BlackPearl Resources — Investor Presentation (April 2010)
32 slides from BlackPearl Resources's investor presentation, April 2010

Slide 1: Heavy Oil Gems
Heavy Oil TSX:PXX April 2010 Update Gems www.blackpearlresources.ca 1

Slide 2: Introduction
Introduction Corporate: Symbol: PXX, PXXS Exchanges: TSX, OMX Shareholder Distribution Shares Outstanding (MM): Basic 261.9 Fully Diluted(options & warrants) 285.4 Institutional Retail Current Share Price ($/share):* 2.45 37% 25% Market Capitalization ($MM): 642 Management ownership 7.5%/13% Mgmt Fi

Slide 3: Business Plan
Business Plan Our focus is heavy oil Three core properties within the Company to provide near, mid and longer term production growth (ultimate potential of 50,000 bopd) Sell non‐core properties Maintain a healthy balance sheet to provide financial flexibility Production Profile (bopd) Today 6,000 2

Slide 4: Core Areas
Core Areas Core Area Profile Core PIIP* WI Operator Technology Areas (mmbbls) Onion 250 87% PXX Conventional Lake wells 30,000 bopd SAGD 10,000 bopd Mooney 150 98% PXX Horizontal 15,000 bopd wells ASP flood Blackrod 1,000 100% PXX SAGD Our three core areas have common characteristics: lots of oil in

Slide 5: Onion Lake
Onion Lake General Characteristics 11° API oil 17,000 acres; 10.1 mm 2P Reserves Primary development provides near and midterm growth Thermal (SAGD) provides longer term growth 250 risked locations, Sproule recognizes 123 locations Capex $500K/well; IP ~ 50 bopd Thermal recovery targeting 60 - 70% o

Slide 6: Onion Lake
Onion Lake 2009 Accomplishments Drilled 28 primary heavy oil wells Completed successful two-well CSS steam pilot Developed a conceptual SAGD development plan 2010 Plans Drill 50 primary heavy oil wells Upgrade fuel gas system and water disposal facilities Continue developing SAGD thermal plans Total

Slide 7: Onion Lake – Primary Economics
Onion Lake – Primary Economics + Per barrel economics ($/bbl) : Wellhead price $ 65.00 Onion Lake primary Royalties Operating costs & Transportation 17.00 15.00 economics compares Netback Capital costs $ $ 33.00 8.00 favourably to other oil Recycle ratio 4.1 plays *Source: Peter's & Co. Limited + b

Slide 8: Mooney Project
Mooney Project General Characteristics 16° API oil 46,000 net acres; 8.7 mm 2P reserves Current production of ~1,200 Boe/d, potential to be 5,000 – 10,000 Boe/d Gross PIIP – 150 MMboe ~50 conventional development locations Growth will come from an ASP (alkali, surfactant, polymer) flood 8

Slide 9: Mooney ASP Flood
Mooney ASP Flood Potential to significantly increase oil recovery rates Alkali and surfactant acts as a detergent to wash more oil from the rock Polymer thickens the water to improve the ability to sweep oil to the wellbore Potential Recovery Rates Primary 3-5% Waterflood ~7% ASP Flood 20-30% 9

Slide 10: Mooney Polymer Pilot
100/09-17-072-07W5M ——— Oil Production (bpd) Water/Polymer Injection (bpd) awe Say Injection J MV AK, Start Nov 08 Tu N A > ea Peak Polymer Flood Peak Initial Prod Rate 180 bopd | |Rate 125 bopd A 15% A “A MN A |_| Sump Recovery Change 0 1 T T 1-Jun-08 9-Sep-08 18-Dec-08 28-Mar-09 6-Jul-09 14-Oct-09

Slide 11: Mooney Project
Mooney Project 2009 Activities Achieved an oil recovery rate in excess of 15% from the pilot polymer flood Initiated third party lab work to establish the appropriate type and quality of polymer to use 2010 Plans Finalize optimal mix of alkali, surfactant and polymer in preparation for commercial in

Slide 12: Blackrod SAGD Project
Blackrod SAGD Project General Characteristics Located in the Athabasca Oil Sands 100% working interest Over 1 billion gross bbls PIIP Potential of 30,000 – 40,000 bbls/d Lower Grand Rapids (9° API oil) Depth of 300 metres Planning a SAGD pilot for 2010/11 12

Slide 13: Blackrod SAGD Project
Blackrod SAGD Project R18W4 24.0 14.0 26.0 2009 Activities 6.0 28.0 Filed regulatory application for SAGD pilot 8.0 7.0 Drilled 10 strat wells to confirm areal extent of the 23.0 reservoir 19.0 Completed steam generator and began construction 9.0 22.0 21.0 25.0 on 31 km all-weather road 27.0 2010 Pl

Slide 14: Blackrod – Preliminary Economics
Blackrod – Preliminary Economics Per BBL Highlights Wellhead price $ 55.00 Royalties $ 11.00 Recycle ratio of ~3.4 Operating costs $ 10.00 Gas costs $ 10.00 ~US$60 WTI required for a Netback $ 24.00 15% ROR Capital $ 7.00 Cash Flow Profile (10,000 bopd) 1,000 800 600 Payout in 5-6 yrs Cdn$ MM 400 As

Slide 15: Development Timetable
Development Timetable 2010 2011 2012 2013 2014 2015 2016 2017 Mooney ASP Flood Pilot Pilot Project Phase 1,existing wells 3,500 bopd Phase 2, pool extension 4,500 bopd Onion Lake Primary wells 200+ wells, 10,000 bopd Thermal, SAGD 10,000 bopd Blackrod SAGD Pilot 500 bopd Phase 1 commercial 10,000 bo

Slide 16: The BlackRock Story
The BlackRock Story 25 20,000 1000 $25 20 16,000 800 $20 Share Price ($/share) Production (boe/d) Reserves (mbbls) CF Multiple 15 12,000 600 $15 10 8,000 400 $10 5 4,000 200 $5 0 0 0 $0 2001 2002 2003 2004 2005 2006 Production (boe/d) Reserves (mbbls) CF Multiple Share Price ($/share) 16 (Prov+Prob+

Slide 17: 2009 – At a Glance
2009 – At a Glance Cash flow by Qtr 20 “Restructuring” in 2009 lead to 14.7 meaningful reductions in operating 15 costs and G&A. 10 7.9 8.2 Effects of higher activity levels and 5 improved commodity prices seen in -1.8 the last half of the year. 0 -5 Q1 Q2 Q3 Q4 Operating Costs($/boe) G&A Costs ($/b

Slide 18: Tighter Differentials
Tighter Differentials $120.00 Tighter heavy oil differentials 2009-10 15% attributed to: differentials $100.00 1) Increased heavy oil refining 1999-2008 27% avg differentials capacity $80.00 2) Increased pipeline capacity $60.00 3) Decrease in supply from Mexico and Venezuela WTI Oil Prices $40.00 C

Slide 19: 2010 Guidance
2010 Guidance 2009 Actual Production 2009A 2010E Other 29% Production: Average (boe/d)(*) 5,254 6,400 Mooney Year-end exit (boe/d) (*) 6,000 7,000-7,500 27% Investment: Capital expenditures ($mm) $28 $86 Onion Lk 44% Financial: Cash flow from operations(**) ($mm) $29 $45 Per share $0.12 $0.17 2010 E

Slide 20: 2010 Capital Program
2010 Capital Program 150 $111 million capital budget for 2010 $25 $111 mm Credit Lines Over 90% to be spent on Other $10 Asset Sales our 3 core areas 100 $21 No external financing Blackrod Acquisition $45 required $m m Estimated $23 Cash flow Blackrod 50 $29 Mooney $58 $32 Working Onion Lk Capital 0

Slide 21: 10 Year Capital Requirements
10 Year Capital Requirements 1500 $1.3 billion Cash flow will be a significant source of ~$420 capital to fund our future capital requirements ? 1000 Shortfall could be filled $750 from additional equity, Blackrod issue of some form of $m m debt instrument, sale of $780* one of the core assets or Es

Slide 22: Net Asset Value
Net Asset Value No reserve value for Blackrod Reserves**: 2P reserves, BT, discounted @10% $ 436,752 SAGD No reserve value for Onion Lake Undeveloped Land**: SAGD Canada 228,961 acres @ $100/ac $ 22,896 US 139,241 acres @ $50/ac $ 6,962 Large portion of Mooney Phase 2 Financial**: ASP flood not yet

Slide 23: Summary
Summary In Summary, BlackPearl provides: •Exposure to a large high quality resource base 30,000 bopd •Significant leverage to oil prices 10,000 bopd •Growth from development of existing 15,000 bopd properties over acquisitions •Conservative financial structure; strong balance sheet 23

Slide 24: Cautionary Statements
Cautionary Statements FORWARD-LOOKING STATEMENTS This report contains certain forward-looking statements and forward-looking information within the meaning of applicable Canadian securities legislation (collectively referred to as “forward-looking statements”). All statements other than statements o

Slide 25: Supplemental Information
Supplemental Information 25

Slide 26: Mooney Analog
Mooney Analog Reservoir Analog: CNRL’s Pelican Lake Reservoir Parameter Mooney Pelican Lake * Formation Bluesky Wabiskaw Depth 900 m 400 m Net Pay (average) 2 - 4 (2.5) m 2 - 5 (3) m Porosity, % 27% 30% Permeability 0.5 - 5 D 0.3 - 3 D Reservoir Temperature 29 C 17 C Viscosity (Res. Temp.) 150-3000

Slide 27: Mooney – Development Economics
Mooney – Development Economics Polymer Flood Phase 1 Phase 2 Development Capital Per bbl $4 – 9 $10 – 16 Operating Costs Per bbl $12 – 15 $12 – 15 Royalties Per bbl $19 $16 Total Costs Per bbl $35 – 43 $38 – 47 Recycle Ratios* 3.4 – 8.0 2.1 – 3.6 * Based on wellhead price of $65/bbl (equivalent to ~

Slide 28: Onion Lake Analog
Onion Lake Analog Reservoir Analog: CNRL’s Tangleflags Reservoir Parameter Onion Lake Tangleflags * Formation Dina Lloyd Depth 615 m 450 m Net Pay (average) 15 - 22 (18.5) m 10 - 28 (18.5) m Porosity, % 36% 34% Permeability 5 - 10 D 3-6D Viscosity 40,000 cp 15,000 cp Oil Gravity 11°API 13°API PIIP -

Slide 29: Blackrod Reservoir
Blackrod Reservoir Bottom 301.0 m Thick reservoir - varies from 18 - 26m 55% - 70% Bitumen saturation 37% Porosity 2 - 6 D Permeability 12-25-076-18W4 LOWER GRAND RAPIDS BITUMEN PAY Top 298.0 m Core 12-25-076-18W4 29

Slide 30: Blackrod Analog
Blackrod Analog Reservoir Analog: CNRL’s Wolf Lake B10 Reservoir Parameter Blackrod Wolf Lake B10 * Formation Grand Rapids Grand Rapids Depth 300 m 400 m Reservoir Thickness, m (average) 18-26 (20) 10-12 (11) Porosity, % 37% 36% Permeability 2-6D 2-3D Oil Saturation 55-70% 65-75% Viscosity 100,000-5

Slide 31: Blackrod Analog CNRL’s Wolf Lake B10
Blackrod Analog CNRL’s Wolf Lake B10 Log Comparison 1

Slide 32: Blackrod Analog CNRL’s Wolf Lake B10
Blackrod Analog CNRL’s Wolf Lake B10 32
Source: Internet Archive copy of blackpearlresources.ca
More decks from BlackPearl Resources Inc
Investor Presentation (April 2018)24 slides · April 2018
Investor Presentation (September 2017)22 slides · September 2017
Shareholder Meeting (May 2017)25 slides · May 4, 2017
Corporate Update (March 2016)22 slides · March 2016
Investor Presentation (September 2015)23 slides · September 2015
Investor Presentation (February 2015)26 slides · February 2015