State Gas Ltd. · ASX:GAS

State Gas — Australian Energy & Minerals Investor Conference (March 2021)

9 slides from State Gas's conference presentation, Mar 17, 2021

  1. Slide 1: Australian Energy & Minerals Investor Conference

    Australian Energy & Minerals Investor Conference Richard Cottee Executive Chairman 17 March 2021 ASX:GAS

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer Future Performance This presentation (Presentation) has been prepared by State Gas Limited (ACN 617 322 This Presentation contains certain “forward looking statements”. Forward-looking 488) (State Gas). The Presentation and information contained in it is being provided to state

  3. Slide 3: CSG Fundamentals

    CSG Fundamentals ➢ In Coal Seam Gas (CSG), coal is both the source and the trap ➢ With increasing depth, coal permeability generally decreases (the coal becomes tighter) whilst gas content (saturation) increases • shallower coal → easier for gas to escape from its cleats but there is less gas ➢ Rece

  4. Slide 4: State Gas Project Areas

    State Gas Project Areas PL 231 ➢ 181 km2, 100% owned ➢ Reid’s Dome Beds CSG + Conventional gas ➢ Simple path to commercialization ➢ Freehold grazing land, no native title ATP 2062 (granted in Oct. 2020) ➢ 1413 km2, 100% owned ➢ Bandanna CSG + Conventional gas ➢ Option for conversion to PL after disc

  5. Slide 5: Reid's Dome Beds CSG (PL 231)

    Reid’s Dome Beds CSG (PL 231) Key Facts ➢ Numerous stacked coals over 800+ metre section ➢ Reid’s Dome Beds coal measures are correlative from north to south throughout PL 231 ➢ Doubly plunging anticline with natural fractures and enhanced permeability in the coals ➢ Mature coal with high gas satura

  6. Slide 6: Reid's Dome (PL 231) Results so far

    Reid’s Dome (PL 231) Results so far Achieved ➢ CSG confirmed to extend from south (Nyanda) to north (Aldinga) of PL231 ➢ Producibility of Nyanda area confirmed (Nyanda 4, 7 & 8) ➢ Confirmed successful well construction techniques ➢ Conventional gas confirmed in north (Primero West 1 & Aldinga East 1

  7. Slide 7: Latest Gas Flow Rates highly encouraging

    Latest Gas Flow Rates highly encouraging Nyanda-4; Normalised Production 3 Nyanda wells are currently on production test 700 Period # 1 gas ➢ Latest production over prior 24 hours (to 6am 16 600 March 2021): Period # 2 gas Period # 3 gas ─ Nyanda 4 producing 620,000 cubic ft per day – a 500 Gas flow

  8. Slide 8: ATP 2062 Rolleston-West

    ATP 2062 Rolleston-West ➢ Contiguous with Reid’s Dome – synergistic development ➢ Proposed Rougemont wells are into known Bandanna coals, with analogues under development/production to north and south- east of ATP 2062 ➢ Target coals are: • between 350m and 600m (depths suggest good gas content) • o

  9. Slide 9: Contact

    Contact Level 8 46 Edward Street Brisbane QLD 4000 Australia Email info@stategas.com stategas.com

State Gas — Australian Energy & Minerals Investor Conference (March 2021) on 6ix