Camino Minerals Corporation · TSXV:COR
Camino Minerals — Investor Presentation (October 2011)
27 slides from Camino Minerals's investor presentation, Oct 19, 2011
Slide 1: Camino Minerals Corporate Presentation
CAMINO MINERALS COR: TSX-V October 19, 2011
Slide 2: Cautionary Notes
CAUTIONARY NOTES Cautionary Note Regarding Forward-Looking Statements Statements contained in this presentation that are not historical fact are forward-looking statements as that term is defined in the Private Securities Litigation Reform Act of 1995 and forward-looking information under the provis
Slide 3: Overview
OVERVIEW • Formed in connection with Goldcorp Inc.’s C$300-million acquisition of Canplats Resources Corp. (transaction closed in February, 2010) • Canplats shareholders received, for each Canplats common share, C$4.60 in cash and 1 share of Camino Minerals Corp. • Proven management team: led by Can
Slide 4: Share Structure
SHARE STRUCTURE Trading symbol: COR on the TSX-V Date shares listed: April 22, 2010 Issued & outstanding: 64,265,432 Fully diluted: 68,165,432 Management owned (FD): 12% Avg. daily vol. (3 months): 61,594 52-week high/low: $0.70/$0.12 Market capitalization: C$12.5 million approx. Cash position: C$4.
Slide 5: Camino's Stock Chart
CAMIN MINERALS CAMINO MINERALS CORPORATION MCORV © Yahoo! Nov 10 Jan 11 Mar 11 May 11 Jul 14 Sep 11 = Volume wuol la Walia dan ula ull Nas Lalla « bacco
Slide 6: Canplats' Camino Rojo Discovery
CANPLATS’ CAMINO ROJO DISCOVERY Bud Hillemeyer, left, and Perry Durning(i) at Camino Rojo Gordon Davis, Camino’s CEO and Chairman Discovered in 2007, Canplats outlined 3,445,000 ounces gold in measured and indicated resources with additional inferred resources of 555,000 ounces gold in little over a
Slide 7: Canplats History
CAMIN MINERALS Goldcorp Outbids Penmont | Penmont Makes Offer Canplats Delists Further Drill Results Goldcorp Makes Offer e 3 1S) a & a c 2 £ £ < 2 = @ a S 2 a © [S) - o x < w = Camino Minerals
Slide 8: Management and BOD
MANAGEMENT AND BOD R.E. Gordon Davis, P.Eng. Chairman & CEO & Director Peter de Visser, B.Comm., C.A. CFO Richard Dufresne, P.Geo. VP, Exploration Blaine A. Monaghan, B.A. VP, Corp. Dev. & Corp. Sec. Francois Gaboury, B.Sc. Chief Geologist James W. Tutton, B.Comm. Director David Watkins, M.Sc. Direc
Slide 9: Camino's Projects
CAMINO’S PROJECTS CAMINO MINERALS > : =~ Maijoma ) /LEI Alamo $ Torreon Sattillo\\ + Monterey | L aes i
Slide 10: Central Mexican Silver Belt
CENTRAL MEXICAN SILVER BELT 10
Slide 11: Rodeo Gold-Silver Project
RODEO GOLD-SILVER PROJECT • Over 13,099 hectares (51 sq. miles) in size and located 150 kilometres north of Durango, accessed by paved highway • Rodeo hosts gold and silver mineralization related to a low sulfidation epithermal system • Past drilling by Canplats tested just 600 metres of the 5-kilom
Slide 12: Rodeo Gold-Silver Project
RODEO GOLD-SILVER PROJECT • 5-km long epithermal system • From 2004-2007 Canplats drilled a total of 3,449 metres in 25 holes • Just 600 metres of strike length tested with only two holes exceeding 200 metres in depth • Camino recently completed a 29- hole, 6,200 metre diamond drill program that tes
Slide 13: Drill Plan
DRILL PLAN Significant gold and silver assay results received to date From To Width Hole (metre) (metre) (metre) Au g/t Ag g/t RO-11-001 6.6 213.9 207.3 1.06 12.94 including 6.6 37.8 31.2 5.99 7.94 including 55.8 123.3 67.5 0.20 21.70 including 199.8 213.9 14.1 0.28 23.10 RO-11-005 22.6 75 52.4 0.25
Slide 14: Drilling Complete
DRILLING COMPLETE CAMINO MINERALS ; . re , : y
Slide 15: Core Shack
ee <..... MINERALS
Slide 16: Central Mexican Silver Belt - Mecatona Gold-Silver Project
CENTRAL MEXICAN SILVER BELT - MECATONA GOLD-SILVER PROJECT 16
Slide 17: Mecatona Gold-Silver Project
MECATONA GOLD-SILVER PROJECT • Over 5,300 hectares (20.5 sq. miles) in size and located 20 kilometres south of Parral, state of Chihuahua • Favourable geology in an area of historic production • Initial work identified broad vein swarm and an alteration corridor associated with highly anomalous gold
Slide 18: Mecatona Gold-Silver Project
MECATONA GOLD-SILVER PROJECT 18
Slide 19: Mecatona Gold-Silver Project
MECATONA GOLD-SILVER PROJECT 19
Slide 20: Maijoma Claim Group
MAIJOMA CLAIM GROUP CAMINO MINERALS > : =~ Maijoma ) /LEI Alamo $ Torreon Sattillo\\ + Monterey | L aes i
Slide 21: Maijoma Claim Group
MAIJOMA CLAIM GROUP • Located in northern Chihuahua and comprised of several contiguous claims, totaling 83,985 hectares (324 sq. miles) • New discoveries associated with regional-scale fault structures • Large areas of hydrothermal alteration, locally associated with elevated base and precious meta
Slide 22: Maijoma Claim Group
MINERALS Prasidio \ | a J / ~. MALNJOMA CLAIM GROUP Santa Eulalia 50 million tonnes 350g/t Ag 8.2% Pb 7.8% Zn ri / / / id \ \ \ iy \ | | | i} | / / =e primary road iy CHIHUAHUA STATE u COAHUILA -——— secondary road © town \ [i Major deposit, producer \ or past producer ® 50 km
Slide 23: Maijoma Claim Group
CAMIN MINERALS as Agua El f de la Loca/77 Papalote | u— Los Volcanes ¢ SEI Bosque} f Cenizo e, _ — a : kilometres
Slide 24: Los Volcanes IP Survey
MINERALS OS VOLCANES Induced Polarization Anomalies Chihuahua, Mexico 6 September 2011
Slide 25: Maijoma Claim Group
MAIJOMA CLAIM GROUP Perry Durning and Bud Hillemeyer at El Alamo claim 25
Slide 26: Overview
OVERVIEW • Formed in connection with Goldcorp Inc.’s C$300-million acquisition of Canplats Resources Corp. (transaction closed in February, 2010) • Canplats shareholders received, for each Canplats common share, C$4.60 in cash and 1 share of Camino Minerals Corp. • Proven management team: led by Can
Slide 27: Contact Information
CONTACT INFORMATION Camino Minerals Corporation: 1510-999 West Hastings Street Vancouver, BC, V6C 2W2 Phone: 604-683-8218 Toll Free: 866-338-0047 E-mail: info@caminominerals.com Web: www.caminominerals.com 27
Camino Minerals — Investor Presentation (October 2011) on 6ix