Slide 1: Annual General Meeting
Annual General Meeting 26 November 2014
Slide 2: Regulatory & Compliance Disclaimer
Regulatory & Compliance Disclaimer This presentation contains reference to certain plans of Tungsten Mining NL which may or may not be achieved. The performance and operations of Tungsten Mining NL may be influenced by a number of factors, uncertainties and contingencies many of which are outside th
Slide 3: Corporate
Corporate Issued Securities Board and Senior Management Ordinary Shares (TGN) 213M Patrick McManus – Non-executive Chairman Issued Options 17M Gary Lyons – Non-executive Director Chew Wai Chuen – Non-executive Director Major Shareholders Kong Leng Lee (Jimmy) – Non-executive Director GWR Group Ltd 1
Slide 4: 2014 Milestones
2014 Milestones Successful completion of $4.6m capital raising New cornerstone shareholders including GWR Group Restructure of board and management Completion of Phase 1 and 2 infill drilling program at Kilba Metallurgical test work and project studies underway Seabrook Rare Metals Ventu
Slide 5: Gascoyne Project
Gascoyne Project Gascoyne Project consists of 178km2 of granted tenements. Known tungsten occurrences at Kilba, Loves Find and Whiskey Pool. Work on Kilba in 2012/2013 defined a Maiden Indicated and Inferred Mineral Resource at Zone 8 and 11. In 2014 TGN has completed a phased drilling progr
Slide 6: Kilba Project – Phase 1 Drilling
Kilba Project – Phase 1 Drilling In August/September TGN completed 53 reverse circulation (RC) hole to infill key high-grade areas at Zone 11 and conduct first-pass drilling of Zone 8 and 12 (Refer to ASX announcement; 7 October 2014). Results from drilling confirm continuity of tungsten mineral
Slide 7: Phase 1 – Zone 11
Phase 1 – Zone 11 Phase 1 drilling at Zone 11 consisted of infilling sections to a 40 metre spacing for high-grade zones of the Mineral Resource. Drilling confirmed continuity of high-grade tungsten mineralisation and justified completion of infill drilling over the entire 1.2 kilometres of stri
Slide 8: Phase 1 – Zone 11 Results
Phase 1 – Zone 11 Results Better results from Zone 11 are as follows: Kilba Project, RC Drilling (>0.10 % WO3) MGA Coordinates Intersections Hole No Easting (m) Northing (m) Depth (m) Dip/Azim From (m) To (m) Interval (m) WO3% KRC0043 350,408 7,479,906 65 -60/020 23 36 13 0.33 KRC0046 350,355 7,47
Slide 9: Zone 11 – Summary Plan
A Sage G eve tungsten Mmimingne ABN 67 152 084 403 Kilba\Project)Zone/11\* Eocene "Phase te}2"Drilling \November, 20/14} 49g)014 DRILLING : ; RC Hole - Drilled : eee, DD Twin Hole : PQ Met Hole 2012/2013 DRILLING ©& Diamond Hole © RC Hole SKARN UNITS Outline TOPOGRAPHY |—— 5m contours 7,480,400 7,48
Slide 10: Zone 11 – Eastern Domain
wae Zone 11 — Eastern Domain utien Mmimingne ABN 67 152 084 403 Kilba Project - Zone 11 Section C- D D mn Histograms Lithology wy a MM 0.025-0.05%wo3 [1 Granite Ke 0 25 50 75m HM 0.05 0.1% wo3 o Target Horizon tungsten —_—_————— — eyeauend BB Hangingwalt mining. @ >0.5% wos
Slide 11: Zone 11 – Central Domain
Sa ee ey* Zone 11 — Central Domain tungsten Mmimingne ABN 67 152 084 403 Kilba Project - Zone 11 Section A- B ann Histograms _Lithology ie ye WM 0.025 -0.05%wo3 2) Granite _ HM 0.05 -0.1% wos © Target Horizon re a ee 01-03% W0r EE Hongingwat HM 03-05% wo3 Ge 05% wos tungsten mining.
Slide 12: Phase 1 – Zone 8
Phase 1 – Zone 8 Seven holes for 726m were drilled in Phase 1 and intersected thick zones of tungsten mineralisation (Section E–F). Geological mapping identified strike extensions to Zone 8 and indicates excellent potential to increase the Zone 8 Mineral Resource. Better results from Zone 11 a
Slide 13: Zone 8 – Summary Plan
351,300 LEGEND 2014 DRILLING 7,480,400 | + RCHole SKARN UNITS Outline H @ DDTwin Hole } @ PQMetHole ll TOPOGRAPHY | 4 —— 5m contours 7,480,300 7,480,200 2014 Drilling | Phase 1 holes - labelled & Phase 2 holes - No labels 351,500 Projectszone\s) 2014'Drilling| 351,800 351,800 7,480,100 7,480,300 7,4
Slide 14: Zone 8 Cross Section
wae Zone 8 Cross Section utien Mmimingne ABN 67 152 084 403 Kilba Project - Zone 8 Section E - F lf & $ Granite ns Histograms Lithology Sue, MM 0.025 -0.05%wo3 I Granite ae 0 25 50 75m HI 0.05 0.1% wo3 [1 Target Horizon tungsten eS — area Hangingwalt = GH >0.5% wos
Slide 15: Phase 1 – Zone 12
Phase 1 – Zone 12 Multiple skarns identified over 800m of strike and potential for blind mineralisation under colluvium/alluvium to the southwest. A total of 9 holes for 841m were drilled over 250m of strike and intersected multiple zones of weak scheelite mineralisation. Better results from 1
Slide 16: Kilba – Phase 2 Drilling
Kilba – Phase 2 Drilling A total of 62 RC holes (5087m) and 13 diamond holes (685m) were drilled in October/November 2014. Phase 2 drilling has completed the 40 metre spaced drill out of the Strategic Planning Envelope defined by CSA Global at Zone 8 and Zone 11. Diamond drilling was designed
Slide 17: Work Forward Program
Work Forward Program Update of geological model for Kilba based on Phase 1 and 2 drilling and Mineral Resource Update (December) Completion of Sighter Metallurgical test work program at Nagrom Finalise feasibility study scope and commission process design and metallurgical test work Progress