Rumble Resources Limited · ASX:RTR
Rumble Resources — 121 Mining Investment Online Conference (November 2020)
20 slides from Rumble Resources's conference presentation, Nov 9, 2020
Slide 1: Company Presentation
9 November 2020 Company Presentation Rumble Resources Ltd Rumble Resources Limited (ASX: RTR) (“Rumble” or “the Company”) is pleased to make available a copy of the presentation that Managing Director Shane Sikora will be delivering Suite 9, 36 Ord Street, at the upcoming 121 Mining Investment Onlin
Slide 2: Significant High-Grade Gold System and Multiple Tier 1 Projects
Image: Western Queen High-Grade Gold Central Open Pit (historic production 190,000 oz @ 8.9 g/t Au) . Significant High-Grade Gold System and Multiple Tier 1 Projects November 2020 WWW.RUMBLERESOURCES.COM.AU ASX: RTR | PAGE 1
Slide 3: Multiple Near Term Catalysts
Multiple Near Term Catalysts Drilling a Pipeline of Projects ❖ 2 Drill Programs Completed ➢ Phase 3 Western Queen Project - High-Grade Au Discovered ➢ Fraser Range Thunderstorm Project - High-Grade Au Discovered ❖ 2 Drill Programs – Completed Awaiting Assays ➢ Munarra Gully Project - ‘Tier 1' Au-Cu-
Slide 4: Corporate Overview
Corporate Overview Capital Structure RTR Chart Since January 2020 Shares on Issue # 523m Unlisted Options on Issue 1 2 3 # 35M Cash4 A$ $5.5m Market Cap * as of 9th November 2020 A$ $75m 1. 9mil 8c options (22 December 2020) 2. 9mil 15c Options (22 December 2022) 3. 15mil Performance Options 20c, 30
Slide 5: Western Queen Project – High-Grade Au System
1. Western Queen Project – High-Grade Au System 2.7km of Gold Mineralisation and Open ASX: RTR | PAGE 4
Slide 6: Western Queen Project – High-Grade Au System
1. Western Queen Project – High-Grade Au System Multiple High-Grade Au Shoot Targets The Duke and Western Queen Central • Multiple High-Grade Gold Shoots • Same style of structural control • Same mineralisation style with High-Grade Gold hosted in tremolite skarn (after pyroxene skarn – diopside) •
Slide 7: Western Queen Project – High-Grade Au System
1. Western Queen Project – High-Grade Au System Near Surface Au Resources Image : WQ South Open Pit Close and WQ Central Open Pit in the Distance Table 1 – Western Queen Project Resource Estimate (table subject to rounding) ASX: RTR | PAGE 6
Slide 8: Western Queen Project – High-Grade Au System
1. Western Queen Project – High-Grade Au System WQ Shear Zone Extension – New Au Discovery Image : Newly Discovered Marquis Zone south of WQ South Deposit Marquis Zone – New Gold Discovery • 500m of gold mineralisation defined in WQ Shear Zone to the South of the WQ South Deposit • Over 5km of strik
Slide 9: Western Queen Project – High-Grade Au System
1. Western Queen Project - High-Grade Au System WQ Shear Zone High Grade Au Structure Western Queen Project (RTR 100%) The Duke (North of WQ Central) • 8m @ 26.27 g/t Au from 14m (WQRC155) • 6m @ 25.87 g/t Au from 48m (WQRC157) • 7m @ 60.6 g/t Au from 70m – (WQJC-32) • 6m @ 37.34 g/t Au from 50m – (
Slide 10: Thunderstorm JV & Thunderbolt Projects
2. Thunderstorm JV & Thunderbolt Projects - Tier 1 Fraser Range Au Targets Thunderstorm JV Project (IGO 70% RTR 30%) • Reconnaissance AC drilling 1.5km by 400m intersected widespread gold throughout the project including high-grade gold at Themis: o 16m @ 6.69 g/t Au from 42m (20AFAC11321) o 6m @ 9.
Slide 11: Fraser Range Ni-Cu Targets
2. Thunderdome JV Project – Tier 1 Fraser Range Ni-Cu Targets Thunderdome JV Project (IGO 70% RTR 30%) Sailfish Ni-Cu Tier 1 Targets • Magnetic low/gravity high features conceptual targets analogous of Legend Mining’s Mawson Ni-Cu discovery (Located 30km NE along trend) Old Soldiers Ni-Cu-Zn Tier 1
Slide 12: Lamil JV Project – Tier 1 Paterson Province Au-Cu Targets
3. Lamil JV Project – Tier 1 Paterson Province Au-Cu Targets Lamil JV Project (RTR 100% - AIC Earning up to 65%) • AIC Mines can earn 50% interest by spending $6 million at Lamil over 4 years, Thereafter AIC can earn a further 15% by spending $4 million over 1 year if Rumble does not elect to contri
Slide 13: Munarra Gully Project – Tier 1 Large-Scale Au-Cu-Ag Targets
4. Munarra Gully Project – Tier 1 Large-Scale Au-Cu-Ag Targets Munarra Gully Project - Amaryllis Prospect (100% RTR) High-grade Au mineralisation: ▪ 5m @ 11.67 g/t Au from 161m (AMRC008) ▪ 2m @ 13.45 g/t Au from 92m (AMRC012) ▪ 4m @ 6.21 g/t Au from 94m (AMRC006 – 4m composites) Significant Au-Cu-Ag
Slide 14: Braeside Project – Large Scale System
5. Braeside Project – Large Scale System 45 Priority Cu-Au-Zn-Pb-Ag Targets Braeside Project (70% RTR) • Regional Scale Porphyry to Epithermal System from surface • Large-scale mineralised system over 60km in strike and 8km in width • 45 Priority Cu-Au-Zn-Pb- Ag targets generated - all capable of di
Slide 15: Earaheedy Project – Tier 1 Large-Scale Zn-Pb-Ag Targets
6. Earaheedy Project – Tier 1 Large-Scale Zn-Pb-Ag Targets Earaheedy Project (RTR 75%) Two Large Scale Zn-Pb-Ag Discoveries: • At Chinook, higher-grade Zn-Pb confirmed over 200m horizontal width and up to 12m vertical true thickness (within 41m Zn-Pb broad zone) • Magazine and Chinook are 10.5km apa
Slide 16: Investment Summary
Investment Summary ▪ Rumble executing de-risked pipeline of projects strategy ▪ Multiple near-term discovery catalysts ❖ Drilling High-Grade Gold System ❖ Drilling Multiple ‘Tier 1’ Systems ❖ Drilling Large Scale System ▪ Strong cash position ▪ Successful Technical Director – Twice AMEC “Prospector
Slide 17: Location of Projects
Location of Projects Multiple Avenues to Discovery ASX: RTR | PAGE 16
Slide 18: Rumble Contacts – Thank You
Rumble Contacts – Thank You Shane Sikora, Managing Director https://twitter.com/RumbleResources E: info@rumbleresources.com.au Web: www.rumbleresources.com.au https://www.linkedin.com/company/ rumble-resources-ltd ASX: RTR | PAGE 17
Slide 19: Disclaimer
Disclaimer Disclaimer; ▪ This presentation has been prepared by Rumble Resources Limited (Rumble or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete
Slide 20: Appendix 1 – Earaheedy Exploration Target
Appendix 1 Earaheedy Exploration Target Rumble’s Zn-Pb Exploration Target at the Earaheedy Project is between 40 to 100 million tonnes at a grade ranging between 3.5% Zn-Pb to 4.5% Zn-Pb. The Exploration Target is at a shallow depth (80m), and over 40kms of prospective strike (completely open) has b
Rumble Resources — 121 Mining Investment Online Conference (November 2020) on 6ix