  1. Slide 1: 2024 Annual General Meeting addresses and presentation

    ASX AN N OU N CEM EN T 2024 Annual General Meeting addresses and presentation 15 November 2024 In accordance with Listing Rule 3.13.3, Carnarvon Energy Limited (Company) is please to provide the Chair and CEO addresses and the CEO’s address and presentation, to be given at the Company’s Annual Gener

  2. Slide 2: 2024 Annual General Meeting Business Update

    2024 Annual General Meeting Business Update 15 November 2024 ASX: CVN

  3. Slide 3: Disclaimer

    Disclaimer Contingent and prospective resources The resource estimates outlined in this presentation are based on and fairly represent information and supporting documentation No representation, warranty or assurance, express or implied, is given or made in relation to any forward looking CARNARVON

  4. Slide 4: Carnarvon Energy Snapshot

    Australia’s Premier Liquids Rich, Low CO2 Portfolio North-Western Australia Carnarvon Energy is an energy explorer and developer with assets centred in the highly prospective Bedout sub-basin CARNARVON ENERGY 2024 AGM Carnarvon Energy (ASX: CVN) Snapshot  The Company’s core assets are in the Bedout

  5. Slide 5: Changes since the 2023 AGM

    Changes since the 2023 AGM Refreshed Board and strategic objectives CARNARVON ENERGY 2024 AGM Rob Black Susan Jones Russell Delroy Will Barker Philip Huizenga Alex Doering Chair Non-Executive Director Non-Executive Director Non-Executive Director Chief Executive Officer Chief Financial Officer NEW N

  6. Slide 6: Preserving existing balance sheet strength

    Preserving existing balance sheet strength CARNARVON ENERGY 2024 AGM Strong Balance Sheet: • A$177 million cash (Sep 24 Qtr) • US$90 million (~A$138m) carry to fund CAPEX including Dorado development • Nil debt Maintaining Strength: • No material acquisitions being targeted • Monetised and exited fr

  7. Slide 7: Significant reduction to corporate & admin cost base

    Significant reduction to corporate & admin cost base CARNARVON ENERGY 2024 AGM Measures Introduced  CEO and COO positions merged including reduction in CEO salary  Reduction in Board base remuneration  Reduction in head-count  Ongoing corporate and administrative costs reduced by ~40% compared t

  8. Slide 8: Maximising value from the core asset base

    Maximising value from the core asset base Dorado Integrated Energy Development Project CARNARVON ENERGY 2024 AGM  Phase 1 - Liquids project optimised with the economics enhanced  Finalising development optimisation studies to maximise capital efficiency and project value  High-margin Pavo tie-bac

  9. Slide 9: Dorado – Phase 1 Liquids Development

    Dorado – Phase 1 Liquids Development Building energy security for Australasia CARNARVON ENERGY 2024 AGM Project Highlights  One of Australia’s largest undeveloped conventional energy resource projects  Shallow-water development (~100m water depth)  Phase 1, light-sweet crude and condensate recove

  10. Slide 10: Dorado optimisation

    Dorado optimisation 2024 Dorado optimisation involves lower upfront capex and higher capital efficiency CARNARVON ENERGY 2024 AGM Key Development Concept Updates  Optimised throughput to maximise capital efficiency and project value  Phasing of development wells  Progressing the Pavo field develo

  11. Slide 11: Dorado Project Progress

    Dorado Project Progress Joint venture aligned with targeting FID in 2025 CARNARVON ENERGY 2024 AGM 2024 Half-year results  Offshore Project Proposal approved in 2023  Phase-1 liquids development progressing  Assessment of FPSO options ongoing, technical studies ongoing  Targeting FID in 2025 10

  12. Slide 12: Dorado is more than a near-term liquids project

    Dorado is more than a near-term liquids project Phase 2 gas export is part of an integrated Dorado development CARNARVON ENERGY 2024 AGM Indicative development phasing Indonesia 1 2 3 4 Volume Potential Bedout gas and Darwin liquids export options Time Dorado Phase 1 Pavo North Pavo South Bedout Gas

  13. Slide 13: Extensive portfolio of liquids rich, low CO2 opportunities

    Extensive portfolio of liquids rich, low CO2 opportunities* Near-field liquids exploration portfolio and Dorado tie-back opportunities CARNARVON ENERGY 2024 AGM Key Discovered Liquids 2C (mmbbl) Pavo Dorado, 162 205 (North), WA-435-P (10%) Roc Declaration of WA-436-P (20%) 43 Location Dorado / Pavo

  14. Slide 14: Extensive portfolio of liquids rich, low CO2 opportunities (gas)

    Extensive portfolio of liquids rich, low CO2 opportunities* Gas exploration and development opportunities (mmboe) CARNARVON ENERGY 2024 AGM Ara Remainder N Ara Remainder Wendolene Yuma Bandy ARA 862 Revelstoke CLUSTER WENDOLENE 580 Murray Yuma Triel CLUSTER Revelstoke Bandy Wendolene Murray Avoca St

  15. Slide 15: Carnarvon Energy Investment Summary

    Carnarvon Energy Investment Summary Expected to be fully funded1 for the world-class Dorado development and poised to realise immense value upside through Pavo tie-back and future gas-focussed exploration CARNARVON ENERGY 2024 AGM World-class asset portfolio with Exploration (inc. Pavo South) and si

  16. Slide 16: Philip Huizenga

    Philip Huizenga Chief Executive Officer Investor.relations@cvn.com.au www.carnarvon.com.au 15

  17. Slide 17: Appendices

    Appendices 16

  18. Slide 18: Bedout Basin Contingent Resources

    Bedout Basin Contingent Resources I N V E S T O R P R E S E N T A T I O N 17

  19. Slide 19: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 18

  20. Slide 20: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 19

  21. Slide 21: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 20

  22. Slide 22: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 21

  23. Slide 23: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 22

  24. Slide 24: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 23

  25. Slide 25: Bedout Basin Prospective Resources

    Bedout Basin Prospective Resources* P R E S E N T A T I O N I N V E S T O R * Refer to cautionary statement on slide 3 24

  26. Slide 26: Chair's Address

    Chair’s Address Mr R o bert Black The Company has been through some substantial changes since the last AGM, which I’d like to highlight. Following last year’s AGM, the Company announced that it was undertaking a Board succession plan. This succession plan has now been completed and I believe the ref

  27. Slide 27: Chair's Address (continued)

    However, I know that we need to rebuild shareholders confidence in the project. To begin achieving this, we look forward to reaching some important upcoming milestones, such as entering Front-End Engineering and Design (FEED). Progressing Dorado is the key element towards maximising shareholder valu

  28. Slide 28: Chair's Address (continued)

    While progress has been made on the refined strategic objectives, we continue to assess ways to improve the Company’s position and deliver the best value outcome for shareholders. Before we commence the formal meeting, I would like to thank my fellow Board members for their efforts during the year i

  29. Slide 29: CEO's Address

    CEO’s Address Mr Phi l i p H ui zenga Carnarvon Energy is an ASX-listed oil and gas exploration and development company with assets in the highly prospective Bedout Sub-basin, located around 150km north of Port Hedland, offshore Western Australia. The enormous size of these tenements, in which Carna

  30. Slide 30: CEO's Address (continued)

    situated to ensure that the proposed infrastructure at Dorado can be fully utilised for many years to come. We also have valuable discovered gas resources that will form part of the future Phase 2 gas export. To support additional infrastructure investment to bring this gas to market, the joint vent