Rathdowney Resources Ltd. · TSXV:RTH
Rathdowney Resources — Investor Presentation (August 2015)
25 slides from Rathdowney Resources's investor presentation, August 2015
Slide 1: August 2015
TSX-V: RTH August 2015
Slide 2: Cautionary and Forward Looking Information
Cautionary and Forward Looking Information This presentation includes certain statements that may be deemed "forward-looking statements". All information contained in this presentation relating to the contents of the Preliminary Economic Assessment (PEA) of the Olza zinc-lead project (Project Olza)
Slide 3: Preliminary Economic Assessment Key Results
Preliminary Economic Assessment Key Results (US dollars and metric units) Robust returns and low production costs $227M initial capital cost $51M sustaining capital $69.88/t total operating cost Conventional 6,000 tpd underground mine with twin decline access Based on median consensus me
Slide 4: Preliminary Economic Assessment
Preliminary Economic Assessment 4
Slide 5: Preliminary Economic Assessment
Preliminary Economic Assessment Capital Cost Initial ($M) Sustaining ($M) Total LOM($M) Mining 82.3 36.6 118.9 Processing 59.7 - 59.7 Tailings Management & Water Treatment Facilities 33.1 14.5 47.6 Surface Facilities 15.7 - 15.7 Contingency 23.1 - 23.1 EPCM 13.1 - 13.1 Sub-Total 227.0 51.1 278.1 Rec
Slide 6: Advancing Project Olza
Advancing Project Olza Successful Initial Program Confirms presence of significant mineral resources 24.4 Mt grading 7.08% Zn+Pb* in inferred category Indicates important silver content yet to be realized Excellent potential for additional resources preliminary metallurgy shows standard flot
Slide 7: Current Program
Current Program Designed to advance mine planning and permitting Extensive hydrology & hydrogeology studies (600 km2 area) Comprehensive flora and fauna data collection (250 km2 area) Land use assessments Engineering and mine planning studies to support Feasibility Study 7
Slide 8: Current Program
Current Program Results from new drilling is adding key engineering data and confirming potential to increase resources Highlights include: Hole OLZ-241: 3.3 m of 16.0% Zn+Pb incl 1.3 m of 36.9% Zn+Pb Hole OLZ-232: 8.5 m of 4.77% Zn+Pb, 12.8 g/t Ag incl 2.1 m of 17.9% Zn+Pb, 36.8 g/t Ag Hole O
Slide 9: Proactive and Ongoing Stakeholder Engagement
Proactive and Ongoing Stakeholder Engagement 9
Slide 10: Project Olza Milestones – Completed and Projected
Project Olza Milestones – Completed and Projected • Acquire >150 sq km concessions ACQUISITION & 2010-2011 • Collate and assess historical project database PLANNING • Assemble experienced project team • Complete 28,000 m confirmation drilling program RESOURCE 2011-2012 • Announce substantial
Slide 11: Forecast Timeline Based on Permitting Process in Poland
Forecast Timeline Based on Permitting Process in Poland Property Folio/Geological Documentation – 13 volumes of current and historical geological data Environmental Impact Assessment (EIA) – data collection and studies underway Baseline data collection – 18 months Project Description develop
Slide 12: Share Capital Structure & Enterprise Value
Share Capital Structure & Enterprise Value Listed March 2011 on TSX:V ticker RTH C$34 million fundraising 118.08 million common shares outstanding 4.77 million options outstanding 12
Slide 13: Management and Directors
Management and Directors David J. Copeland (Chairman) Dave Copeland is a professional engineer and mining executive with over 30 years' experience in advancing mineral projects through feasibility, permitting, engineering design and initial development phases. Mr. Copeland is a Director of Hunter Di
Slide 14: Technical Managers, Consultants & Advisors
Technical Managers, Consultants & Advisors TECHNICAL MANAGERS Lena Brommeland (General Manager, Poland) Lena Brommeland has a degree in geology and more than 20 years’ experience managing major exploration projects in Alaska, British Columbia and around the world. Her experience includes managing on
Slide 15: Appendix
moe | HDOWNEY APPENDIX
Slide 16: Preliminary Economic Assessment Qualified Persons
Preliminary Economic Assessment Qualified Persons Qualified Person Company Professional Designation Sections of the Report Project Management and Christopher Bray BEng, MAusIMM(CP) Mining BSc (Hons), MSc, PhD, Dr Lucy Roberts Mineral Resource MAusIMM (CP) Geology, Sampling and Dr Christopher Bonson
Slide 17: Current Mineral Resource
Current Mineral Resource Project Olza Inferred Mineral Resources Cut-off Tonnes Zn Pb Zn+Pb Contained Zn Contained Pb Zn% (millions) (%) (%) (%) (millions lb) (millions lb) 2.0 24.4 5.53 1.49 7.02 2,975 802 3.0 18.8 6.43 1.59 8.02 2,660 658 4.0 14.1 7.42 1.70 9.12 2,304 528 5.0 10.4 8.44 1.81 10.25
Slide 18: PEA Conceptual UG Mine Layout and Stope Access
PEA Conceptual UG Mine Layout and Stope Access Source: PEA Technical Report 18
Slide 19: PEA Metallurgy and Process Design
PEA Metallurgy and Process Design Standard flotation results in marketable zinc and lead concentrates, recoveries of 89% LOM zinc recovery producing 56% zinc concentrate 88.5% LOM lead recovery producing 70% lead concentrate Simplified Process Flow Sheet Source: PEA Technical Report 19
Slide 20: Established Mining and Refining Infrastructure
Established Mining and Refining Infrastructure * Rodaki-Rokinto-Szlacheckie 20
Slide 21: Zinc Smelters in Europe
Zinc Smelters in Europe AMPLE OPPORTUNITIES FOR CONCENTRATE SALES 21
Slide 22: Expandable Resource Base
Expandable Resource Base See next page for additional details on historical estimates 22
Slide 23: Historical Estimates for Zawiercie Property
Historical Estimates for Zawiercie Property Zawiercie Historical Estimates by PGI Year of Number of Metres Period of Deposit Category Mt % Zn % Pb Estimate Holes Drilled Drilling 2008 C-1 + C-2 17.0 5.80 2.32 1994 C-1 16.3 6.00 2.50 Most Zawiercie I 1990 510 Unknown C-1 34.5 4.92 1.98 pre-1975 1977
Slide 24: Current Program – Drill Results
Current Program – Drill Results Drill Hole From To Length Zn+Pb Zn Pb Ag Number (m) (m) (m) * (%) (%) (%) (g/t) OLZ-226 99.00 99.50 0.50 1.32 0.61 0.71 3.4 102.70 106.30 3.60 1.76 0.95 0.81 2.4 incl 102.70 104.00 1.30 2.71 1.12 1.59 4.0 OLZ-228 97.90 103.90 6.00 2.77 2.56 0.21 9.0 incl 97.90 100.30
Slide 25: Contact Information
Contact Information Rathdowney Resources Head Office Investor Services 15th Floor Phone: 604.684.6365 1040 W. Georgia Street TF: 800.667.2114 Vancouver, BC www.rathdowneyresources.com Canada V6E 4H1