  1. Slide 1: 2026 Annual General Meeting – Company Update

    Company Update | November 2026 2026 Annual General Meeting – rsonal use only Company Update 17 November 2026

  2. Slide 2: Disclaimer

    Company Update | November 2026 Disclaimer This presentation (Presentation) has been prepared by State Gas Limited (ACN 617 322 488) (State Gas). The Information about Contingent Resource Estimates Presentation and information contained in it is being provided for information purposes only. To the ex

  3. Slide 3: Disclaimer – Reserve Estimate and Competent Persons Statement

    Company Update | November 2026 Disclaimer Additional information about Reserve Estimate Competent Persons Statement - Reserves The 2P (Proved plus Probable) Gas Reserves for the Rolleston West Project (State Gas 100%) have been rsonal use only independently certified as at 20 November 2025. The Rese

  4. Slide 4: Explorer > Developer > Producer

    Company Update | November 2026 1. Explorer > Developer > Producer Gas - Demand led fundamentals rsonal use only Industrial electrification Structural shift in global East Coast remains Diesel fuel supply chain at scale is still a long way LNG demand and LNG structurally short of gas risks now a grea

  5. Slide 5: Strategically Well Positioned Portfolio

    Company Update | November 2026 2. Strategically Well Positioned Portfolio • 2630 km2 of combined acreage • Maiden 30PJ^ 2P Reserve for Rolleston West Project rsonal use only • 3P expansion zone with a further 14PJ^ of high potential • 505PJ^ of 2C resource, targeting the highly prospective Bandanna

  6. Slide 6: 2P Reserve + Substantial Expansion Potential

    Company Update | November 2026 3. 2P reserve + Substantial Expansion Potential Rolleston West – Maiden 2P Reserve • Maiden 2P gas reserve of 30.2 PJ^ independently certified for the Rolleston West Project rsonal use only Gross Reserves (PJ’s Net to State Gas) Year last Asset Acreage amended (km2) 1P

  7. Slide 7: Rolleston West – An Expandable Low Cost CSG Project

    Company Update | November 2026 4.1 Rolleston West – An Expandable Low Cost CSG Project Rolleston • West The Rolleston West Project (ATP 2062) 100% owned by State Gas Limited Project Location • The tenement is located in the Southern Bowen Basin, in close proximity to rsonal use only ROUGEMONT-3 othe

  8. Slide 8: Rolleston West – Current Project Status

    Company Update | November 2026 4.2 Rolleston West – Current Project Status • 1 dual lateral well system (Rougemont 3) • 4 vertical wells (Rougemont 1, 2, 5 and 6) rsonal use only • Stage 1 development plan 10TJ/day – 10 year life pipeline supported gas project, with no domestic restrictions • Multip

  9. Slide 9: Scale of Diesel Fuel Displacement Opportunity

    Company Update | November 2026 5. Scale of Diesel Fuel Displacement Opportunity +$30 Bn of diesel sales rsonal use only Total Addressable Diesel Fuel Domestic Market TAM First customer • Total diesel consumption conservatively 30 billion litres per annum, at $1.40/L net of • All sources of diesell f

  10. Slide 10: Adjacent - Tight and Conventional Gas Opportunities

    Company Update | November 2026 6. Adjacent - Tight and Conventional Gas Opportunities • The Reid’s Dome Gas Project (PL 231) is within the Bowen Basin on the apex of the Springsure-Serocold Anticline and immediately adjacent to ATP 2062 rsonal use only • 15 wells have been drilled in PL-231 • Severa

  11. Slide 11: Substantial Expansion Potential to the South

    Company Update | November 2026 7. Substantial Expansion Potential to the South • State Gas 35%, Santos 65% & Operator rsonal use only • Large area 727 km2 • Bandanna Formation CSG with likely deeper tight gas targets • Net coal demonstrated by Consuelo stratigraphic holes, Rougemont and Rewan-1 • Ga

  12. Slide 12: Work Plan

    Company Update | November 2026 8. Work Plan Rolleston West – Pipeline Supported Gas Project Note – refers to calendar halves rsonal use only Field Development, Final Financial close Infrastructure and studies process Field development Evaluate financing Environmental and plant • Optimise final desig