Panoro Energy ASA · OSL:PEN

Panoro Energy ASA — Investor Presentation (January 2015)

34 slides from Panoro Energy ASA's investor presentation, Jan 12, 2015

  1. Slide 1: Investor Presentation

    Investor Presentation 12 January 2015

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute an offer to buy or sell shares or other financial instruments of Panoro Energy ASA (“Company”). This presentation contains certain statements that are, or may be deemed to be, “forward-looking statements”, which include all statements other than state

  3. Slide 3: Panoro Energy ASA – Company snapshot

    Panoro Energy ASA – Company snapshot Key Facts  Oil and Gas E&P Company Listed in Norway, currently focused on West Africa OSE ticker code: PEN Shares outstanding: 234.5 million  Renewed Board of Directors elected in October 2014 Market Cap (09/01/2015): ~USD 47.4 million  Experienced Management

  4. Slide 4: Executive Management Team

    Executive Management Team Nishant Dighe, Chief Executive Officer. Nish has over 20 years of experience in oil and gas. He has Masters degrees in Chemical Engineering and Petroleum Engineering from Imperial College, London, and an MBA from Warwick University. Originally trained as a reservoir enginee

  5. Slide 5: Panoro Board of Directors (Non-Executive)

    Panoro Board of Directors (Non-Executive) Mr. Julien Balkany, Chairman of the Board, French citizen resident in London, he has served as managing member and Founder of Nanes Balkany Partners LLC, a NY-based activist hedge fund which primarily pursues value investments in publicly traded oil and gas

  6. Slide 6: Panoro Assets in Africa

    Panoro Assets in Africa  Two core Assets in West Africa with discovered resources under development and significant exploration upside Nigeria: OML 113, offshore Western Nigeria Geologically part of the West African Transform Margin Gabon: Dussafu Permit, offshore Southern Gabon Geologically in the

  7. Slide 7: Financial Snapshot

    Financial Snapshot  Low G&A Panoro Core G&A trend 3,500  Clear trend of reducing cost 3,000 base with reduction initiatives 2,500 2,000 continuing 1,500  Focused Management team. All 1,000 500 staff based in London - Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014 G&A-USD 000  Q3 Financi

  8. Slide 8: OML 113

    OML 113 Near term Aje field oil development followed by gas/condensate development and strong exploration upside Project Status West African Gas Pipeline  Partners are currently focused on delivering 2015 oil production from Aje field BENIN NIGERIA  Initial 2 well Cenomanian oil project: Aje-4 re-

  9. Slide 9: Aje Progress Report Summary

    Aje Progress Report Summary Field Development Plan – Diagrammatic Representation Aje Status FPSO Cenomanian Oil Development: (Water depth approx. 100m)  Field development plan Government Approval   Field development FID Decision  Flexible Production Riser  First Oil Q4 2015 Flexible Gas Lift Ri

  10. Slide 10: Aje Cenomanian Oilfield Development

    Aje Cenomanian Oilfield Development Aje Field Appraisal and Development Scheme  Key Subsea Equipment and Contracts:  Trees and Subsea Manifold purchased  Flowlines and umbilicals ordered Front puffin FSPO Front puffin FSPO  Transport and Installation Contract awarded  FPSO vessel contracted and

  11. Slide 11: Aje New 3D Seismic

    Aje New 3D Seismic  OML 113 Prospectivity  7 leads in post-rift middle cretaceous section have been identified from existing seismic data  At least further 2 leads have been identified in syn-rift  Ogo 2013 Discovery in OPL 310  Ogo-1 and Ogo-1ST were drilled by Afren on OPL 310 in 2013. Afren

  12. Slide 12: Joint Venture Metrics for Aje Oil Development

    Joint Venture Metrics for Aje Oil Development Cenomanian Oil Development only1 Aje Value net to Panoro 300 Gross Field Development Metrics 250 Phase 1 and 2, Cenomanian P50 (50.88MMbbls2) – Aje 4, 5, 6 and 7 Break even $45 200 Break even $31 CAPEX from 1/10/2014 to first oil = $211MM3 Net Present Va

  13. Slide 13: Turonian Gas Condensate Field

    Turonian Gas Condensate Field Concept Evaluation Stage  AGR TRACS Stand-alone Gas Development Concept Example1 (JV will be evaluating this development concept as well as other alternatives)  Turonian Gas is rich in valuable liquids  AGR TRACS concept includes:  Subsea wells tied back via a subse

  14. Slide 14: Full Field Aje Metrics

    Full Field Aje Metrics1 TRACS Cenomanian Oil plus Turonian Gas Condensate Development TRACS competent persons report in July 2014 which includes a development of Cenomanian Oil as well as separate conceptual development Turonian Gas and Condensate confirms significant value in the discovered resourc

  15. Slide 15: Dussafu

    Dussafu Large exploration and development block with multiple discoveries and prospects Dussafu (Gabon) Project Status Operator Harvest Natural Resources (66.67%)  2,775km2 license in Southern Gabon pre-salt fairway Working Interest 33.33%  Total of five pre-salt discoveries (4 oil, 1 gas) with Ba

  16. Slide 16: Dussafu – The Etame Analogue

    Dussafu – The Etame Analogue Etame is a Proven Producer 40km North of Ruche The initial development in the Etame License just north of Dussafu was based on 25MMbbl field with high uncertainty. Replicating early success of Etame would create significant shareholder value for Panoro.  Etame discovery

  17. Slide 17: Dussafu – Exclusive Exploitation Authorisation (EEA)

    Dussafu – Exclusive Exploitation Authorisation (EEA)  EEA awarded 17th July 2014 (Ruche C)  Area of 850.5 km2  Dussafu JV can exploit hydrocarbon resources in EEA area for up to 20 years (Ruche D)  Detailed development and production program approved (FDP)  Single FPSO with tiebacks  Central R

  18. Slide 18: Full 3D Seismic Coverage over License

    Full 3D Seismic Coverage over License  Inboard 3D  Acquired in 2005  Covers the GMC 1-X gas discovery  Central area 3D 31  Acquired in 2011 33 28  550km2 mainly targeting synrift exploration M’Bya opportunities identified on 3D M’Wengui  Dussafu 3D  Acquired in 1995 32  1200 km2 3D seismic

  19. Slide 19: Gamba Oil Fields and near-field Gamba prospects

    Gamba Oil Fields and near-field Gamba prospects  Panoro has 3 small Gamba reservoir oil fields within the EEA area1. Gamba production is well established.  Many Gamba reservoir oil fields (Ruche D) currently producing in Gabon  Reservoir is very high quality  Numerous Gamba Prospects within EEA:

  20. Slide 20: Dussafu Dentale Potential

    Dussafu Dentale Potential  Dentale has become an additional major contributor to value in Dussafu  Moubenga Dentale discovery (Ruche C) is part of FDP, and tested at 3700bopd. Tortue Dentale Sand 6, reservoir has very good reservoir quality. Other Tortue sands were also oil bearing and Ruche also

  21. Slide 21: Dentale Outboard Leads 1 & 2

    Dentale Outboard Leads 1 & 2 (3D PSTM-Aug 2014) Lead 2 Lead 1 Lead 1 Lead 2 Lead 1 Lead 2 Salt Salt Dentale Dentale Mobile Shale Mobile Shale 8 km 21

  22. Slide 22: Dussafu Progress Report Summary

    Dussafu Progress Report Summary Cluster Development:  Declaration of commerciality   Award of Exclusive Exploitation Authorisation   Field development plan Government Approval   Field development Decision Point Q1 2015 Exploration  Seismic acquisition   Seismic final PSDM processing Q4 201

  23. Slide 23: Dussafu FID Considerations

    Dussafu FID Considerations  Under the terms of the EEA JV has until mid 2018 to commence production. Operator estimates 21 months from FID to first oil.  Seismic interpretation underway. Early indications that material near field prospects will emerge  Material near field discoveries may impact t

  24. Slide 24: Joint Venture Metrics for Dussafu Development

    Joint Venture Metrics for Dussafu Development Ruche Area EEA1 Dussafu Value net to Panoro 600 Gross Field Development Metrics 500 JV P50 Model (37.9 MMbbls2) 400 Break even $47 CAPEX from 1/10/2014 to first oil = $287MM Net Present Value $Million Break even $36 Total CAPEX = $653MM 300 CAPEX = $17.2

  25. Slide 25: Dussafu Resources

    Dussafu Resources1 Dussafu Gross 1C Contingent Dussafu Gross 2C Contingent Dussafu Gross 3C Contingent Resources2 Resources2 Resources2 3.1 6.3 1.8 1.9 7.0 5.6 16.5 4.3 3.1 17.0 36.3 70.6 4.6 MMbbls MMbbls MMbbls 14.7 9.9 12.1 5.8 27.7 Tortue Gamba 1C Tortue Dentale 1C Tortue Gamba 2C Tortue Dentale

  26. Slide 26: Recap of Panoro Development projects

    Recap of Panoro Development projects  Aje  May 2013, new partnership to focus on early cash flow from Cenomanian Oil  October 2013, major discovery in OPL 310 license next to OML 113 – one of the largest in 2013 globally  March/April 2014 seismic acquired over OML 113 license in conjunction with

  27. Slide 27: Panoro Reserves and Resources Snapshot

    Panoro Reserves and Resources Snapshot Aje Field 1 Dussafu 2 Net Reserves and Resources, 32.7MMBOE Net Contingent Resources, 3C 12.5 MMbbls, 2C 6.8 MMbbls 1.8 1.4 Aje Cenomanian 1P Phase 1 - 2 wells, 2.0 3.2 MMbbls Aje Cenomanian 2P 3.2 Phase 2 - 2 wells, 1C = 1.2 MMbbls 15.8 Aje Cenomanian 2C 1.6 2

  28. Slide 28: Dussafu & Aje Field Development: Cash Flows

    Dussafu & Aje Field Development: Cash Flows Project Net Cash Flows at $70/Bbl from Oil Development Projects Based on Development of the Aje Cenomanian Oil and simulating Dussafu Cluster Development. Comparison of Dussafu FID in Q1 2015 or Q1 2016. JV Model Net Cash Flows JV Model Net Cash Flows P50

  29. Slide 29: Dussafu & Aje Field Development: Cash Flow Forecast

    Dussafu & Aje Field Development: Cash Flow Forecast Project Net Cash Flows based on Forward curve oil prices as of 6 Jan 2015 from Oil Development Projects Based on Development of the Aje Cenomanian Oil and simulating Dussafu Cluster Development with FID Q1 2015, current forward curve indicates cash

  30. Slide 30: Dussafu & Aje Field Development: Cash Flows

    Dussafu & Aje Field Development: Cash Flows Project Net Cash Flows at $90/Bbl from Oil Development Projects Based on Development of the Aje Cenomanian Oil and simulating Dussafu Cluster Development Comparison of FID in Q1 2015 or Q1 2016. JV Model Net Cash Flows JV Model Net Cash Flows P50 cases at

  31. Slide 31: Panoro NAV Build-Up at $70/bbl, 10% discount rate

    Panoro NAV Build-Up at $70/bbl, 10% discount rate Dussafu NAV US$m  Panoro has a strong cash position with potential incremental 800 value from the Manati earn-out  Substantial value exists in Panoro’s discovered resource base in Aje and Dussafu  Significant Exploration upside recognised in both

  32. Slide 32: Aje and Dussafu Project Timelines

    Aje and Dussafu Project Timelines 2015 2016 2017 J F M A M J J A S O N D 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q Nigeria OML 113 Seismic Processing Interpretation Exploration Drilling Drill Subsea Engineering and Procurement FPSO FPSO Refurbishment Aje 4 and 5 Drilling Drilling Installation Installation Aje First O

  33. Slide 33: Panoro – Strengths and Objectives

    Panoro – Strengths and Objectives  Two West African assets with line of sight to production with additional significant exploration upside  Strong track record from very experienced Management and Board Take advantage of all opportunities  Management and Board are fully aligned to create sharehol

  34. Slide 34: Panoro Energy

    Panoro Energy

Panoro Energy — Investor Presentation (January 2015) on 6ix