Monument Mining Limited · TSXV:MMY
Monument Mining — Investor Presentation (June 2024)
28 slides from Monument Mining's investor presentation, Jun 20, 2024
Slide 1: Increasing Value through Corporate Development
Increasing Value through Corporate Development June 2024 Corporate Presentation TSX–V MMY
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation includes statements containing forward-looking statements or forward-looking information under applicable Canadian securities laws (hereinafter collectively referred to as “forward-looking statements”) about Monument, its business and future plans. Forwar
Slide 3: Monument Mining Limited
Monument Mining Limited Gold Producer and Developer ▪ Active business development program for future Mineral Resource and production growth ▪ Malaysia-Selinsing Gold Mine- In production since 2010 with 362,914 oz produced to date (March 31, 2024);NI 43-101 Resources of 880 koz1 ▪ Western Australia-M
Slide 4: Corporate Profile
Corporate Profile Capital Structure Graham Dickson (Chairman) Mining executive with over 35 years of experience. President of NouHgt Listed on TSX Venture Symbol: MMY Listed on Frankfurt Symbol: D7Q1 Technologies Inc. since 2011, and former Director and COO at Veris Gold Corp., was a 150koz p.a.+ go
Slide 5: Projects Overview
Projects Overview Producing Asset - Malaysia Exploration/Development - Australia 362,914 oz Au PRODUCED Selinsing Gold Portfolio 150km2 880 koz Murchison Gold Portfolio 230km2 381 koz TSX–V MMY 5
Slide 6: Investment Highlights
Investment Highlights Undervalued Gold Producer and Developer Selinsing Gold Mine: Oxides PROVEN GOLD PRODUCER ▪ Commercial production September 2010 to November 2022 ▪ Total historical oxide production of 336.5 koz with cash costs of US$583/oz and revenue of US$477.2m ▪ Potential for future oxide d
Slide 7: Implementing Growth Strategy
Implementing Growth Strategy Value Creation Through Corporate Development, Exploration and Expansion Corporate Development ▪ Disciplined acquisition to increase the Company’s gold production profile ▪ Targeting a new large asset; near-term production ▪ Leveraging off Monument’s in-house capabilities
Slide 8: Selinsing Gold Mine Malaysia
SELINSING GOLD MINE MALAYSIA TSX–V M MMMYY
Slide 9: Selinsing Resources and Reserves
Selinsing Resources and Reserves *Proven Reserve is entirely stockpile material **Probable Oxide Reserve is a combination of in situ oxide material occurring in Selinsing and Buffalo Reef/Felda deposits plus Selinsing Old Tailings material; Probable Transition and Sulphide Reserve comprises in situ
Slide 10: Achieving Milestones at Selinsing Gold Mine
Achieving Milestones at Selinsing Gold Mine June 2007 Oct 2009 Sept 2010 Jan 2019 Oct 2019 Mar 2022 Dec 2022 June 2023 Sept 2023 Selinsing First gold from First gold from Sulphide 1000th gold bar Sulphide plant Sulphide plant First Commercial acquired gravity circuit CIL circuit Feasibility produced
Slide 11: Peer TSX Producers
Peer TSX Producers 180 90 160 80 TSXV:RBX 140 TSX:MND 70 TSX:JAG 120 60 koz Au 100 50 US$m 80 40 60 30 40 20 TSXV:SOMA TSXV:MMY 20 10 TSX:ORV TSXV:CERT 0 0 Robex Resources Mandalay Jaguar Mining Soma Gold Corp Monument Orvana Minerals Cerrado Gold Inc Inc Resources Corp Inc Mining Ltd Corp Market ca
Slide 12: Selinsing Gold Portfolio
Selinsing Gold Portfolio Central Gold Belt of Western Malaysia Historic Production Figures1 ▪ 158 km north of Kuala Lumpur ▪ Total tenement area of 150 km2 Start of Commercial ▪ Consists of the Selinsing, Buffalo Reef, Felda Land, Production Sept 2010 Peranggih and Famehub properties Oxide CIL Plant
Slide 13: Selinsing-Flotation Plant
Selinsing-Flotation Plant Transitioned to Sulphide Gold Treatment with flotation plant and mine development ▪ Development included: flotation plant construction, upgrading tailing storage facilities, pit push backs, river diversion, and pre-stripping ▪ Low Capex construction (US$18.2m) completed in
Slide 14: Selinsing-Sulphide Gold Flotation Plant Process
Selinsing-Sulphide Gold Flotation Plant Process TSX–V MMY 14
Slide 15: Production Back Up at Selinsing
Production Back Up at Selinsing TSX–V MMY 15
Slide 16: Selinsing – Resource Growth Potential
Selinsing – Resource Growth Potential Significant Exploration Potential for Long Term Resource Growth Near-Mine Potential ▪ Existing sulphide Mineral Resources at Selinsing / Buffalo Reef open at depth ▪ Additional near-surface oxide material around Peranggih open pits Regional Exploration Potential
Slide 17: Selinsing – Open at depth and along strike
Selinsing – Open at depth and along strike Potential Resource and Reserve growth under and surrounding the current open pit areas ▪ Sulphide mineralization at Selinsing and Buffalo Reef deposits is still open down dip and along strike ▪ Future drill programs will focus on adding Resources and defini
Slide 18: Murchison Portfolio Western Australia
MURCHISON PORTFOLIO WESTERN AUSTRALIA TSX–V M MMMYY
Slide 19: Murchison Resources
Murchison Resources (1) Small discrepancies may occur due to rounding. (2) All Mineral Resources have been reported on a dry tonnage basis. (3) SRK is unaware of any issues that materially affect the Mineral Resources in a detrimental sense. (4) Mineral Resources that are not Mineral Reserves do not
Slide 20: Murchison Portfolio
Murchison Portfolio Unlocking Value in Western Australia Jurisdiction: Western Australia is one of World’s best mining jurisdictions* Historic Production: Murchison region has yielded >15 moz, and MMY tenements approx. 0.5 moz Competition: Multiple companies actively mining & exploring in the distri
Slide 21: Murchison Portfolio - Burnakura
Murchison Portfolio - Burnakura Strategic Asset: Existing Plant & Infrastructure Burnakura Development ▪ Reviewing and updating scoping study for production opportunities ▪ Option for plant expansion of up to 750 ktpa production Infrastructure Burnakura Gold Plant Burnakura Mine camp ▪ Existing 260,
Slide 22: Murchison Portfolio - Gabanintha
Murchison Portfolio - Gabanintha Gabanintha Development ▪ Reviewing historical maps and reports for Gabanintha project ▪ Additional pit mapping and structural interpretation of the main Gabanintha pit area will be completed to assist in drill hole targeting underneath the existing pits Historical Re
Slide 23: Tuckanarra Joint Venture
Tuckanarra Joint Venture Strategic Collaboration ▪ 80% interest sold in Dec 2020 for A$5m and 1% NSR to ASX- listed Odyssey Gold Ltd (A$16m market cap as of June 20, 2024) ▪ Monument 20% free-carried interest until a ‘decision to mine’1 ▪ JV provides opportunity for any ore mined by Odyssey at Tucka
Slide 24: Murchison Exploration Program
Murchison Exploration Program Exploration identified new gold discoveries for future drill programs Expanding the resource inventory to unlock value ▪ Phase 1 RC and AC drill program results confirm discovery of new high-grade mineralization at the Junction Target (3 m at 10.2 g/t Au including 1 m a
Slide 25: Murchison Phase 1 and Phase 2 Target Areas
Murchison Phase 1 and Phase 2 Target Areas TSX–V MMY 25
Slide 26: NOA Group Long Section
NOA Group Long Section NOA Group Long Section Looking West showing recent and historic drilling (Drillhole ID is grey font) with pierce point locations of the primary intercepts shown in bold. RC drilling significant intercepts are shown in white boxes and DD significant intercepts are shown in yell
Slide 27: Corporate Social Responsibility
Corporate Social Responsibility ▪ The Selinsing Gold Mine has been a leader in the gold industry in Malaysia, a good corporate citizen in Pahang State, and has been a strong contributor to Pahang’s economy. ▪ Monument has organized and funded a number of local community programs over the years, whic
Slide 28: Investor Relations Contact
Investor Relations Contact: Richard Cushing Monument Mining Ltd. T: +1-604-638-1661 x102 rcushing@monumentmining.com TSX–V MMY