Auris Minerals Ltd. · ASX:AUR

Auris Minerals — Investor Presentation (February 2017)

14 slides from Auris Minerals's investor presentation, Feb 21, 2017

  1. Slide 1: Investor Presentation

    POSITIONED FOR HIGH GRADE COPPER-GOLD DISCOVERIES IN THE HEART OF THE BRYAH BASIN Investor Presentation February 2017 RNI NL Suite 3, 703 Murray St West Perth WA 6005 T +61 6109 4333 E general@rninl.com.au

  2. Slide 2: Positioned for Success

    Positioned for Success RNI ticks all the boxes  Experienced + Focussed + Invested Team = Right People  VMS Province + Extensive Tenement Holding + Adjacent Discoveries = Right Address  Effective + Systematic + Disciplined = Right Approach  Supportive Shareholder Base + Funding Plan in Place = St

  3. Slide 3: Corporate Review - Complete

    Corporate Review - Complete Fresh start  Name Change Auris Minerals Limited New identity  Improved functionality  Board Restructure Focused team; incentivised Reduction in costs  Reduction in shares  Tightening the Issued Cap Consolidation – 5:1 Less volatility  Reduction in costs  Tidy up re

  4. Slide 4: Corporate Overview

    Corporate Overview Capital Structure Shareholder Info 1 Share Price (3 month range) 1.0c - 1.7c Board and Management 7.49% Shares on Issue1,2 1,560m David Bailey 4.70% Market Cap ~A$21m Michael Fotios and Associates 4.65% Cash3 ~A$1.9m Total Shareholders ~2,963 1 Plus 32m unlisted options exercisabl

  5. Slide 5: Extensive Tenement Package

    Extensive Tenement Package 1,553 km2 landholding in the highly prospective Bryah Basin RNI NL Suite 3, 703 Murray St West Perth WA 6005 T +61 6109 4333 E general@rninl.com.au 4

  6. Slide 6: Project Summary & Future Work Programs

    Project Summary & Future Work Programs Forrest Project Doolgunna Project ► Three highly prospective drill ready VMS targets all ► Well positioned project within the emerging analogous to the proximal Horseshoe Lights VMS regional VMS camp deposit ► Advanced VMS target (Cuba Prospect) showing Ongoing

  7. Slide 7: Forrest Project

    Forrest Project The Next VMS Discovery? Highly prospective VMS targets ► Analogous to proximal Horseshoe Lights VMS deposit ► Horseshoe Lights historic production - 290,000 oz Gold @ 8g/t Ore Grade and 46,400 tonne Copper @ 10% Ore Grade Right Geology ► Favourable stratigraphy Extensive Geophysics ►

  8. Slide 8: Wodger Prospect

    Wodger Prospect Phase 1 AC Drilling ► Confirmed 1km long VMS mineralized horizon within the modelled alteration halo ► Produced significant copper intercepts ► Visible secondary copper minerals (Malachite) Phase 2 AC Drilling ► 50 Holes completed to extend the horizon ► Visible secondary copper mine

  9. Slide 9: Forrest Prospect

    Forrest Prospect Phase 1 AC Drilling ► Confirmed a stratigraphic offset ► Intersected anomalous pathfinder geochemistry Previous Copper intersected B ► 9.1 m @ 5.27% Cu from 142.95 m (FGDD001) ► 5.15 m @ 4.0% Cu from 152 m (FGDD002) ► 16.2 m @1.8% Cu from 198.4 m (FGDD003) A Next Steps ► Surface geo

  10. Slide 10: Doolgunna Project

    Doolgunna Project Substantial Upside Well positioned ► Proximal to the high grade DeGrussa Mine (14.3Mt @ 4.6% Cu & 1.6g/t Au) and the Monty discovery (1.05Mt @ 9.4% Cu & 1.6g/t Au) ► Increased level of exploration activity by neighbours, Sandfire and Talisman ► Nearby plant requiring feed Highly Pr

  11. Slide 11: Cashmans Project

    Cashmans Project Proven VMS District ► Recent drilling at Orient intersected 3m of massive sulphide containing visible chalcopyrite ► A halo of enriched copper (chalcopyrite), lead (galena) and zinc (sphalerite) values – Typical of VMS deposits and proves RNI’s exploration model ► Large gravity low

  12. Slide 12: Investment Proposition

    Investment Proposition ► Experience, focused and invested team Right People  ► Extensive, highly prospective tenement portfolio Right Address  ► Systematic, disciplined and effective exploration activities Right Approach  ► Funded, with backing from strategic investment groups Strong Support Base

  13. Slide 13: Competent Person & Forward Looking Statements

    Competent Person & Forward Looking Statements Competent Person’s Statement Information in this announcement that relates to exploration results is based on and fairly represents information and supporting documentation prepared and compiled by Richard Pugh BSc (Hons) who is a Member of the Australas

  14. Slide 14: RNI NL (ASX: RNI)

    RNI NL (ASX: RNI) Contact: Debbie Fullarton – Executive Director Unit 3, 703 Murray Street West Perth WA 6005 PO Box 298, West Perth WA 6872 P +61 8 6109 4333 E general@rninl.com.au / W www.rninl.com.au RNI NL Suite 3, 703 Murray St West Perth WA 6005 T +61 6109 4333 E general@rninl.com.au

Auris Minerals — Investor Presentation (February 2017) on 6ix