Gemfields Group Limited · JSE:GML
Gemfields — Technical Presentation (April 2015)
47 slides from Gemfields's technical presentation, Apr 15, 2015

Slide 1: Kagem Mining a Gemfields Group Company
Kagem Mining a Gemfields Group Company 15 April 2015

Slide 2: Legal disclaimer
2 Gemfields plc 15 April 2015 Legal disclaimer This document, which has been issued by Gemfields Plc (the “Company”), comprises the This document does not and is not intended to constitute an offer of securities for written materials/slides for a presentation concerning the Company, including its bu

Slide 3: Kagem Emerald Mine
Gemfields plc 15 April 2015 Kagem Emerald Mine

Slide 4: Gemfields and The Government of Zambia
Gemfields plc 15 April 2015 Gemfields and The Government of Zambia GEMFIELDS Plc GOVERNMENT OF ZAMBIA 75% 25% THE KAGEM EMERALD MINE World’s largest Employees: 784 Location: ZAMBIA emerald mine 50% 50% THE KARIBA AMETHYST MINE World’s largest Location: ZAMBIA Employees: 166 amethyst mine

Slide 5: Kagem location in Kafubu emerald area
Gemfields plc 15 April 2015 Kagem location in Kafubu emerald area

Slide 6: Area actively mined and potential area for mining
Gemfields plc 15 April 2015 AREA ACTIVELY MINED POTENTIAL AREA FOR MINING IN FUTURE

Slide 7: The Pit — A Cross Section
7 Gemfields plc 15 April 2015 The Pit — A Cross Section High Cr, Highly basic rock, Age 1800 – 1100 million years

Slide 8: Emerald mineralisation explained
Gemfields plc 15 April 2015 Emerald mineralisation explained Zambia Stratigraphic Sequence Unusual geological and Geo chemical conditions must take place for Surface RL 1200 m Recent MUVA SERIES 1800 -1100 Ma Talc Chlorite Magnetite Schist with high Cr Age 1800 – 1100 million years Cr, V Basement Co

Slide 9: Ideal conditions for emerald mineralisation
Gemfields ple 15 April 2015 IDEAL CONDITIONS FOR EMERALD MINERALISATION LLL “ CO] Bey) CB] Emeraia Occurence of Host rock (TMS) and presence of Cromoferic elements ( Cr, V) in its composition Intrusion of Pegmatite containing Beryllium elements. Alteration / Reaction / lonic exchange between the peg

Slide 10: Surpac model
Gemfields plc 15 April 2015 Surpac model

Slide 11: Inherited problems
Gemfields plc 15 April 2015 Inherited problems • Huge waste removal backlog • Rock handling — only 125,000 tonnes p/month • Ore handling — only 3,000 tonnes p/month • No ore at the pit bottom for production • Very poor equipment health • Broken Machinery was spread across the property and lay wherev

Slide 12: Pit position in 2008 prior to Gemfields partnership
Gemfields plc 15 April 2015 Pit position in 2008 prior to Gemfields partnership

Slide 13: And today…
Gemfields plc 15 April 2015 And today…

Slide 14: In-pit dumping using strip and fill method
Gemfields plc 15 April 2015 In-pit dumping is done in the mine — using a strip and fill method. This keeps the size of the both pit and dumps small, and ensures that the environmental liability is as low as possible. In-pit dumping (backfilling) on exhausted footwall with waste rock from the high wa

Slide 15: Pit stability — a priority
Gemfields plc 15 April 2015 Pit stability — a priority Benching on high wall to ensure pit stability

Slide 16: Mining at Kagem today
Gemfields plc 15 April 2015 Mining at Kagem today • Gemfields have invested over US$60 million since acquiring the mine in 2008. • Procurement of new fleet of mining equipment. • 33 KV electrification line at mine connected to the national grid at a cost of US$ 600,000. • Detailed mine plan finalize

Slide 17: Turn Around Strategy
Gemfields plc 15 April 2015 Turn Around Strategy • Fresh investment in all resources. Emphasis on improving the resource base of the mine. • Multifold expansion of mining operations – TRH from 125,000 to 1,000,000 tonnes p/month. • Increased ore mining rate from 3,000 tonnes p/month to 8,000 tonnes

Slide 18: Union Negotiations 2012 - 2014
Gemfields plc 15 April 2015 Union Negotiations 2012 - 2014 • Collective agreement with the union was completed and implemented for the year 2012-2014, effective from 1st April 2012. • Kagem was one of the first companies in Zambia to implement the collective agreement in time in 2012. • At that time

Slide 19: Union Negotiations 2014 - 2016
19 Gemfields plc Union Negotiations 2014 - 2016 • We concluded the union negotiation for the period 2014 to 2016 successfully without any stoppage of work or confusions during the period of the negotiations and the collective agreement has been signed between the Management team and the unions. • Ka

Slide 20: Mining At Kagem
Gemfields plc 15 April 2015 Mining At Kagem Manual Mining Mechanised Mining

Slide 21: Future Expansion and Opportunity
21 Gemfields plc 15 April 2015 Future Expansion and Opportunity • Future resources and near-term expansion opportunities are actively being investigated both within the Kagem Mining License (onsite) and on other owned licenses. • Onsite: Following detailed mapping and planned exploration drilling of

Slide 22: Fibolele Pit
22 Gemfields plc 15 April 2015 Fibolele Pit • Based on the positive results of the initial two-phases, continuation of the operations with Phase III will include the merging to the adjacent SW pit. • Final pit dimensions of Phase III will be 590m by 160m by 50m covering an area of 9.53 Ha targeting

Slide 23: Libwente South Pit
23 Gemfields plc 15 April 2015 Libwente South Pit • Total drilling campaign of 137 holes, achieving 12,585m of diamond core drilling outlined a significant TMS body which established the Libwente bulk sampling operation in July 2014. • Presently, the pit is around 18m deep with the deepest point bei

Slide 24: Ishuko Pit
24 Gemfields plc 15 April 2015 Ishuko Pit • Located about 200m SW of the Libwente South Pit, the Ishuko Pit was established with additional drilling with a hanging wall of TMS at 3m to 36m. • The pit is about 5m to 6m deep in the deepest part and TMS has been exposed over 50m along the WNW- ESE dire

Slide 25: Mbuva-Chibolele
25 Gemfields plc 15 April 2015 Mbuva-Chibolele • Mbuva-Chibolele property has all the detailed exploration work completed and ready for immediate action for bringing it up to operational level. • This operation could be started quickly with the previous data scheduling high wall development along th

Slide 26: Kamakanga
26 Gemfields plc 15 April 2015 Kamakanga • Kamakanga received a detailed re-evaluation with close to 2,000m of exploration core drilling. • A small-scale bulk sampling plan is currently being defined from the recent drilling results. Below: Geological Plan of the Kamakanga Pit and license 615000 mE

Slide 27: The Results
Gemfields plc The Results • Gemfields is committed to the long-term re-capitalisation of the Kagem mine; it provided an interest free loan in excess of K580 million (US$ 108 million) utill June 2013 to keep the operation running at Kagem. • This policy has been directly responsible for Kagem’s succe

Slide 28: The Results cont.
Gemfields plc 15 April 2015 The Results cont. • Transparency introduced in emerald auction procedure by inviting Zambian Government stake holders, for e.g, representatives from the Ministry of Finance and the Ministry of Mines to participate in the auctions. The Director on the Board of Kagem, nomin

Slide 29: Wash Plant At Kagem
Gemfields plc 15 April 2015 Wash Plant At Kagem

Slide 30: Grading and sorting Zambian emeralds at Kagem
Gemfields plc 15 April 2015 Grading and sorting Zambian emeralds at Kagem • First time a grading system is formulated by Kagem / Gemfields for Zambian Emerald. • This has helped the customers to get consistent supply of the Zambian emerald for their product.

Slide 31: Value Addition — Local Employment
Gemfields plc 15 April 2015 Value Addition — Local Employment Employment Opportunities Created at Kagem 800 750 700 650 600 550 500 450 400 350 300 2007 2008 2009 2010 2011 2012 2013 2014 2015

Slide 32: Rough emerald and beryl sales (higher quality)
32 Gemfields plc Interim results to 31 December 2014 Rough emerald and beryl sales (higher quality) AUCTION RESULTS JUL ’09 NOV ’09 JUL ’10 DEC ’10 JUL ’11 MAR ‘ 12 NOV ’12 JUL ’13 FEB’14 NOV’14 (HIGHER QUALITY) AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION 29 Oct –

Slide 33: Rough emerald and beryl sales (lower quality)
33 Gemfields plc Interim results to 31 December 2014 Rough emerald and beryl sales (lower quality) AUCTION RESULTS MAR ’10 MAR ’11 NOV ’11 JUN ’12 APR ’13 NOV ‘13 AUG’14 FEB ’15 (LOWER QUALITY) AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION Dates 11-15 Mar 2010 10-14 Mar 2011 21-25

Slide 34: Kagem rough emerald and beryl auction: high grade
Gemfields plc 15 April 2015 Kagem rough emerald and beryl auction: high grade Actual Sales Price (USD/carat) Calculated as: USD Received / Total Weight Sold 80 70 65.89 59.31 60 54.00 50 42.71 40 38.25 29.71 30 26.20 20 9.35 10 4.4 5.10 0 JUL `09 NOV `09 JUL `10 DEC `10 JUL `11 MAR `12 NOV `12 JUL `

Slide 35: Kagem rough emerald and beryl auction: low grade
Gemfields plc 15 April 2015 Kagem rough emerald and beryl auction: low grade Actual Sales Price (USD/carat) Calculated as: USD Received / Total Weight Sold 4 3.72 3.5 3.32 3 2.61 2.5 2.42 2 1.5 1.34 1.12 1 0.77 0.5 0.31 0 MAR `09 MAR `11 NOV `11 JUN `12 APR `13 NOV `13 AUG '14 FEB '15

Slide 36: Safety First
Gemfields plc 15 April 2015 Safety First More than Three Million One Hundred injury free man-shifts recognised by the Mines Safety Department

Slide 37: Kagem revenues
Gemfields plc 15 April 2015 Kagem revenues

Slide 38: Royalties paid to Zambian revenue authority
Gemfields plc 15 April 2015 Royalties paid to Zambian revenue authority

Slide 39: Kagem profits
39 Gemfields plc 15 April 2015 Kagem profits KAGEM'S ANNUAL CORPORATE TAX PAYABLE /PAID (USD'000) 30,000 25,000 23,921 20,000 15,000 10,000 9,082 7,212 5,000 - - - - - - - - 30-Jun-05 30-Jun-06 30-Jun-07 30-Jun-08 30-Jun-09 30-Jun-10 30-Jun-11 30-Jun-12 30-Jun-13 30-Jun-14 Clear local value addition

Slide 40: Kagem profits
Gemfields plc 15 April 2015 Kagem profits KAGEM'S ANNUAL PROFITS (USD'000) 40,000 34,231 30,000 GEMFIELDS acquired a 75% interest in the Kagem mine 23,637 20,000 17,598 10,000 6,110 1,357 2,060 646 - -3,040 (10,000) -14,534 (20,000) -16,567 30-Jun-05 30-Jun-06 30-Jun-07 30-Jun-08 30-Jun-09 30-Jun-10

Slide 41: Kagem profits
Gemfields plc 15 April 2015 Kagem profits

Slide 42: First ever dividend paid by Kagem
Gemfields plc 15 April 2015 The first ever dividend paid by Kagem in its 29 year history and the first such payment to the Government of Zambia from any gemstone operation in Zambia. Minister of Finance, Government Republic of Zambia, Hon. Alexander Chikwanda receives a K10.94m dividend cheque from

Slide 43: Corporate Social Responsibility
Gemfields plc Corporate Social Responsibility The CSR policy aims to ensure that our projects enjoy the maximum possible impact through adopting a sustainable long term strategy including all the stakeholders — but most importantly the local population. • Major stakeholders include traditional estab

Slide 44: Corporate Social Responsibility
Gemfields plc 15 April 2015 Corporate Social Responsibility The company has identified, together with the community, areas that would be supported. These sectors include the following: • Education (Chapula Basic School, Kapila Community School, and Kafwaya Memorial Community School). • Health (Nkana

Slide 45: Corporate Social Responsibility
Gemfields plc 15 April 2015 Corporate Social Responsibility The Company has various projects with aim to help the local community. The Company has a full fledged Community Project Coordinator in place for effective implementation. School at Kapila & Chapula Farmers at the Blessing Farms & Kapila Gre

Slide 46: For the Nation!
Gemfields plc 15 April 2015 Gemfields & Government in Partnership FROM MINE TO MARKET LEAVING AN ENVIRONMENT FOR THE NATION!

Slide 47: Contact us
Gemstone PLC Contact us Gemfields Plc 54 Jermyn Street London SW1Y 6LX United Kingdom Tel: +44 (0)20 7518 3400 Fax: +44 (0) 20 7197 8193
Source: Internet Archive copy of gemfieldsgroup.com
More decks from Gemfields Group Limited
FY2025 Earnings Presentation26 slides · Mar 26, 2026
H1 2025 Earnings Presentation74 slides · Sep 26, 2025
FY2024 Earnings Presentation30 slides · Apr 11, 2025
Investor Presentation (November 2024)39 slides · November 2024
FY2023 Earnings Presentation37 slides · Mar 25, 2024
FY2022 Earnings Presentation71 slides · Mar 24, 2023