Taseko Mines Limited · TSX:TKO
Taseko Mines — Investor Presentation (December 2013)
27 slides from Taseko Mines's investor presentation, December 2013

Slide 1: Building Value Through Operating and Developing Major Mining Projects
Building Value Through Operating and Developing Major Mining Projects December 2013 1

Slide 2: Forward Looking Statement
Forward Looking Statement Some of the statements contained in the following material are "forward‐ looking statements". All statements in this release, other than statements of historical facts, that address estimated mineral resource and reserve quantities, grades and contained metal, and possible

Slide 3: The Taseko Advantage
The Taseko Advantage Major Producing Operating the second largest open pit copper mine in Canada and fourth largest in Copper Mine Provides North America Strong Cash Flow Increasing Production 4.1 billion lbs of recoverable copper and 60 million lbs of molybdenum 25 year mine life Recently Completed

Slide 4: Diversified Asset Base
Diversified Asset Base Aley (Nb) Metallurgical testwork being Gibraltar (Cu‐Mo) completed World class, modernized, open British Feasibility Study complete in pit mine 2013 165 M lbs annual production Columbia 25 Year Mine life Aley New Prosperity (Cu‐Au) Mackenzie Canadian Environmental Assessment P

Slide 5: Gibraltar Copper/Moly Mine
Gibraltar Copper/Moly Mine Canada’s Second Largest Open‐Pit Copper Mine Location: 65 km north of Williams Lake, British Columbia Ownership: 75% 4.1 billion pounds recoverable copper Mineral Reserves: 60 million pounds recoverable molybdenum Reserves Update (Dec 2012: 770m tons at 0.34% copper equiva

Slide 6: Gibraltar Copper/Moly Mine
Gibraltar Copper/Moly Mine GDP3 – Completed On Time and On Budget 50% capacity increase from construction of a new concentrator and molybdenum plant Mine now feeds two independent copper concentrators, providing increased operational flexibility and synergies Simple payback of three years, based on

Slide 7: Increasing Production Led by Continuous Investment
Gibraltar Copper/Moly Mine Increasing Production Led by Continuous Investment 100 101,000 / Operating Day Capacity per Calendar Day Tons Per Operating Day 91,500 / Calendar Day Daily Mill Throughput (000s Tons) Tons Per Calendar Day $325 75 million +55% $224 million $76 million +20% 25% 50 25 0 H1 0

Slide 8: Taseko's Growth Strategy
Taseko’s Growth Strategy Disciplined Investments in Diversified Project Pipeline Use free cash flow generated by Gibraltar to advance near‐term projects: • 13.3 Million ounces of Gold • 2nd largest niobium deposit in the world • 5.3 billion pounds of Copper • 739 million kilograms contained niobium

Slide 9: New Prosperity
New Prosperity One of the Largest Gold/Copper Porphyries in the World Location: 125 km south west of Williams Lake, British Columbia Ownership: 100% 7.7 million ounces recoverable gold Mineral Reserves: 3.6 billion pounds recoverable copper Mine Type: Open‐pit, 70,000 tpd mill throughput Mine Life:

Slide 10: New Prosperity: Robust Economics
New Prosperity Robust Economics Economics Revised Economic Study completed in January 2011 Preliminary capital cost estimate of C$1 billion (excluding mining equipment) Operating cost of C$8.35 per tonne milled Total cash costs of negative US$125/oz au, net of BPCs at US$2.50 cu Net Present Value (5

Slide 11: New Prosperity: Environmental Assessment Review
New Prosperity Environmental Assessment Review Taseko submitted Environmental Impact Statement (EIS) on September 20, 2012 EIS determined sufficient on June 20, 2013 Panel Hearings held July 22 – August 23, 2013 Panel Report issued on October 31, 2013 Taseko commences federal judicial review on Dece

Slide 12: New Prosperity: October Panel Report
New Prosperity October 31 Panel Report Panel relied on a Natural Resource Canada (NRCAN) assessment of the plan that was NOT Taseko’s plan. Natural Resources Canada based their opinion on the wrong TSF design, not on the TSF design proposed by Taseko for New Prosperity. The Panel then relied on thes

Slide 13: New Prosperity: The Mistake and the Reality
New Prosperity The Mistake and the Reality NRCAN assumed there was no low permeability basin liner for the TSF and that seepage would therefore readily leak into more pervious overburden and fractured bedrock. The New Prosperity TSF not only includes a continuous low permeability liner, but that the

Slide 14: Aley Niobium Project
Aley Niobium Project Accretive Development Opportunity Location: Northern British Columbia Ownership: 100% Mine Type: Open Pit, 10,000 tpd mill throughput Mine Life: +20 years Project Highlights 739 million kilograms of contained niobium* 2nd largest niobium deposit in the world Open pit, bulk minin

Slide 15: Aley Niobium Project: Niobium
Aley Niobium Project Niobium Specifically used in manufacturing high strength, low alloy steels Green technologies, turbines, aerospace, automobile steels, oil and gas Global annual consumption of ferro‐niobium is 210 million lbs/year Growing at 5‐7% per year Current pricing of FeNb is $40/kg 3 prod

Slide 16: Highly Levered to Copper
Highly Levered to Copper “Taseko is the most copper‐levered stock in our universe. For a $0.25/lb increase in our long‐term price of $2.75/lb, TKO exhibits a 23% increase in LOM EBITDA. While TKO remains best‐suited to benefit from appreciating copper prices, the company is also protected on the dow

Slide 17: Significant Intrinsic Value
Significant Intrinsic Value Asset Valuation ($m) Mineral Assets Gibraltar – After Tax (75%) $ 1,000 Prosperity – After Tax (100%) $ 2,320 Aley (100%) $ 270 Harmony (100%) $ 195 Mineral Assets Total $ 3,785 Financial Assets Cash & Cash Equivalents $ 80 Long-term Debt $ (252) Financial Assets Total $

Slide 18: Appendix
Appendix 18

Slide 19: Gibraltar - One Mine, Two Concentrators
Gibraltar ‐ One Mine, Two Concentrators 60”x89” Primary Distributor Crusher 34’ SAG Mill Ball Mill Ball Mill Ball Mill Ball Mill Ball Mill Ball Mill Concentrator #1 55,000 tpd Rougher Flotation – OK160 Cells Molybdenum Concentrate Regrind – Copper Mo Tower Mill Concentrate Separation Cleaner Cells –

Slide 20: Participation & Cooperation Agreement with Williams Lake Indian Band
Gibraltar Copper/Moly Mine Participation & Cooperation Agreement with Williams Lake Indian Band The purpose of the agreement is to enhance understanding, communication and cooperation between the parties Aligned interests will ensure Gibraltar continues to generate local value and opportunity Agreem

Slide 21: Exploration Agreement with Tsay Keh Dene
Aley Niobium Project Exploration Agreement with Tsay Keh Dene Foundation for long term cooperation and mutual benefit for Tsay Keh Dene and Taseko Agreement supports Taseko’s exploration program Provides employment and training opportunities for Tsay Keh Dene members Environmental protection through

Slide 22: New Prosperity Revised Project Layout (January 2011)
New Prosperity Revised Project Layout (January 2011) Tailings Facility Plant Site Overburden and Rock Stockpile Ore Stockpile Fish Lake Open Pit 22

Slide 23: Key Accomplishments
Key Accomplishments Apr 2013 First concentrate produced from Gibraltar concentrator #2 Apr 2013 Taseko signs Participation and Cooperation agreement with Williams Lake Indian Band Dec 2012 Gibraltar Mine signs long‐term labour agreement Nov 2012 2012 Q3 gross profit of $12 million Oct 2012 Gibraltar

Slide 24: Share Structure
Share Structure Cash on Hand: C$80 million (September 30, 2013) Listed: TSX; TKO / NYSE MKT; TGB S&P/TSX Composite : S&P/TSX Small Cap Indices: S&P/TSX Global Mining : S&P/TSX Global Base Metals Shares Outstanding: 192.8 million Market Capitalization: ~$400 million 52 Week High/Low: C$3.48/C$1.88; U

Slide 25: Experienced Management Team
Experienced Management Team Russell Hallbauer, P. Eng ‐ President & CEO and Director – Mr. Hallbauer is a professional engineer with over 35 years of mining experience. He has a strong background in open pit and underground mining, overseeing operating joint ventures and revitalizing mines to profit

Slide 26: Experienced Management Team
Experienced Management Team Brian Bergot ‐ Director, Investor Relations – Mr. Bergot has over 20 years of experience in the natural resources sector, holding a number of corporate and operational roles, the last ten years of which have been focused in the investor relations field. Tom Broddy ‐ Manag

Slide 27: Reserves & Resources
Reserves & Resources New Prosperity Mineral Reserves @ C$5.50 NSR/t Cut-Off1 The mineral resource and reserve estimations were completed by Taseko staff under the supervision of Scott Recoverable Contained Jones, P.Eng., Vice-President, Engineering and a Qualified Grade Size M Metal Metal Person und
Source: Internet Archive copy of tasekomines.com
More decks from Taseko Mines Limited
Trekor Metals — Investor Presentation (November 2026)42 slides · November 2026
Trekor Metals — Technical Presentation (October 2026)54 slides · Oct 8, 2026
Trekor Metals — Investor Presentation (October 2026)42 slides · October 2026
Trekor Metals — Investor Presentation (September 2026)40 slides · September 2026
Investor Presentation (April 2026)40 slides · April 2026
Investor Presentation (January 2026)41 slides · January 2026