  1. Slide 1: Building an Australian Copper Company: CYM Restart Study Presentation

    BUILDING AN AUSTRALIAN COPPER COMPANY CYM Restart Study Presentation March 2022 ASX: CYM 1

  2. Slide 2: Important Notices and Disclaimer

    Important Notices and Disclaimer IMPORTANT: You must read the following before continuing. This investor presentation (“Presentation”) has been prepared by Cyprium Metal s Limited (ABN 48 002 678 640) (“Cyprium” or “Company”). Summary information By reviewing or retaining these materials, or attendi

  3. Slide 3: Cautionary Statement

    Cautionary Statement IMPORTANT: You must read the following before continuing. This investor presentation (“Presentation”) has been prepared by Cyprium Metals Limited (ABN 48 002 678 640) (“Cyprium” or “Company”). • The Restart Study as referred to in this ASX announcement is intended to be used for

  4. Slide 4: Cyprium Investment Overview

    Cyprium Investment Overview Cyprium Metals – Building an Australian Copper Company ASX listed, West Australian focused copper developer and explorer Restart Study for Nifty Copper Project - heap leach operation targeting H1 2023 commissioning Portfolio of development opportunities with over +1.2Mt1

  5. Slide 5: Corporate Overview

    Corporate Overview Focused on building a mid-tier Australian copper mining business • Cyprium Metals (ASX:CYM) is an Australian copper developer and explorer • Owns a portfolio of near-term development projects focussed in Western Australia • Focussed on the near-term development of Nifty open pit h

  6. Slide 6: Nifty Copper Project Restart Study Summary

    Nifty Copper Project Restart Study Summary Restart Study – 25,000 tpa copper cathode operation including heap leach retreat and oxide open pit All amounts in AUD unless otherwise stated • 146,100 tonnes copper plate produced during Phase 1 oxide pit 6.3 year life • Free cashflow of $544M • C1 Costs

  7. Slide 7: Oxide Open Pit

    Oxide Open Pit Optimised Final Design Shell 7

  8. Slide 8: Oxide Open Pit with Conceptual LOM

    Oxide Open Pit with Conceptual LOM Oxide Open Pit Stages of Mining within conceptual LOM Pit • Commenced LOM study • Advancing design optimisation and metallurgy • Sulphide resource1 33.9Mt at 1.8% copper • Sulphide metallurgical work has commenced • Long life open pit operation potential of +20 yea

  9. Slide 9: Open Pit Physicals

    Open Pit Physicals3,4 Restart Study – 25,000 tpa copper cathode operation including heap leach retreat and oxide open pit All amounts in AUD unless otherwise stated • Ore mined 8.8Mt at 0.87% copper • Total waste mined 52.9 Mt for a strip ratio of 6.0 to 1 • Recovery at 90% • Reagent consumption red

  10. Slide 10: Retreat Physicals

    Retreat Physicals3 Restart Study – 25,000 tpa copper cathode operation including heap leach retreat and oxide open pit All amounts in AUD unless otherwise stated • 17Mt retreated at a grade of 0.53% • Recoveries of 85% • Agglomeration demonstrates good permeability in residues following leach • Opti

  11. Slide 11: Key Project Metrics

    Key Project Metrics Planned Restart Project Layout • Pre-production capital of $149M • Maximum cash drawdown $193M • Positive engagement with Financiers now accessing final study and extensive data room • Operating cashflows of $823M • Free Cash Flows of $544M • NPV (7%) of $277M • IRR (after tax) o

  12. Slide 12: Sensitivities

    Sensitivities Restart Study – 25,000 tpa copper cathode operation including heap leach retreat and oxide open pit All amounts in AUD unless otherwise stated Sensitivities Base Case Sensitivity Cash Flow1 NPV2 IRR2 Cu Price AUD195m +12% USD9,000/t USD1,000 AUD101m Cu Price USD10,000/t AUD1,947m AUD37

  13. Slide 13: Environmental Approvals

    Environmental Approvals Amended Approvals for Restart completed and submitted • Government Approvals Lodged • State Agreement Amended Proposal to be lodged Submission Permit / Item Legislation Department Desription Date Lodged Status Department of Water & Works Approval and Licence Amended Prescribe

  14. Slide 14: Opportunities

    Opportunities Assays from 2021 drilling not included in current Mineral Resource Estimate • Update Mineral Resource due H1 2022 • Conversion of inferred resource within the pit envelope • Drill results in the South West and South East of the current pit5 • Metallurgical optimisation of reagents • Op

  15. Slide 15: Nifty Project Timeline

    Nifty | Project Timeline • Complete Restart Study • Commissioning • Submit Approvals • Open Pit mining underway • Continue Finance Process • Ore stacking underway • Mineral Resource Update • Sulphide metallurgy underway H2 2022 H2 2023 H1 2022 H1 2023 • Finance drawdown • Copper cathode production •

  16. Slide 16: Appendices

    APPENDICES APPENDICES 16

  17. Slide 17: Board and Management

    Board and Management A strong management team with experience in technically assessing, financing, building and operating successful copper mines Gary Comb Barry Cahill Nicholas Rowley Wayne Apted Peter van Luyt Non-Executive Chairman Managing Director Non-Executive Director CFO & Company Secretary

  18. Slide 18: Nifty Copper Mine

    Nifty Copper Mine Cyprium is focused on a near-term heap leach production strategy • Substantial Oxide and Sulphide Mineral Resource of over 732,000 tonnes of copper1 which remains open • Discovered by WMC in 1981 with open pit and heap leach operation exploiting oxides commencing in 1993 • Since co

  19. Slide 19: Cyprium Working to the Strategy

    Cyprium | Working to the Strategy Cyprium has completed the ground work to build a mid tier copper company • Nifty progressing at an accelerated rate to production  Restart Study completed  Finance process underway  Government Approval documents lodged  Finance then construct then operate to pro

  20. Slide 20: Murchison Copper Project

    Murchison Copper Project Hollandaire and Nanadie Well are complementary deposits that comprise the Murchison Copper Project • Murchison Copper Project is a resource development opportunity • Continued drilling success at Nanadie Well will form part of a Maiden JORC 2012 Mineral Resource Estimate, wh

  21. Slide 21: Maroochydore Copper Project

    Maroochydore Copper Project Potential to unlock value from a substantial copper resource • Diamond drilling completed for metallurgical testwork • Substantial shallow Oxide and Sulphide Mineral Resource of over 480,000 tonnes of copper1: − Originally discovered in 1984 − Mineralisation remains open

  22. Slide 22: Paterson Exploration Project

    Paterson Exploration Project Premier exploration destination in Australia - Cyprium leveraged to exploration success via Joint Venture with IGO • Exploration season has commenced, IGO Ltd (ASX: IGO) are completing; • Large regional soil sampling program • Air-core drilling of priority targets − Larg

  23. Slide 23: Mineral Resource Estimate / Competent Persons Statement

    Mineral Resource Estimate /Competent Persons Statement HOLLANDAIRE - 2012 JORC MINERAL RESOURCE ESTIMATE 1 NIFTY COPPER OPERATION - MINERAL RESOURCE ESTIMATE AT NOVEMBER 2021 2 Resource Ore Cut-Off Measured Indicated Inferred Total Material type Volume Tonnes Cu % Cu Tonnes Au g/t Au Ounces Ag g/t A

  24. Slide 24: Cyprium Metals Limited contact details

    Cyprium Metals Limited 1 / 437 Roberts Road Subiaco WA 6008 T +61 8 6374 1550 E info@cypriummetals.com