Killi Resources Limited · ASX:KLI
Killi Resources — CG Australia Noosa Conference November 2026
21 slides from Killi Resources's conference presentation, Nov 11, 2026

Slide 1: Lodestone Iron Ore Project
rsonal use only ASX | KLI Lodestone Iron Ore Project LOCATION & INFRASTRUCTURE Western Australia home of Iron Ore GRADE High purity concentrate 68 - 70% Fe (DTR) SCALE 25km of iron ore mineralization TEAM Industry leading team with exceptional track record

Slide 2: Disclaimers
Disclaimers The Company believes that it has a reasonable basis for making the forward-looking statements in this presentation based on the This presentation has been prepared by Killi Resources Limited (ACN 647 322 790) (“Killi” or "Company") and its subsidiaries. The information contained herein a

Slide 3: Team with Proven Track Record
TEAM WITH PROVEN TRACK RECORD rsonal use only Neville Power Hamish Halliday Steve Parsons Michael Naylor Dr Stuart Owen Chairman Managing Director Founder Consultant Major Shareholder Major Shareholder Major Shareholder Major Shareholder Chief Geologist • From 2011 to 2018, Mr Power was • Geologist

Slide 4: Exceptional Location
EXCEPTIONAL LOCATION THE LODESTONE COMPETITIVE ADVANTAGE rsonal use only Heart of the Mid West - Immediately adjacent to the worlds largest steel producers (ANSTEEL and Baowu Steel) Existing road network ≈200km to the Port of Geraldton Existing rail network to the Port of Geraldton Existing 132kV po

Slide 5: Leverage to Midwest (WA) Infrastructure
LEVERAGE TO MIDWEST (WA) INFRASTRUCTURE THE LODESTONE COMPETITIVE ADVANTAGE rsonal use only Infrastructure Underutilised Port Road Rail Port of Geraldton 2030 Plan ASX KLI 5

Slide 6: Unique Magnetite Deposit
UNIQUE MAGNETITE DEPOSIT Geological setting results in the rsonal use only development of coarse recrystallised magnetite 10x to 100x 25kms coarser than typical deposits “Surrounding granites have fully recrystallised the Lodestone magnetite body over 25km of Metasomatic strike ” Recrystallization S

Slide 7: A Standout Premium High-Value Product
A STANDOUT PREMIUM HIGH - VALUE PRODUCT COMPARED TO OTHER AUSTRALIAN PEERS CONCENTRATE GRADE VS GRIND SIZE rsonal use only 180 Lodestone Iron Coarse Grained Nature Drives Value 160 140 Allows for a simple circuit design 120 Substantial savings in operating costs Grind Size (microns) 100 Potential fo

Slide 8: Simple Low-Cost Flow Sheet
SIMPLE LOW - COST FLOW SHEET Lodestone Preliminary Flowsheet Design Typical WA Magnetite Flowsheet rsonal use only Primary Crush Primary Crush Secondary Crush Secondary Crush Ball Mill (coarse grind size) High Pressure Grind (HPGR) Rougher + Cleaner Mag Sep Rougher Mag Sep Concentrate (69% Fe) 2 Bal

Slide 9: Maiden JORC Resource
MAIDEN JORC RESOURCE 110mt @ 33% Mass Recovery – for 69% Fe concentrate 1 rsonal use only Broad zones of mineralization from surface (30m - 60m true width) Opportunity for Immediate step out- growth drilling Commencement of 20,000m RC program Multiple resource upgrades anticipated over the next 12 m

Slide 10: Substantial Resource Growth Planned
SUBSTANTIAL RESOURCE GROWTH PLANNED rsonal use only Northern Zone Current JORC Resource Resource Growth 110Mt @ 33% MR – 69% Fe Current resource covers less than Central Zone 20% of identified mineralization Resource Growth Drilling to target additional 20km of crystalline magnetite Southern Zone Pa

Slide 11: 600m Step Out Hole Hits 50m Wide Zone
600m STEP OUT HOLE HITS 50m WIDE ZONE rsonal use only First Step Out Hole hits 50m wide zone Coarse grained massive magnetite over entire intersection DTR’s and assay pending ASX KLI 11

Slide 12: High-Resolution Magnetics Resource Growth
High - Resolution Magnetics Resource Growth Original Magnetics High - Res Magnetics rsonal use only MULTIPLE PARALLEL TARGETS Current 110Mt @ Current 110Mt @ IDENTIFIED 33% MR – 69% Fe 33% MR – 69% Fe Resource Resource Surface projection of current expression Target BIF horizons Lodestone tenements

Slide 13: Why Target DR Grade & Electric Arc Furnace Steel Production
WHY TARGET DR GRADE & ELECTRIC ARC FURNACE STEEL PRODUCTION Direct Reduction (DR) pallets attract a rsonal use only substantial premium ( ≈40%) over the 62% Fe Index Electric Arc Furnace (EAF) predicted to account for half of all steel production by 2050 Projects capable of producing high purity mag

Slide 14: The Global Rise of EAF Steel Production and Demand for DR Grade Feed
THE GLOBAL RISE OF EAF STEEL PRODUCTION AND DEMAND FOR DR GRADE FEED rsonal use only An additional 100mt of DR grade feed needed by 2030 Bloomberg estimates by 2035, DR - grade pellets will face a supply deficit of 67Mt S&P Global expects deficit of 70- 85Mt by 2035. Wood McKenzie estimates a supply

Slide 15: Strategically Positioned to Supply Global Market
STRATEGICALLY POSITIONED TO SUPPLY GLOBAL MARKET “High demand markets in our backyard” rsonal use only ASIA Japan South Korea China Taiwan Vietnam Malaysia Indonesia India MIDDLE EAST Saudi Arabia UAE Oman Bahrain LODESTONE IRON ORE PROJECT ASX KLI 15

Slide 16: Killi Resources Corporate Summary
KILLI RESOURCES CORPORATE SUMMARY A$0.24 ~361M ~A$86.6M A$16.4M rsonal use only Share Price Shares on Issue Market Cap Cash and Investments Shareholders 0.35 Macquarie Bank Gold Fields Limited 0.3 5% 4.3% 0.25 0.2 52% 38.7% 0.15 Other Board and Shareholders Management 0.1 Strong Cash Position, Tight

Slide 17: What's Next? Drilling and Resource Growth
WHAT’S NEXT? DRILLING AND RESOURCE GROWTH rsonal use only Aggressive infill and extensional drilling 40,000m Multiple Resource Upgrades Completion of further detailed Metallurgy Programs Fully funded through to Prefeasibility Study Management fully focused on growth and a pathway to FID ASX KLI 17

Slide 18: Lodestone Iron Ore Project Location & Infrastructure
LODESTONE IRON ORE PROJECT LOCATION & INFRASTRUCTURE rsonal use only Broome Exceptional location in the heart of the Mid - West Iron Ore District Port Hedland Karratha GRADE Newman Capable of producing high purity high value concentrate 68 - 70% Fe Based on DTR testing Carnarvon WESTERN AUSTRALIA SC

Slide 19: Contact Us
rsonal use only CONTACT US E: hamish@killi.com.au Media W: www.killi.com.au Paul Armstrong A: Level 2, 8 Richardson Street Read Corporate West Perth WA 6005 E: paul@readcorporate.com.au ASX KLIASX KLI 19

Slide 20: Appendix A Resource Estimate Summary Table
APPENDIX A RESOURCE ESTIMATE SUMMARY TABLE rsonal use only Lodestone Iron Project Inferred Resources (Fresh zone) for key elements by DTR Mass Recovery cut - offs. DTR Concentrate Lower cut - off DTR Mass Class DTR Mass Million Tonnes Recovery % Fe % SiO2 % Al2O3 % Recovery % 0 110 33 69 3.9 0.08 In

Slide 21: Appendix B: Peer Comparison Support
APPENDIX B: PEER COMPARISON SUPPORT Concentrate Project Company Grind Size Grade Reference rsonal use only Grade derived from resource model & Grind size from DTR Lodestone Iron Killi Resources 150 microns 69% Fe composites AusIMM - Fine Grinding Circuit Process Improvement at the Karara Mine Concen
Source: ASX announcement, Nov 11, 2026
More decks from Killi Resources Limited
RRS Gold Coast Conference September 202619 slides · Sep 10, 2026
Investor Presentation (July 2026)17 slides · Jul 23, 2026
Merger or Acquisition (June 2026)22 slides · Jun 11, 2026
Investor Presentation (June 2025)20 slides · Jun 25, 2025
Shareholder Meeting (November 2024)16 slides · Nov 22, 2024
Shareholder Meeting (November 2024)15 slides · Nov 21, 2024