Monument Mining Limited · TSXV:MMY
Monument Mining — Investor Presentation (April 2021)
23 slides from Monument Mining's investor presentation, Apr 8, 2021
Slide 1: Corporate Presentation
Corporate Presentation April 2021 TSX–V MMY
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation includes statements containing forward-looking information about Monument, its business and future plans (“forward-looking statements”). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not h
Slide 3: Corporate Summary
Corporate Summary Undervalued Gold Producer and Explorer • Producing Asset: Malaysia – 322 koz produced since 2010, 1mtpa plant, 6-yr LOM extension underway • Exploration Portfolio: Western Australia – existing resources, 260 ktpa gold plant on C&M • Resource Base (NI 43-101 compliant): 880 koz1 Sel
Slide 4: Board of Directors & Founder
Board of Directors & Founder Robert Baldock Graham Dickson Cathy Zhai FOUNDER Chairman of the Board Director, President & CEO Zaidi Harun Michael Kitney Dato’ Sia Hok Kiang Jean-Edgar de Trentinian Director Director Director Director TSX–V MMY 4
Slide 5: Core Operations
Core Operations Producing Asset - Malaysia Exploration/Development - Australia 322Koz Au PRODUCED Selinsing Gold Portfolio 150km2, 880 koz Murchison Gold Portfolio 233km2, 381 koz US$30m Sale of Mengapur TSX–V MMY 5
Slide 6: Investment Highlights
Investment Highlights Undervalued Gold Producer and Explorer Selinsing Gold Mine (Malaysia) PROVEN GOLD PRODUCER 11 years in production; 321,694 oz of gold produced as at Dec. 31 2020 Mineral Resources of 880 koz, including Mineral Reserves of 267 koz Au at 1.45 g/t Murchison Gold Portfolio (Wes
Slide 7: Implementing Long-Term Growth Strategy
Implementing Long-Term Growth Strategy Value Creation Through Expansion, Exploration and Acquisitions Build Production Through Targeted Acquisitions Augment current and future production via a suitable acquisition of a large-scale standalone gold project M&A Establish Murchison As Cornerstone Asse
Slide 8: Implementation Timeline & Milestones
Implementation Timeline & Milestones Strong News Flow Ahead Malaysia • Closed Mengapur Sale (April) • Flotation plant construction • Gold concentrate production Development decision for • Flotation pilot plant testing starts (late Aug) commences (June 2022) Biox Plant (April to June) • Flotation •
Slide 9: Corporate Social Responsibility
Corporate Social Responsibility Monument takes CSR very seriously and has organised and funded a number of programs within its local communities over the years. Top Left: Financial support for disability programs at the Selinsing Gold Mine Top Right: Sponsorship of a student excellence program at Su
Slide 10: Selinsing Gold Mine Malaysia
SELINSING GOLD MINE MALAYSIA TSX–V M MMMYY
Slide 11: Selinsing Gold Mine
Selinsing Gold Mine Low-Cost Producer with Growth Potential Historic Production Figures Selinsing Sulphide Expansion Feasibility Study Start of Production IRR 2010 49% Cash Costs Upfront Capex US$520 Per Ounce US$53M Mill Capacity LoM Production 1 Million Tpa 223 koz Gold Produced Cash Costs 321.7 k
Slide 12: Selinsing – Life of Mine Extension
Selinsing – Life of Mine Extension Phased Expansion Strategy with Reduction of Initial Capital by $35 Million Initial Flotation Concentrates CONCENTRATE FLOTATION PLANT Low capex first stage production Expected 12-18 month construction timeframe Production of gold concentrate for sale to smelt
Slide 13: Selinsing – Resource Replacement Strategy
Selinsing – Resource Replacement Strategy Significant Exploration Potential for Long Term Resource Growth Near-Mine Potential Existing sulphide resources at Selinsing / Buffalo Reef open at depth Additional near-surface oxide material around Peranggih open pits Regional Exploration Potential N
Slide 14: Murchison Portfolio Western Australia
MURCHISON PORTFOLIO WESTERN AUSTRALIA TSX–V M MMMYY
Slide 15: Murchison Portfolio
Murchison Portfolio Developing A Cornerstone Asset Monument has a highly prospective gold portfolio in WA • Burnakura, Gabanintha and 20% Tuckanarra free carried JV interest, historic resources of 644koz with 381 koz confirmed, multiple historical producing pits 500 koz delivered • Well maintained p
Slide 16: Murchison Portfolio
Murchison Portfolio Developing A Cornerstone Asset Development Strategy Three Prospective Tenements: • Burnakura 123.1km², 381 koz (NI 43-101), 260kpta CIL plant • Gabanintha 43.4km², 153 koz (JORC Historic) • Tuckanarra (20% MMY) 63.7km², 81 koz (JORC Historic) Exploration • AUD10m committed for tw
Slide 17: Murchison Portfolio - Burnakura
Murchison Portfolio - Burnakura Existing Plant & Infrastructure = Cash Generative Restart Option Burnakura Development • Option for plant expansion of up to 750ktpa production Infrastructure • Existing 260,000 tpa CIL processing plant well maintained with a fully commissioned operational camp ready
Slide 18: Mengapur Divestment
Mengapur Divestment TSX–V M MMMYY
Slide 19: Mengapur Divestment
Mengapur Divestment Divestment of Non-Core Copper and Iron Ore Asset • 100% owned Mengapur Copper and Iron Project in Pahang State, Malaysia • Sold as a part of asset restructure to focus on gold portfolio • Consideration of US$30,000,000 under Purchase and Sales arrangement closed April 2021 • Enti
Slide 20: Reserves & Resources
Reserves & Resources TSX–V M MMMYY
Slide 21: Selinsing Resources and Reserves
Selinsing Resources and Reserves *Proven Reserve is entirely stockpile material **Probable Oxide Reserve is a combination of in situ oxide material occurring in Selinsing and Buffalo Reef/Felda deposits plus Selinsing Old Tailings material; Probable Transition and Sulphide Reserve comprises in situ
Slide 22: Murchison Resources
Murchison Resources (1) Small discrepancies may occur due to rounding. (2) All Mineral Resources have been reported on a dry tonnage basis. (3) SRK is unaware of any issues that materially affect the Mineral Resources in a detrimental sense. (4) Mineral Resources that are not Mineral Reserves do not
Slide 23: Investor Relations Contact
Investor Relations Contact: Richard Cushing Monument Mining Ltd. T: +1-604-638-1661 x102 rcushing@monumentmining.com TSX–V MMY