Dlp Resources, Inc. · TSXV:DLP
Dlp Resources — Investor Presentation (May 2025)
26 slides from Dlp Resources's investor presentation, May 2025
Slide 1: Discovering the next Copper–Molybdenum Porphyry Giant in Southwestern Peru
Investor Presentation Maiden Resource Update Discovering the next Copper–Molybdenum Porphyry Giant in Southwestern Peru https://dlpresourcesinc.com/ dlpresourcesinc.com TSXV: DLP / OTCQB: DLPRF 2025
Slide 2: Cautionary Note Regarding Forward Looking Statements
Cautionary Note Regarding Forward Looking Statements Certain information contained in this document may be forward-looking statements or forward-looking information (referred to as “forward-looking statements”). Forward-looking statements are often, but not always, identified by the use of words suc
Slide 3: Summary of key aspects of DLP's AURORA Project
Summary of key aspects of DLP’s AURORA Project Looking SW, the 3200 m > Rare and large polymetallic discovery (initial Resource Porphyry domains elev. ~40% copper and 60% Moly) located in Southwestern, Peru and scale of the Aurora Deposit > Maiden Resource of over 1 Billion tonnes of Inferred Resour
Slide 4: AURORA Location
AURORA AURORA Location CUSCO VENEZUELA COLOMBIA ECUADOR ESPERANZA MOLLENDO AURORA Parobamba, Peru (60 km north of Cusco) PERU Port ~750km Road access via Power to Parobamba SOUTH AMERICA full-service roads (edge of property) BOLIVIA BRAZIL 12,100 Ha (100% DLP) 3,000 – 2,000m + 400 Ha (option) elevat
Slide 5: AURORA Cu–Mo–Ag Porphyry Project
AURORA Cu–Mo–Ag Porphyry Project AURORA Toromocho PERU Targeting Copper–Molybdenum Porphyry Giant in the Central Andes N CA Y DE FLEC T IO N ABA Las Bambas LO C AT I O N 12,100 Ha - 100% DLP > In the under explored Miocene–Pliocene Porphyry belt 400 Ha - Option 5km in proximity to some of the world’
Slide 6: AURORA History
AURORA History 2001 2005 2012 – 2015 2022 – 2023 2024 – 2025 6 Shallow Holes 7 Shallow Holes Ian Gendall Project Permit for 30 drill sites Re-started drilling Q2 Review with Focus Bear Creek Vena Resources Ventures 13 Holes (9,900 m) Completed 10 holes – 8,395m (D. Lowell) DLP Resources of drilling
Slide 7: 100% Earn-In Agreement
AURORA 100% Earn-In Agreement 4-Year Term US$ 3M Cash Paid US$325,000 US$ 3M Work Completed 1.5% NSR; US$1.5M buyout M AY 2 0 2 1 YEAR 1: 2023 YEAR 2: 2024 YEAR 3: 2025 YEAR 4: 2026 Signed Agreement US$ 150,000 Cash US$ 175,000 Cash US$ 275,000 Cash US$ 2,325,000 Cash (Private Peruvian Group) US$ 40
Slide 8: Significant Drill Intercepts
AURORA Significant Drill Intercepts 189000 189500 190000 190500 8566500 702.3m @ 0.58% CuEq OPEN 125m @ 0.63% CuEq 7 -01 221.1m @ 0.75% CuEq A24 DLPA-02 03 2-0 DLPA-10 221.4m @ 1.38% CuEq A2 123.35m @ 0.51% CuEq A2 3- 03 A- 0 A2 04 DD 01 3- 617.5m @ 0.94% CuEq 2-0 0 A2 ABC-6 05 3- A2 00 48m @ 0.58%
Slide 9: Resource Highlights
AURORA Resource Highlights* Cut-off Resource Tonnage CuEq Cu Mo Ag Cu metal Mo metal Ag metal (NSR) Category (Mt) (%) (%) (%) (g/t) (Mlb) (Mlb) (Moz) $5.75 Inferred 1,050 0.44 0.20 0.05 2.4 4,650 1,110 80 Summary Looking south-west > Based on 18,383 meters of drilling done by DLP > The mineral resou
Slide 10: Resource Orthogonal View Looking N-E
AURORA Resource Orthogonal View Looking N-E N Bloc k Mo del Sec tion S Source: AMC leapfrog model with section lines added by DLP TSXV: DLP / OTCQB: DLPRF 10/19
Slide 11: Block model section S-N
AURORA Block model section S-N Cut-off Resource Tonnage CuEq Cu Mo Ag Cu metal Mo metal Ag metal (NSR) Category (Mt) (%) (%) (%) (g/t) (Mlb) (Mlb) (Moz) $5.75 Inferred 1,050 0.44 0.20 0.05 2.4 4,650 1,110 80 Summary cont. > 1.05 Billion tonne Inferred Maiden Resource @ 0.44% CuEq (0.20% Cu, 0.05% Mo
Slide 12: Section Looking N-E
AURORA Section 5 Looking N-E Lithology Geology Copper Cu % NW SE Breccias NW SE 0.6 Cover 0.5 Cu Porphyry Pit Pit 0.4 Deep Porphyry 0.3 Hornfels 0.2 Mo Porphyry Supergene Aurora Copper model looking north-east Aurora lithological model looking north-east Mo ppm Moly Silver Ag_ppm NW SE NW SE 5 5000
Slide 13: Community First Parobamba
AURORA Community First Parobamba Community Agreement DLP employs 20-26 Over 160 people were 90% of workers Invested ~US$450,000 in in place to 2026 people on a rotation employed on last drill from Parobamba Community employment, projects basis program and initiatives (2022-2024) DLP-Parobamba Commun
Slide 14: Next Steps
AURORA Next Steps 189000 189500 190000 190500 8566500 702.3m @ 0.58% CuEq RIG1 OPEN 125m @ 0.63% CuEq 7 9 -01 221.1m @ 0.75% CuEq A24 DLPA-02 12 03 2-0 DLPA-10 221.4m @ 1.38% CuEq A2 123.35m @ 0.51% CuEq A2 3- ABC-6 03 A- 0 A2 04 DD 01 3- 617.5m @ 0.94% CuEq 2-0 0 A2 05 3- A2 00 48m @ 0.58% CuEq 6 D
Slide 15: Comparison to Other Large Copper and Moly Deposits
AURORA Comparison to Other Large Copper and Moly Deposits Mo Uses Global Mo Reserve Base, 2023 Aurora, uniquely positioned between pure Moly deposits (China and Chile copper deposits with by-product moly) Other 2,366,000 mt Chemicals 13% Stainless Steels 25% 1 Foundries 8% China Chile 5,800,000 mt 1
Slide 16: Capital Structure
Capital Structure 60 % 8% Retail Institutions Shares (issued) 127,244,071 Warrants 40,310,412 Options 4,556,855 RSUs 2,660,119 PSUs 314,000 DSUs 3,266,795 32 % Founders / BoD Shares (FD) 178,352,252 Market Cap (C$M) $55 Cash (C$) 930,000 As of March 2025 R E S E A R C H A N A LY S T C O V E R A G E
Slide 17: Summary of DLP & AURORA Project
Summary of DLP & AURORA Project Rare & Large 1 Billion tonnes Compelling Next Deposit Inferred resources Valuation Steps Located underexplored Recently completed maiden Valuated at 0.005 cents/lb Advance 10,000 m of drilling Porphyry Belt in Peru 43-101 by AMC in ground in 2025 for ~ US $ 5 M Large
Slide 18: Highly Experienced Team
Highly Experienced Team LEADERSHIP TEAM Ian Gendall Derek White Scott Davis Robin Sudo CEO & President Chairman CFO Office & Land Mgr. / Corp. Secretary Credited with discovery of Ecuadorian Over 35 years of international experience in the Experience working with public junior Previously worked for
Slide 19: Thank You
THANK YOU C O N TAC T Ian Gendall – CEO & President iangendall@dlpresourcesinc.com Tel: +1 604 897 7436 dlpresourcesinc.com https://dlpresourcesinc.com/ TSXV: DLP / OTCQB: DLPRF
Slide 20: Appendices
Appendices
Slide 21: Mineral Inferred Resources (NI 43-101 Compliant)
AURORA Mineral Inferred Resources (NI 43-101 Compliant) Cut-off Resource Tonnage CuEq Cu Mo Ag Cu metal Mo metal Ag metal (NSR) Category (Mt) (%) (%) (%) (g/t) (Mlb) (Mlb) (Moz) $5.75 Inferred 1,050 0.44 0.20 0.05 2.4 4,650 1,110 80 Note: there is no guarantee that additional exploration will advanc
Slide 22: Notes on Copper Equivalent (CuEq) Calculations
AURORA Notes on Copper Equivalent (CuEq*) Calculations – DLP Press Release Notes * Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut and core recovery is assumed to be 100% for the entire drilled lengths. The project is at an early stage of exploration
Slide 23: Resource Highlights – Model by copper equivalent (%)
AURORA Resource Highlights – Model by copper equivalent (%) Looking Looking North CuEq% CuEq% South Floor – 0.25 Floor – 0.25 0.25 – 0.50 0.25 – 0.50 0.50 – 0.75 0.50 – 0.75 0.75 – 1.00 0.75 – 1.00 1.00 – Ceiling 1.00 – Ceiling Looking Looking East CuEq% CuEq% West Floor – 0.25 Floor – 0.25 0.25 – 0
Slide 24: Economic Cutoff and Related Sensitivities
AURORA Economic Cutoff* and Related Sensitivities The Mineral Resource is relatively insensitive to cut-off grade. Cut-off Resource Tonnage CuEq Cu Mo Ag Cu metal Mo metal Ag metal (NSR) Category (Mt) (%) (%) (%) (g/t) (Mlb) (Mlb) (Moz) Increasing the economic cutoff by USD $1.00/ t has $5.75/t Infe
Slide 25: Budget for Next Step Drilling
AURORA Budget for Next Step Drilling Quantity Unit Price Total (US$) Expenses Aurora Project Drilling (Meters) 10,000 250 2,500,000.00 Labs 5,500 35 192,500.00 Specific Gravity 40 5 2,000.00 Surveys 12 7,000 84,000.00 Wedging_orinetation 5 10,000 50,000.00 Camp Costs 300,000.00 Vehicles (2) 12 4,500
Slide 26: ESPERANZA Cu–Mo Project
ESPERANZA Cu–Mo Project 225,000 250,000 275,000 8,150,000 Other Hudbay Peru SAC Minera Pampa de Cobre Other Vale Exploration Rio Tinto Minera Antares E.C. Ecolchup > The new grassroots 4,600 Ha Esperanza Cu-Mo project (red) is Other Other Other located ~35 km SW of the Cerro Verde Mine in Arequipa 8