Gratomic Inc · TSXV:GRAT.H
Gratomic — Investor Presentation (May 2022)
41 slides from Gratomic's investor presentation, May 2022
Slide 1: Corporate Presentation
T S X - V: G R AT OTCQX:CBULF F R A N K F U R T: C B 8 2 V E I N G R A P H I T E C O M PA N Y Corporate Presentation
Slide 2: Forward Looking Statement
gratomic.ca Gratomic Inc. Forward Looking Statement Certain statements included in this presentation are forward looking statements currency fluctuations; defective title to mineral claims or property and dependence within the meaning of Canadian securities laws, including the following on key emplo
Slide 3: About Us
gratomic.ca About Us The primary focus of Gratomic is to diversify supply chains out of China into North America and Europe. The Company aims to be the LARGEST VEIN GRAPHITE PRODUCER globally, with full operational capabilities for its fully licensed and permitted 22,000 tpa (tonnes per annum) Aukam
Slide 4: Estimated Project Development Timelines
gratomic.ca Estimated Project Development Timelines 2022 2023 2024 2025 Aukam: Complete drilling, Operational Aukam: First year of operations and Aukam: Expansion of onsite processing Aukam: Expansion ramp-up Readiness, Feasibility Study (FS) and expansion plan gets under way plant to begin enter op
Slide 5: Estimated Product Development Timeline
gratomic.ca Estimated Product Development Timeline 2022 2023 2024 2025 Targeted completion of 2,300 tonnes of Targeted completion of 16,000 tonnes of Aukam: Target of 22,000 tonnes Aukam: Target of 32,000 tonnes saleable graphite material sourced from graphite material sourced from Gratomic’s Gratom
Slide 6: Vision Values Mission
VISION Gratomic aims to become a key ™ VALUES üHealth and Safety of our people strategic supplier of clean, environmentally friendly and ethically always comes first sourced graphite for the Carbon Age. üTransparency within the organization and with all stakeholders üIntegrity, teamwork and personal
Slide 7: Business Strategy
gratomic.ca Business Strategy To establish a mineral backstop consisting of lower-quartile cost curve Purpose assets which supports continuous international growth and expansion Strict Positive Economic Asset Acquisition Continuous Objectives ESG Plan Impact & Development Improvement ESG VALUE GROWT
Slide 8: Shareholder Value
Shareholder Value Cost Management Balance Sheet Growth Expertise Valuation • Pioneering innovative • Strictly enforced • Strategic focus on • Decades’ combined • Sustainable growth approaches to mining cash flow controls the discovery and experience in through the tactical exploration and • Strong f
Slide 9: Global Presence
gratomic.ca Global Presence Project Name Location Key Highlights Karas Region, Namibia ✓ Friendly mining jurisdiction ✓ Vein graphite ✓ High purity Aukam Graphite Project ✓ High quality ✓ Eco-friendly ✓ Lowest quartile of cost curve ✓ Ease of processing Bahia Region, Brazil ✓ Friendly mining jurisdi
Slide 10: Graphite Anodes
Graphite Anodes As depicted in the chart above, graphite continues to be the main component in EV battery chemistry. In fact, according to Rho Motion approximately 50% of all EV Li-ion battery anodes are made up of natural graphite. *Charts provided by Rho Motion. “Confidential and Proprietary. Copy
Slide 11: Industrial Development Plan
gratomic.ca Industrial Development Plan ADDED VALUE MANUFACTURING MINERAL GRAPHITE GRAPHITE TRANSPORT DISTRIBUTION PROCUREMENT PROCESSING FINISHING Once the graphite has At the Lüderitz Bay After the graphite has Graphite is extracted The graphite is then fed been successfully facility, the graphite
Slide 12: Opportunities
Opportunities EXISTING MARKETS EV BOOM & ESG & MINING GROWING DEMAND Estimated Carbon Footprint: Continued need for graphite in its existing markets: ü 0.8 Kg per tonne ü Batteries Second largest component in the Li- ü Fuel cells ion Battery: Recycling/recovery: ü Lubricants ü Graphite is the materi
Slide 13: Strategic Partnerships
Building Sustainability Strategic Partnerships Institutionalization of Graphite Product Development Through its partnership with TM2 Forge Nano has developed their patented Atomic Layer Technology Metals trading platform, Deposition (ALD) coating, which creates a higher Gratomic will be the first gr
Slide 14: Executive Leadership
gratomic.ca THE TEAM Executive Leadership Arno Brand Rodger Roden Armando Farhate Bill Johnstone President & CEO Chief Financial Officer COO & Head of Graphite Legal Counsel & & Director Marketing and Sales Corporate Secretary “Confidential and Proprietary. Copyright (c) by Gratomic Inc. All Rights
Slide 15: Management, Directors, & Advisors
gratomic.ca Management, Directors, & Advisors The Team Corporate Office Canada Directors: Glenda Green, Head of Communications & Marketing Arno Brand, President & CEO Karl Trudeau, Head of Operations, Namibia Armando Farhate, Head of Graphite Marketing & Sales Stephen Woodhead, Senior Vice president
Slide 16: Financials & Capital Structure
Financials & Capital Structure CAPITAL STRUCTURE FINANCIAL HIGHLIGHTS Issued & Outstanding: FINANCINGS 176,881,214 Broker Warrants: ü Debt Free 74,000 May 2020 $2.25 MM ü Low Warrants $1.45 Warrants: March 2022 $5.5 MM 987,882 ü Near-term Revenue Options: 12,880,000 Fully Diluted: 190,823,096 *at Ma
Slide 17: International Trading Information
gratomic.ca International Tr a d i n g I n f o r m a t i o n 1 CANADA TSX-V : GRAT 2 UNITED STATES OTCQX : CBULF 3 EUROPE FSE : CB82 “Confidential and Proprietary. Copyright (c) by Gratomic Inc. All Rights Reserved.” 17
Slide 18: Appendices
T S X - V: G R AT OTCQX:CBULF F R A N K F U R T: C B 8 2 Appendices
Slide 19: Namibia Political & Business Climate
Namibia Political & Business Climate ü Politically stable since gaining independence from South Africa in 1990 ü One of the world’s most mining-friendly jurisdictions ü Good infrastructure, Aukam Graphite Project situated close to the Port of Lüderitz Bay ü “Namibia is upgrading its transportation i
Slide 20: Aukam Graphite Project Milestones Achieved
Namibia Aukam Graphite Project Milestones Achieved: ü Product in Bag ü Modular and expandible processing plant ü Commissioning/Operational readiness in final stages ü Assembly of world-class graphite team ü All Necessary Licensing & Permits ü Lowest quartile cost curve asset ü 100% controlling inter
Slide 21: Aukam Competitive Advantages
Namibia Aukam Graphite Project Competitive Advantages: ü On schedule to obtain production status in 20221 ü Transitioning from exploration to a mining company ü Debt-free ü Strategic partnerships with TM2 and Forge Nano ü MOU with state-of-the-art battery manufacturer ü In talks with OEMs and Gigafa
Slide 22: Aukam Graphite Project History
Namibia Aukam Graphite Project Aukam is a historical mine hosting five underground adits In 2018, the Company successfully constructed and that was periodically mined from 1940 to 1974. In 2012, operated a pilot facility with the intent of gathering the Gratomic team reclassified Aukam as a vein gra
Slide 23: Aukam Open Pit
Namibia Aukam Graphite Project In addition to the five underground adits, the project also hosts an open pit at the top of the mountain. The Company intends to resume mining through an open pit operation at the top of the mountain. The image to the right, depicts COO & Head of Graphite Marketing and
Slide 24: Aukam Mining License
Namibia Aukam Graphite Project On March 24th, 2020 the official Mining License (ML 215) was granted by the Ministry of Mines and Energy for its Aukam Graphite Property located in Namibia. The License area falls within the proximity of the Aukam Processing Plant and the Graphite bearing shear zone of
Slide 25: Aukam Location and Infrastructure
Namibia Aukam Graphite Project Aukam is located 45 minutes from Aus and 200 km from the port of Lüderitz Bay. Local infrastructure also includes a railway system, which is part of a government upgrade plan. Local logistics makes this location ideal for transporting processed graphite to Gratomic’s f
Slide 26: Aukam Mineralization and Facility
Namibia Aukam Graphite Project Data obtained over the past 8 years of the project has led to a better understanding of the quality and distribution of the graphite mineralization at Aukam. Exploration has demonstrated significant potential for expansion of the mineralization outside the old workings
Slide 27: Simplified Aukam Flow Diagram
Namibia Aukam Graphite Project Simplified Aukam Flow Diagram Engineering Design: ü Engineering design completed ü Optimization of specific process areas underway based on Trade-off studies conducted ü The entire plant employs proven mineral processing equipment that has been used in the industry for
Slide 28: Aukam Processing Plant in Progress
Namibia Aukam Graphite Project Aukam Processing Plant in progress “Confidential and Proprietary. Copyright (c) by Gratomic Inc. All Rights Reserved.” 28
Slide 29: Brazil Graphite Projects
Brazil Graphite Projects Capim Grosso Vein Graphite Jacobina and Igrapiuna Asset Characteristics: ü Graphite characteristics similar to Aukam ü Right to acquire 100% controlling interest ü 100% controlling interest ü Located 30 km from Capim Grosso with possibility to feed the same processing plant
Slide 30: Capim Grosso Vein Graphite Project
Brazil Capim Grosso Vein Graphite Project ü High crystallinity, typical of vein deposits ü Weathered, friable host rock ü Mining friendly jurisdiction ü Favourable proximity to grid power, water and road ü Consolidated farmlands, little environmental impact “Confidential and Proprietary. Copyright (
Slide 31: Capim Grosso Mineral Claim and Location
Brazil Capim Grosso Vein Graphite Project Gratomic’s Capim Grosso Graphite Project comprises mineral claim 870.180/2012, covering a surface area of 426.03 Ha, owned by Zumbi Mineração Brazil, a whole owned subsidiary of Gratomic, Inc. The asset was acquired from private shareholders in a transaction
Slide 32: Capim Grosso Resource Exploration
Brazil Capim Grosso Vein Graphite Project Resource Exploration up to April 2022: Grab samples from site visit in July 2021: 14 samples analyzed Between 3.8 and 18% Total Graphite as Carbon (TGC), average 11% 2 trenching programs, in August and October 2021: 42 trenches varying in length from 30 to 1
Slide 33: Preliminary 3D Perspective of Capim Grosso Deposit
Brazil Capim Grosso Vein Graphite Project Preliminary 3D Perspective of the Capim Grosso Deposit The graphite depicted in this model ranges between 3% to 41% TCG based on detailed analysis The legend to the right indicates the corresponding colour and grade of graphite within the 3D perspective. “Co
Slide 34: Capim Grosso Mining Permit Status
Brazil Capim Grosso Vein Graphite Project Current Mining Permit Status Mineral claim 870.180/2012 is currently at “Mining Requirement” status at ANM (National Mining Agency). This means ANM is reviewing the PAE (FS) and should issue the permit in the sequence Exploration environmental permit was ren
Slide 35: Capim Grosso Other Mineral Rights
Brazil Capim Grosso Vein Graphite Project Other Mineral Rights Gratomic has a total of 6 mineral rights for graphite within its Capim Grosso Project. Potential strike length of 6 km 870.180/2012 being the main property, with the other 5 adjacent EPLs to be explored subsequently “Confidential and Pro
Slide 36: Capim Grosso Metallurgical Tests
Brazil Capim Grosso Vein Graphite Project SGS Lakefield (ON, Canada) has been commissioned Size Weight Assay % Distribution to perform metallurgical tests Fraction % % C(t) C(t) +48 mesh 3.2 93.5 3.0 Preliminary results from trenched material show +80 mesh 7.8 96.3 7.7 combined concentrate grade of
Slide 37: Capim Grosso Concentrator Design
Brazil Capim Grosso Vein Graphite Project Concentrator Feed Preliminary engineering design has Rougher commenced based on the recent Combined metallurgical test results and a 60,000 Screen Rod Mill Ball Mill Tailings tpa design capacity Impact Crusher Polishing Mill #1 SMM #2 Deliverables of the pre
Slide 38: Jacobina and Igrapiuna Graphite Project
Brazil Jacobina and Igrapiuna Graphite Project Jacobina Jacobina: Capim Grosso Two active permits: 870162/2019 and 870163/2019 with a total of 1,989.6 ha Igrapiuna: Active permit nº 870599/2019 with 792.4 ha Mineralization of flake graphite, disseminated hosted in high metamorphic grade rocks Occurr
Slide 39: Buckingham, Canada
Canada Buckingham Asset Characteristics: ü Mining Friendly jurisdiction ü 480 hectares in eight claim blocks ü 7 kilometres northwest of Buckingham, Quebec, Canada ü Located within the Central Metasedimentary Belt of the Grenville Geologic Province ü Technical Report available HERE ü Trenching and d
Slide 40: Risk Factors
gratomic.ca Risk Factors No mineral resources, let alone mineral reserves demonstrating economic viability and technical feasibility, have been delineated on the Aukam Property. The Company is not in a position to demonstrate or disclose any capital and/or operating costs that may be associated with
Slide 41: Thank You
Thank You 22 Adelaide Street West, Suite 3600, Bay Adelaide Centre – East Tower Toronto, ON, CA M5H 4E3 Contact: As noted in the disclaimer , elements of this presentation may contain forward-looking statements, which are based on estimates and assumptions made by the Company in light of its experie