Cap S.A. · BCS:CAP
Cap — 4th Annual Larrain Vial International Investors' Conference 2010
41 slides from Cap's conference presentation, March 2010
Slide 1: 4th Annual Larrain Vial International Investors' Conference
4th Annual Larrain Vial International Investors’ Conference March, 2010
Slide 2: Agenda
Company overview Financial highlights Earthquake effects in CAP CAP – Mitsubishi Corporation transaction Strategic considerations 2
Slide 3: Vertically integrated ferrous metal company
Vertically integrated ferrous metal company • Exports iron ore products, mainly to Asia • Produces steel for the domestic market • Processes value-added steel solutions in Chile, Peru and Argentina Mining Steel production Steel processing Production capacity 11.5 million tonnes. 1.45 million tonnes.
Slide 4: Corporate structure
Corporate structure 9.6% 19.3% 31.3% 39.8% MCI 1 50.0% Iron Ore Mining Steel Production Steel Processing 4
Slide 5: Iron ore mining
Iron ore mining 5
Slide 6: Areas of operation
Areas of operation Punta Totoralillo Port Cerro Negro Norte Copiapó Magnetite Plant Los Colorados Guacolda II Port Vallenar Pellets Plant El Algarrobo Cristales El Tofo El Romeral La Serena Guayacán Port 6
Slide 7: Iron ore mining
Iron ore mining • Largest producer of iron ore and pellets on the Pacific coast of South America with a production capacity of 11.5 million MT • Ample resources and known reserves, together with the expansion of its exploration activities, guarantee continuity of operations for many decades • Strong
Slide 8: Resources and reserves
Resources and reserves Mine / Deposit Total Mineral Resources (1) Reserves (2) MTM Grade (% Fe) MTM Grade (% Fe) El Laco 734 49,2% 376 56,7% Hierro Atacama II - Cerro Negro Norte 457 34,6% 176 39,0% Los Colorados (3) 432 44,9% 272 43,6% Hierro Atacama I - Candelaria (4) 344 10,0% --- --- El Romeral
Slide 9: Stability of sales and markets
Stability of sales and markets Deliveries Markets ASIA : 85% CHILE : 13% Th. MT OTHERS : 2% 10.145 10.500 Korea 1,5% 8.377 8.500 7.579 7.674 USA 2,0% 7.312 7.251 Chile 13,4% M alaysia 4,3% 6.500 Japan 9,3% 4.500 2.500 500 China 62,0% Indonesia 7,5% 2004 2005 2006 2007 2008 2009 Source: CAP 9
Slide 10: Steel production operations
Steel production operations 10
Slide 11: Steel production
Steel production • Chile’s steel market leader • 60% and 69% market share in total and target markets respectively • 1.45 million tons of annual liquid steel production capacity • Strong long-term commercial relations with customers in Chile • Vertical integration in iron and limestone provides adva
Slide 12: Share of CSH in its target market
Share of CSH in its target market Sales of CSH in its Total Steel Market CSH Sales Target Market (2009) (922 Th. tons in 2009) (1.52 million tons in 2009) (thousands tons sold – market share) 2.500 80% 70% 2.000 60% 1.500 50% Th. MT 40% 1.000 30% 20% 500 10% 0 0% CSH Sales (60%) 2004 2005 2006 2007
Slide 13: Steel processing
Steel processing 13
Slide 14: Steel processing
Steel processing • Creates value-added solutions for construction, industry and infrastructure sectors in Chile, Peru and Argentina • Its addition to the CAP group seeks to promote steel consumption Peru • Should result in improvements in consolidated returns Deliveries Chile 450 Purchase to CSH 400
Slide 15: Agenda
Company overview Financial highlights Earthquake effects in CAP CAP – Mitsubishi Corporation transaction Strategic considerations 15
Slide 16: Financial highlights (US$ million)
Financial highlights (US$ million) Sales EBITDA (1) 534 2.200 550 1.972 2.000 500 1.800 1.583 450 1.600 1.386 400 336 1.400 350 1.200 997 300 255 247 1.000 880 725 250 208 800 186 200 600 150 400 100 200 50 0 0 2004 2005 2006 2007 2008 2009 2004 2005 2006 2007 2008 2009 Net Financial Debt Net Financ
Slide 17: Financial highlights: EBITDA by business unit
Financial highlights EBITDA by business unit 90% 77% 80% 70% 60% 60% 54% 52% 50% 47% 50% 42% 38% 40% 40% 36% 30% 24% 16% 18% 20% 13% 12% 8% 8% 10% 5% 0% 2004 2005 2006 2007 2008 2009 CMP CSH SPG 17
Slide 18: Financial evolution
Financial evolution (US$ million) 2004 2005 2006 2007 2008 2009 Sales 725 880 997 1.583 1.972 1.386 Operational Margin 180 185 170 301 454 172 EBITDA (1) 208 255 247 336 534 186 (million of US$) 2004 2005 2006 2007 2008 2009 Cash 62 154 242 184 379 387 Short Term Debt (2) 109 136 97 81 111 44 Long T
Slide 19: Debt maturity profile
Debt maturity profile 250 Banks Bonds 200 (million of US$) 150 100 50 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021- 2036 19
Slide 20: Agenda
Company overview Financial highlights Earthquake effects in CAP CAP – Mitsubishi Corporation transaction Strategic considerations 20
Slide 21: Earthquake effects in CAP
Earthquake effects in CAP Compañía Siderúrgica Huachipato (CSH) Â Earthquake affects the principal installations of CAP’s steel mill, CSH, especially in the primary production area, including: pier, coke plant, blast furnaces and BOF Â The rollers of the flat and long products, and the zinc-alum lin
Slide 22: Damages assessment: Pier – Coke Plant
Damages assessment Pier – Coke Plant  The pier structure shows no evident faults  Unloading towers Nbr. 1, 2 and 3 with different degrees of misalignment. Nbr. 2 inclined southward difficulties the use of the southern side for unloading raw materials  Furnace loading machine derailed and partiall
Slide 23: Damages assessment: Blast furnaces
Damages assessment Blast furnaces  Blast furnaces (BF) with some damage, with load solidified  Damages to anchoring of the BF heaters  Because of the long time they were without water, damage to the refrigeration elements are being evaluated  Estimated time for recovery: 3 months (evaluation und
Slide 24: Damages assessment: BOF
Damages assessment BOF  Liquid steel discharge area, from torpedo ladles to transfer cutters, affected due to the sinking of the rail by approximately 40 cms  Six cutters have steel inside. These cannot be emptied, they contain solidified steel  Estimated time for recovery: 2 months (evaluation u
Slide 25: Agenda
Company overview Financial highlights Earthquake effects in CAP CAP – Mitsubishi Corporation transaction Strategic considerations 25
Slide 26: Corporate structure
Corporate structure 9.6% 19.3% 31.3% 39.8% MCI 1 50.0% Iron Ore Mining Steel Production Steel Processing 26
Slide 27: Description of CMP
Description of CMP Financial information Financial information (US$ (US$ million) million) CMP CMP 2007 2008 2009 Producción ('000s de toneladas) 7,871 8,427 8,534 Operations: El Romeral mine and Minera Producción CMP 2,324 2,707 3,623 Hierro Atacama Producción CMH 5,547 5,720 4,911 Ventas net
Slide 28: Description of CMH
Description of CMH Financial Financial information information (US$ (US$ million) million) CMH CMH 2007 2008 2009 Company operated by CMP formed by a Producción ('000s de toneladas) 5,547 5,720 4,911 Ventas $392 $572 $418 50/50 JV between CMP and Mitsubishi (1996) EBITDA 173 306 153 Margen (%) 44.
Slide 29: The transaction: objectives
The transaction Objectives Control of 100% of CMH’s cash flow Consolidation of the EBITDA of CMH Optimization of CMP’s capital structure and financial profile for potential transactions in the capital markets Raise funds through a capital increase to contribute to the financing of the first
Slide 30: The transaction: the offer
The transaction The offer On February 8, 2010, MC presented the offer described below which implies an investment by MC in CMP of US$ 924 million, in the following manner: US$ 523 million through the exchange of its 50% holding in CMH (1,050,000 shares) for 664,760 new shares in CMP, equivalent
Slide 31: Shareholders' agreement
Shareholders' agreement General terms and conditions Special quorums for some decisions and formula for resolving disputes Matters for special quorum a. Approval of the F/S should the auditor not approve them without reservation b. Change of the dividend policy from 75% c. Payment of bonuses or
Slide 32: New structure of mining business
New structure of mining business A B MC CAP MC CAP 50.0% 100.0% 25.0% 75.0% CMP 50.0% CMP / CMH CMH 32
Slide 33: Merits of the transaction
Merits of the transaction Very attractive price for CAP Improves the financial capacity of CMP Acceleration of the development of the company’s projects portfolio Consolidation of the alliance with a strategic partner with a global presence 33
Slide 34: Very attractive price for CAP
Very attractive price for CAP Economic terms of the offer represent a very attractive price for CAP CAP purchases an asset with a strong cash generation (CMH) which could be used in projects (CMP) that, as well as requiring considerable amounts of investment, have implementation terms of approxi
Slide 35: JP Morgan's valuation: CMP
JP Morgan’s valuation Enterprise Value (EV) of CMP (US$ million) EV/EBITDA 2010E – 18.1x Oferta MC EV/EBITDA 2011E – 12.6x $2,827 EV/EBITDA EV/R&R EV/R&R BP – 2.33 US$/ton 2010E 2011E Plan de N. 1 DCF¹ DCF, consensus case2 1.697 2.292 8.1-10.9x 5.3-7.1x $1.4-1.9 DCF, management case 12.0-16.2x 8.3-1
Slide 36: JP Morgan's valuation: CMH
JP Morgan’s valuation Enterprise Value (EV) of CMH (US$ million) Oferta MC EV/EBITDA 2010E – 8.5x $1,020 EV/EBITDA 2011E – 7.9x EV/EBITDA EV/ 1 DCF1 EV/R&R BP –3.42 US$/ton 2010E 2011E BP R&R DCF, consensus case2 996 1.146 6.3-7.2x 4.3-4.9x $3.3-3.8 DCF, management case 846 988 7.0-8.2x 6.5-7.6x $2.
Slide 37: Timetable for approval process
Timetable for approval process February 8, 2010 February 9, 2010 March 10, 2010 CAP received MC’s offer Board of Director’s approval Shareholders’ meeting “T” T + 30 T + 45 Anti-trust authority approval CMP – CMH merger Capital increase at CMP 37
Slide 38: Agenda
Company overview Financial highlights Earthquake effects in CAP CAP – Mitsubishi Corporation transaction Strategic considerations 38
Slide 39: Mining business
Mining business • Investments plan in accordance with the new scenario, after the merger of CMP and CMH, and the capital increase in the new CMP • This means brownfield projects will commence during 2010 and greenfield Cerro Negro Norte project to follow, after environmental approvals • Continue inv
Slide 40: Steel and Steel Processing
Steel and Steel Processing • Reconstruction and repair in CSH after the earthquake will last at least three months and production at full capacity in the steel processing business through the year • Long term plan for the consolidation of the steel business in Chile and for the development of the st
Slide 41: www.cap.cl
www.cap.cl 41
CAP — 4th Annual Larrain Vial International Investors' Conference 2010 on 6ix