Monument Mining Limited · TSXV:MMY

Monument Mining — Investor Presentation (April 2021)

23 slides from Monument Mining's investor presentation, Apr 8, 2021

  1. Slide 1: Corporate Presentation

    Corporate Presentation April 2021 TSX–V MMY

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation includes statements containing forward-looking information about Monument, its business and future plans (“forward-looking statements”). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not h

  3. Slide 3: Corporate Summary

    Corporate Summary Undervalued Gold Producer and Explorer • Producing Asset: Malaysia – 322 koz produced since 2010, 1mtpa plant, 6-yr LOM extension underway • Exploration Portfolio: Western Australia – existing resources, 260 ktpa gold plant on C&M • Resource Base (NI 43-101 compliant): 880 koz1 Sel

  4. Slide 4: Board of Directors & Founder

    Board of Directors & Founder Robert Baldock Graham Dickson Cathy Zhai FOUNDER Chairman of the Board Director, President & CEO Zaidi Harun Michael Kitney Dato’ Sia Hok Kiang Jean-Edgar de Trentinian Director Director Director Director TSX–V MMY 4

  5. Slide 5: Core Operations

    Core Operations Producing Asset - Malaysia Exploration/Development - Australia 322Koz Au PRODUCED Selinsing Gold Portfolio 150km2, 880 koz Murchison Gold Portfolio 233km2, 381 koz US$30m Sale of Mengapur TSX–V MMY 5

  6. Slide 6: Investment Highlights

    Investment Highlights Undervalued Gold Producer and Explorer Selinsing Gold Mine (Malaysia) PROVEN GOLD PRODUCER  11 years in production; 321,694 oz of gold produced as at Dec. 31 2020  Mineral Resources of 880 koz, including Mineral Reserves of 267 koz Au at 1.45 g/t Murchison Gold Portfolio (Wes

  7. Slide 7: Implementing Long-Term Growth Strategy

    Implementing Long-Term Growth Strategy Value Creation Through Expansion, Exploration and Acquisitions Build Production Through Targeted Acquisitions  Augment current and future production via a suitable acquisition of a large-scale standalone gold project M&A Establish Murchison As Cornerstone Asse

  8. Slide 8: Implementation Timeline & Milestones

    Implementation Timeline & Milestones Strong News Flow Ahead Malaysia • Closed Mengapur Sale (April) • Flotation plant construction • Gold concentrate production  Development decision for • Flotation pilot plant testing starts (late Aug) commences (June 2022) Biox Plant (April to June) • Flotation •

  9. Slide 9: Corporate Social Responsibility

    Corporate Social Responsibility Monument takes CSR very seriously and has organised and funded a number of programs within its local communities over the years. Top Left: Financial support for disability programs at the Selinsing Gold Mine Top Right: Sponsorship of a student excellence program at Su

  10. Slide 10: Selinsing Gold Mine Malaysia

    SELINSING GOLD MINE MALAYSIA TSX–V M MMMYY

  11. Slide 11: Selinsing Gold Mine

    Selinsing Gold Mine Low-Cost Producer with Growth Potential Historic Production Figures Selinsing Sulphide Expansion Feasibility Study Start of Production IRR 2010 49% Cash Costs Upfront Capex US$520 Per Ounce US$53M Mill Capacity LoM Production 1 Million Tpa 223 koz Gold Produced Cash Costs 321.7 k

  12. Slide 12: Selinsing – Life of Mine Extension

    Selinsing – Life of Mine Extension Phased Expansion Strategy with Reduction of Initial Capital by $35 Million Initial Flotation Concentrates CONCENTRATE FLOTATION PLANT  Low capex first stage production  Expected 12-18 month construction timeframe  Production of gold concentrate for sale to smelt

  13. Slide 13: Selinsing – Resource Replacement Strategy

    Selinsing – Resource Replacement Strategy Significant Exploration Potential for Long Term Resource Growth Near-Mine Potential  Existing sulphide resources at Selinsing / Buffalo Reef open at depth  Additional near-surface oxide material around Peranggih open pits Regional Exploration Potential  N

  14. Slide 14: Murchison Portfolio Western Australia

    MURCHISON PORTFOLIO WESTERN AUSTRALIA TSX–V M MMMYY

  15. Slide 15: Murchison Portfolio

    Murchison Portfolio Developing A Cornerstone Asset Monument has a highly prospective gold portfolio in WA • Burnakura, Gabanintha and 20% Tuckanarra free carried JV interest, historic resources of 644koz with 381 koz confirmed, multiple historical producing pits 500 koz delivered • Well maintained p

  16. Slide 16: Murchison Portfolio

    Murchison Portfolio Developing A Cornerstone Asset Development Strategy Three Prospective Tenements: • Burnakura 123.1km², 381 koz (NI 43-101), 260kpta CIL plant • Gabanintha 43.4km², 153 koz (JORC Historic) • Tuckanarra (20% MMY) 63.7km², 81 koz (JORC Historic) Exploration • AUD10m committed for tw

  17. Slide 17: Murchison Portfolio - Burnakura

    Murchison Portfolio - Burnakura Existing Plant & Infrastructure = Cash Generative Restart Option Burnakura Development • Option for plant expansion of up to 750ktpa production Infrastructure • Existing 260,000 tpa CIL processing plant well maintained with a fully commissioned operational camp ready

  18. Slide 18: Mengapur Divestment

    Mengapur Divestment TSX–V M MMMYY

  19. Slide 19: Mengapur Divestment

    Mengapur Divestment Divestment of Non-Core Copper and Iron Ore Asset • 100% owned Mengapur Copper and Iron Project in Pahang State, Malaysia • Sold as a part of asset restructure to focus on gold portfolio • Consideration of US$30,000,000 under Purchase and Sales arrangement closed April 2021 • Enti

  20. Slide 20: Reserves & Resources

    Reserves & Resources TSX–V M MMMYY

  21. Slide 21: Selinsing Resources and Reserves

    Selinsing Resources and Reserves *Proven Reserve is entirely stockpile material **Probable Oxide Reserve is a combination of in situ oxide material occurring in Selinsing and Buffalo Reef/Felda deposits plus Selinsing Old Tailings material; Probable Transition and Sulphide Reserve comprises in situ

  22. Slide 22: Murchison Resources

    Murchison Resources (1) Small discrepancies may occur due to rounding. (2) All Mineral Resources have been reported on a dry tonnage basis. (3) SRK is unaware of any issues that materially affect the Mineral Resources in a detrimental sense. (4) Mineral Resources that are not Mineral Reserves do not

  23. Slide 23: Investor Relations Contact

    Investor Relations Contact: Richard Cushing Monument Mining Ltd. T: +1-604-638-1661 x102 rcushing@monumentmining.com TSX–V MMY

Monument Mining — Investor Presentation (April 2021) on 6ix