areas
Slide 6: Ten alternative options considered and assessed
5 Ten alternative options considered and assessed Eight options to the north Two options to the south Carried out by a range of technical specialists using a multi-criteria analysis
Slide 7: Determined best location near what was consented 16 years ago
6 Determined best location is still near what was consented 16 years ago North of the international terminal and the existing southern runway Changes needed include Moving 72 metres further north Increasing the length by 833 metres
Slide 8: Auckland Airport
A Auckland Airport
Slide 9: Why this option
8 Why this option Scored the highest in terms of environmental and cultural criteria Will not require any reclamation Considered to have the least effects on natural character Is in keeping with the character of the airport environs
Slide 10: Affected landowners and locations
9 504 affected 475 are residential properties Aorere College 25 Rural Landowner locations Mangere Papatoetoe Flat Bush Clover Park
Slide 11: Opportunity to engage face to face
10 Opportunity to engage face to face How airport manages aircraft noise in the community When the runway will be operational - timings Noise Mitigation Programme – eligibility and benefits Explain NoR process
Slide 12: NoR Process – what next
NoR Process – what next 11 Alteration to Council makes Public hearing on Designation / NoR recommendation NoR Prepared by AIAL on NoR Council notifies NoR lodged with Public submissions decision to Council period submitters and land owners/occupiers Council assesses NoR publicly New Designation NoR
Slide 13: Timeline: information sessions to hearings
12 July 2017 Affected landowner information sessions August 2017 NoR submitted October 2017 Publicly notified – submissions opened February/March 2018 Hearings