Gratomic Inc · TSXV:GRAT.H

Gratomic — Investor Presentation (April 2020)

38 slides from Gratomic's investor presentation, April 2020

  1. Slide 1: April 2020 Presentation

    [ rz Gratomic — | April 2020 Presentation

  2. Slide 2: Forward-Looking Statements

    Certain statements included in this presentation are forward looking statements currency fluctuations; defective title to mineral claims or property and dependence within the meaning of Canadian securities laws, including the following on key employees. Persons reviewing this presentation are cautio

  3. Slide 3: Market

    50%/50% JV PERPETUUS Graphene tires AUKAM RARE MARKET ADVANCED GRAPHITE MINE Supplier of 98%+Cg MATERIALS graphite purity after flotation and Air Classification. Global automotive tire Graphite production Graphite to graphenes capacity of 20,000 using plasma reactors market today is tonnes per annum

  4. Slide 4: Namibia, Africa

    NAMIBIA, AFRICA

  5. Slide 5: Aukam graphite property highlights

    • High grade crystalline vein graphite asset ranging between 3% Cg and 81% Cg through drilling, sampling, and bulk sampling. • One of the only jurisdictions of viable vein graphite outside of Sri-Lanka. • Visible Surface Graphite Identified over 15 km strike. • In the final 3-month construction phas

  6. Slide 6: Aukam mine location and infrastructure

    Luderitz Harbor Paved Highway Town of Aus Aukam Mine 500m cargo and container quay & Railway Paleozoic Tablelands Coastal Plain Atlantic Desert Ocean 1.5 hours 6

  7. Slide 7: Aukam geological diagram and achievable processed grade

    AUKAM GEOLOGICAL DIAGRAM AUKAM ACHIEVABLE PROCESSED GRADE Test processing results have produced an average grade of 98.37% Cg in cleaner concentrate average after flotation Higher (>99.9%) concentrations can be 99% achieved with air classification Flotation Concentrate Cleaner Composite ID Concentra

  8. Slide 8: TODAQ and Phu Sumika agreements

    TODAQ* PHU SUMIKA* • Under a USD $25 Million (payable in TODA notes) supply agreement with TODAQ, • Under a sales agreement with Phu Sumika, Gratomic will supply TODAQ with pre- Gratomic will supply to Phu Sumika 7,500 graphene graphite to be used by TODAQ as a tonnes of graphite per annum, for a te

  9. Slide 9: Mining License 215 notice from Ministry of Mines and Energy

    On the 23rd of March 2020, Gratomic received a Notice from the Ministry of Mines and Energy of Namibia. The Minister is prepared to grant Mining License 215 (ML215) for its Aukam Graphite Property in Namibia. The License area falls within the proximity of the Aukam Processing Plant and the Graphite

  10. Slide 10: Gratomic EPLs and mining license

    Gratomic EPL’s: • EPL 3895 –27 820.4515Ha. • EPL 6710 - 35 201.1195Ha. • EPL 7512 - 24 479.6005Ha. • EPL 7513 - 49 972.0706Ha. Mining License: • 5002Ha on EPL 3895 11 10

  11. Slide 11: Gratomic Advanced Materials

    Gratomic A> advanced materials TSX.V : GRAT

  12. Slide 12: Perpetuus graphite derived graphenes

    • Gratomic owns three triple chamber reactors housed at the Perpetuus factory in Swansea Perpetuus is believed to be the • Semi-automatic, computer world’s only producer of graphite controlled for repeatability and tune- ability. derived graphenes with outputs • Robust and capable of processing inde

  13. Slide 13: Gratomic and Perpetuus collaborative agreement

    • Gratomic and Perpetuus entered into a collaborative agreement on March 5th, 2018. • The agreement calls for Gratomic to be the supplier of high-grade graphite concentrates and Perpetuus to supply operating expertise and contribute IP. • Gratomic owns 3 reactors housed in the Perpetuus factory in S

  14. Slide 14: Graphene properties

    • The first layer of graphene was isolated in the University • Surface modified graphene stacks: of Manchester in 2004. o Easy to handle o Easy to package • Graphene is an allotrope of carbon a single atom thick o Friable plane of graphite. • Easily handled, packaged and dispersed within target poly

  15. Slide 15: Aukam graphite to graphenes

    • Aukam graphite to graphenes assayed at Swansea University where plasma processes deliver graphenes at 99% carbon. (Please reference slides 17 and 18 below). • Consistently produced via environmentally friendly computer controlled production processes. • Obtained independent verification of product

  16. Slide 16: Perpetuus output material graphene stacks

    Gratomic Input Material Graphite Perpetuus Output Material – Graphene Stacks 16

  17. Slide 17: SEM analysis spectrum

    PROJECT 1 6/30/2019 6:11:26 PM Spectrum processing : Peaks possibly omitted : 0.707, 6.378 keV Processing option : All elements analyzed (Normalised) Number of iterations = 4 Standard : C CaCO3 1-Jun-1999 12:00 AM Si SiO2 1-Jun-1999 12:00 AM K MAD-10 Feldspar 1-Jun-1999 12:00 AM Eleme Weight Atomic

  18. Slide 18: SEM analysis spectrum

    Project 1 6/60/2019 6:13:23 PM Spectrum processing : No peaks omitted Processing option : All elements analyzed (Normalised) Number of iterations = 4 Standard : C CaCO3 1-Jun-1999 12:00 AM Si SiO2 1-Jun-1999 12:00 AM K MAD-10 Feldspar 1-Jun-1999 12:00 AM Fe Fe 1-Jun-1999 12:00 AM Eleme Weight Atomic

  19. Slide 19: Opportunities

    OPPORTUNITIES CONDUCTIVE INKS & TIRES BATTERIES & CAPACITORS TOUCH SCREENS ELECTRONIC DEVICES PAINTS PASTES • Reduce friction • Light, quick to charge, thin • Lighter, stronger and faster • Vastly more conductive, • Improve processing • Corrosion barrier • Harder wearing and inexpensive to • Graphen

  20. Slide 20: Graphenes used in tires during terrain tests

    Gratomic’s graphite derived graphenes are being used in 15 inch tires during terrain tests on small commercial, high mileage vehicles in Europe and Asia. 20

  21. Slide 21: Fully diluted share structure

    ISSUED & OUTSTANDING 45,244,228 WARRANTS 28,133,474 OPTIONS 3,005,000 FULLY DILUTED1 76,382,702 1 As of April 17, 2020 21

  22. Slide 22: Management

    Arno Brand , CEO & President Mr. Brand, is a Namibian entrepreneur with 12 years of experience working on major construction and mining projects in Africa. As an experienced commodity Trader/Broker, Arno has been involved in numerous public transactions and company financings. Rodger Roden, CFO Mr.

  23. Slide 23: Directors

    Walter Luke PMP, Director Mr. Luke is certified in professional project management with over 29 years of global experience directing large projects for many notable companies. His ventures have taken him to over 40 countries and has brought international recognition to numerous business developments

  24. Slide 24: Advisory board

    Armando Farhate, Executive Management & Head of Advisory Board Mr. Farhate’s prior experience in the planning, engineering, research and development, processing, project management, sales, and marketing areas of the graphite mining industry make him the ideal candidate to fill the role as Head of th

  25. Slide 25: Technical Data

    Gratomic ; yyTSK REPEC Es OF TECHNICAL DATA

  26. Slide 26: TODAQ supply agreement

    • Under a USD $25 Million (payable in TODA notes) supply agreement with TODAQ, Gratomic will supply TODAQ with pre-graphene graphite to be used by TODAQ as a reserve backstop to underpin the value of deployed TODA Notes (TDN). • TODAQ has, to date, placed two initial purchase orders, for 1,200 tonne

  27. Slide 27: Phu Sumika sales agreement

    • Under a sales agreement with Phu Sumika, Gratomic will supply to Phu Sumika 7,500 tonnes of graphite per annum, for a term of five years from the date the Aukam Plant begins commercial production. • The sales agreement contemplates the sale of graphitic product ranging from 80% to 99.9% carbon at

  28. Slide 28: Processing flow sheet

    Jaw Cyclone Primary Recovery Feed Crusher Flotation Flotation Impact Rod Mill Grade Crusher Flotation Size Reduction Separations Process Ion Thickener Water Removal Thickener Bricks Clean Solids Water Removal Filter Dryer H2O Storage H2O Recovery Dewatering 28

  29. Slide 29: Drills purchased and exploration program

    Gratomic purchased two drills in January 2019, an XY1 and LY 38. • The XY1 will be used for exploration drilling and the LY 38 will be used for defining a mineral resource at Aukam. • Phase two of the mine plan will be established based on the results of the LY38 surface drill program. • The drillin

  30. Slide 30: Infill drill program 2017

    March of 2017, Gratomic conducted an infill drill program using its company owned Kemp pneumatic drill using a BQ system in the existing main adit over 659 meters. The 29 combined drill holes revealed graphite mineralization demonstrating a range of 3% Cg - 64%Cg. Phase one mining is comprised of th

  31. Slide 31: Underground drill program section

    South view of the underground drill program indicating selected graphite intersections of the main adit. 31

  32. Slide 32: Phased mine plan

    The mine plan will be conducted in phases beginning with phase one and two as outlined below. Phase one is focused on recovering 20,000* tonnes of 98% graphite concentrate from historical mined areas and in-situ graphite mineralization indicated from the underground drill program. The graphite will

  33. Slide 33: Graphite to graphenes method

    Graphite to Graphenes method employed by Natural Graphite AB Stacking Gratomic: Exfoliation ABC Stacking Liberation of Graphenes 33

  34. Slide 34: Graphene tire compound test results

    Rebound height ( H 250 ) KEY NOTES: Rebound height ( H 125 ) Abrasion ( mm3) • 30% less abrasion (volume loss) with Gratomic graphenes compound, which means higher Elongation ( % ) mileage before tire replacement. 300% modulus( Kg/Cm2) 100% modulus ( Kg/Cm2) • 41% higher rebound height provides a co

  35. Slide 35: Wet grip, ice grip and rolling resistance improvements

    KEY NOTES: Wet Grip: 41% Improvement with Gratomic graphene stacks Ice Grip: 53% Improvement with Gratomic graphene stacks RR1: 38% Improvement with Gratomic graphene stacks 1Lower tan delta value indicates significant decrease in rolling resistance, which increases in MPG CUSTOMER COMPOUND ZERO GRA

  36. Slide 36: Warrants outstanding

    Outstanding Outstanding Broker Warrants Exercise Price Expiry Date Warrants Warrants Warrants re November 24, 2017 FT Shares Private Placement $0.50 20-Nov-20 6,451,828 Broker Warrants re November 24, 2017 WC Private Placement $0.35 20-Nov-20 325,278 Warrants re August 10, 2018 WC Private Placement

  37. Slide 37: Risk Factors

    Risk Factors No mineral resources, let alone mineral reserves demonstrating economic viability and technical feasibility, have been delineated on the Aukam Property. The Company is not in a position to demonstrate or disclose any capital and/or operating costs that may be associated with the process

  38. Slide 38: Thank you for reading

    +1 416-561-4095 abrand@gratomic.ca www.gratomic.ca THANK YOU FOR READING Gratomic Inc. Please feel free to contact us via your preferred 130 Spadina Avenue, Toronto method if you have any questions. Ontario, M5V2L4 38

Gratomic — Investor Presentation (April 2020) on 6ix