Rathdowney Resources Ltd. · TSXV:RTH

Rathdowney Resources — Investor Presentation (August 2015)

25 slides from Rathdowney Resources's investor presentation, August 2015

  1. Slide 1: August 2015

    TSX-V: RTH August 2015

  2. Slide 2: Cautionary and Forward Looking Information

    Cautionary and Forward Looking Information This presentation includes certain statements that may be deemed "forward-looking statements". All information contained in this presentation relating to the contents of the Preliminary Economic Assessment (PEA) of the Olza zinc-lead project (Project Olza)

  3. Slide 3: Preliminary Economic Assessment Key Results

    Preliminary Economic Assessment Key Results (US dollars and metric units)  Robust returns and low production costs  $227M initial capital cost  $51M sustaining capital  $69.88/t total operating cost  Conventional 6,000 tpd underground mine with twin decline access  Based on median consensus me

  4. Slide 4: Preliminary Economic Assessment

    Preliminary Economic Assessment 4

  5. Slide 5: Preliminary Economic Assessment

    Preliminary Economic Assessment Capital Cost Initial ($M) Sustaining ($M) Total LOM($M) Mining 82.3 36.6 118.9 Processing 59.7 - 59.7 Tailings Management & Water Treatment Facilities 33.1 14.5 47.6 Surface Facilities 15.7 - 15.7 Contingency 23.1 - 23.1 EPCM 13.1 - 13.1 Sub-Total 227.0 51.1 278.1 Rec

  6. Slide 6: Advancing Project Olza

    Advancing Project Olza Successful Initial Program  Confirms presence of significant mineral resources 24.4 Mt grading 7.08% Zn+Pb* in inferred category  Indicates important silver content yet to be realized  Excellent potential for additional resources  preliminary metallurgy shows standard flot

  7. Slide 7: Current Program

    Current Program Designed to advance mine planning and permitting  Extensive hydrology & hydrogeology studies (600 km2 area)  Comprehensive flora and fauna data collection (250 km2 area)  Land use assessments  Engineering and mine planning studies to support Feasibility Study 7

  8. Slide 8: Current Program

    Current Program Results from new drilling is adding key engineering data and confirming potential to increase resources Highlights include:  Hole OLZ-241: 3.3 m of 16.0% Zn+Pb incl 1.3 m of 36.9% Zn+Pb  Hole OLZ-232: 8.5 m of 4.77% Zn+Pb, 12.8 g/t Ag incl 2.1 m of 17.9% Zn+Pb, 36.8 g/t Ag  Hole O

  9. Slide 9: Proactive and Ongoing Stakeholder Engagement

    Proactive and Ongoing Stakeholder Engagement 9

  10. Slide 10: Project Olza Milestones – Completed and Projected

    Project Olza Milestones – Completed and Projected • Acquire >150 sq km concessions  ACQUISITION & 2010-2011 • Collate and assess historical project database  PLANNING • Assemble experienced project team  • Complete 28,000 m confirmation drilling program  RESOURCE 2011-2012 • Announce substantial

  11. Slide 11: Forecast Timeline Based on Permitting Process in Poland

    Forecast Timeline Based on Permitting Process in Poland  Property Folio/Geological Documentation – 13 volumes of current and historical geological data  Environmental Impact Assessment (EIA) – data collection and studies underway  Baseline data collection – 18 months  Project Description develop

  12. Slide 12: Share Capital Structure & Enterprise Value

    Share Capital Structure & Enterprise Value  Listed March 2011 on TSX:V ticker RTH C$34 million fundraising  118.08 million common shares outstanding  4.77 million options outstanding 12

  13. Slide 13: Management and Directors

    Management and Directors David J. Copeland (Chairman) Dave Copeland is a professional engineer and mining executive with over 30 years' experience in advancing mineral projects through feasibility, permitting, engineering design and initial development phases. Mr. Copeland is a Director of Hunter Di

  14. Slide 14: Technical Managers, Consultants & Advisors

    Technical Managers, Consultants & Advisors TECHNICAL MANAGERS Lena Brommeland (General Manager, Poland) Lena Brommeland has a degree in geology and more than 20 years’ experience managing major exploration projects in Alaska, British Columbia and around the world. Her experience includes managing on

  15. Slide 15: Appendix

    moe | HDOWNEY APPENDIX

  16. Slide 16: Preliminary Economic Assessment Qualified Persons

    Preliminary Economic Assessment Qualified Persons Qualified Person Company Professional Designation Sections of the Report Project Management and Christopher Bray BEng, MAusIMM(CP) Mining BSc (Hons), MSc, PhD, Dr Lucy Roberts Mineral Resource MAusIMM (CP) Geology, Sampling and Dr Christopher Bonson

  17. Slide 17: Current Mineral Resource

    Current Mineral Resource Project Olza Inferred Mineral Resources Cut-off Tonnes Zn Pb Zn+Pb Contained Zn Contained Pb Zn% (millions) (%) (%) (%) (millions lb) (millions lb) 2.0 24.4 5.53 1.49 7.02 2,975 802 3.0 18.8 6.43 1.59 8.02 2,660 658 4.0 14.1 7.42 1.70 9.12 2,304 528 5.0 10.4 8.44 1.81 10.25

  18. Slide 18: PEA Conceptual UG Mine Layout and Stope Access

    PEA Conceptual UG Mine Layout and Stope Access Source: PEA Technical Report 18

  19. Slide 19: PEA Metallurgy and Process Design

    PEA Metallurgy and Process Design  Standard flotation results in marketable zinc and lead concentrates, recoveries of  89% LOM zinc recovery producing 56% zinc concentrate  88.5% LOM lead recovery producing 70% lead concentrate Simplified Process Flow Sheet Source: PEA Technical Report 19

  20. Slide 20: Established Mining and Refining Infrastructure

    Established Mining and Refining Infrastructure * Rodaki-Rokinto-Szlacheckie 20

  21. Slide 21: Zinc Smelters in Europe

    Zinc Smelters in Europe AMPLE OPPORTUNITIES FOR CONCENTRATE SALES 21

  22. Slide 22: Expandable Resource Base

    Expandable Resource Base See next page for additional details on historical estimates 22

  23. Slide 23: Historical Estimates for Zawiercie Property

    Historical Estimates for Zawiercie Property Zawiercie Historical Estimates by PGI Year of Number of Metres Period of Deposit Category Mt % Zn % Pb Estimate Holes Drilled Drilling 2008 C-1 + C-2 17.0 5.80 2.32 1994 C-1 16.3 6.00 2.50 Most Zawiercie I 1990 510 Unknown C-1 34.5 4.92 1.98 pre-1975 1977

  24. Slide 24: Current Program – Drill Results

    Current Program – Drill Results Drill Hole From To Length Zn+Pb Zn Pb Ag Number (m) (m) (m) * (%) (%) (%) (g/t) OLZ-226 99.00 99.50 0.50 1.32 0.61 0.71 3.4 102.70 106.30 3.60 1.76 0.95 0.81 2.4 incl 102.70 104.00 1.30 2.71 1.12 1.59 4.0 OLZ-228 97.90 103.90 6.00 2.77 2.56 0.21 9.0 incl 97.90 100.30

  25. Slide 25: Contact Information

    Contact Information Rathdowney Resources Head Office Investor Services 15th Floor Phone: 604.684.6365 1040 W. Georgia Street TF: 800.667.2114 Vancouver, BC www.rathdowneyresources.com Canada V6E 4H1

Rathdowney Resources — Investor Presentation (August 2015) on 6ix