Emperor Energy Ltd · ASX:EMP

Emperor Energy — AEP Conference 2024

14 slides from Emperor Energy's conference presentation, May 20, 2024

  1. Slide 1: AEP Conference Presentation

    AEP Conference Presentation 2.2 Tcf P50 Prospective Recoverable Gas Resource Offshore Gippsland Basin - Victoria 1 20th May 2024

  2. Slide 2: Introducing Emperor Energy Team

    Introducing Emperor Energy Team A team of experienced E&P and corporate professionals Phil McNamara Carl Dumbrell Nigel Harvey Malcolm King Geoff Geary Director Director Director Project & BD Geological Consultant Consultant • 37 years in the • Chartered • Former investment • ~30 years’ experience •

  3. Slide 3: Judith Gas Field – Key Points

    Judith Gas Field – Key Points • Judith Gas Field in the 100% Emperor Energy Owned Vic/P47 Exploration Permit – Located in Bass Strait • Discovered Contingent Resource with much larger Prospective Resource: – 198 BCF (P50) 2C Contingent Resource Recoverable around Judith-1 Well Drilled in 1989 – 2.2

  4. Slide 4: Judith Gas Field, Gippsland Basin, 40km offshore

    Judith Gas Field, Gippsland Basin, 40km offshore A New pipeline to shore at Orbost Gas Plant would provide access to East Coast domestic gas market Detailed Judith Gas Pipeline and Gas Plant Pre-Feed Study was completed in 2020 in conjunction with APA Regional Asset Ownership • Exxon / Woodside - Ki

  5. Slide 5: Longtom-1 to Judith-1 to Kipper-1

    Longtom-1 to Judith-1 to Kipper-1 Cross-section of Longtom and Judith reservoir sequences Judith 1 & 2 sands well developed at Judith-1 compared to thin or poorly developed equivalent Longtom 500 sands across Longtom gas field Ltom 400 thin compared to expanded thick JGS 3 & 4 sections developed at

  6. Slide 6: Judith Gas Field Structural Configuration

    Judith Gas Field Structural Configuration The shallowest Judith reservoir (JGS1) was interpreted to Longtom where it correlated with the Longtom 500 Gas Sand 6

  7. Slide 7: Judith-1 to Judith-2 Appraisal Well Location

    Judith-1 to Judith-2 Appraisal Well Location NW Judith-2 (proposed) Judith-1 ESE Base Campanian Volcanics Base Golden Beach Sand -1778 m -2077 m Top JGS 1 -2542 m Strzelecki Base JGS 2 Base JGS 4 Longtom Sands TD -3300 m Longtom Sands Top Turonian Volcanics

  8. Slide 8: Recent Game Changing Permeability Analysis

    Recent Game Changing Permeability Analysis Zone Depth Interpretation Net Porosity % Av. Permeability Av.Gas Saturation Thickness mD % Gas Sand 2370m to Mobile Gas 40.5 14.1 12.3 52.2 1 2441m Gas Sand 2489m to Mobile Gas 38.8 15.0 24.2 63.8 2 2543m Gas Sand 2626m to Mobile Gas 63.1 13.6 5.2 61.1 3 27

  9. Slide 9: Judith-1 Well Gas Production Simulation Flow Modelling

    Judith-1 Well Gas Production Simulation Flow Modelling • Gas production simulation modelling was limited strictly to the 198 BCF of discovered 2C Contingent Gas Resource • Located within the Judith Fault Block • Immediately surrounding the Judith-1 Gas Discovery Well drilled by Shell in 1989 and not

  10. Slide 10: AvO-Modelled Mobile Gas in stacked Judith and Longtom Gas Sand Reservoirs

    AvO-Modelled Mobile Gas in stacked Judith and Longtom Gas Sand Reservoirs Vic/P47 • An additional independent AVO analysis has been completed by recognised subject matter expert Jarrod Dunne • Analysis has been calibrated against the mobile gas columns in the Judith-1 Well as defined by Steve Adams

  11. Slide 11: Shuey Fluid Factor Judith Gas Sand

    Shuey Fluid Factor Judith Gas Sand 2 Vic/P47 • AVO map of Judith Gas Sand 2 shows lateral extent of gas effect response across the Judith Gas Field. • The seismic cross section line used for Jarrod Dunne’s analysis is shown in yellow

  12. Slide 12: Longtom demonstrates high flow rates from Emperor sands

    Longtom demonstrates high flow rates from Emperor sands Longtom-H3 (2006) flow tested – Longtom 400 @ 30 MMscfd – Longtom 300, 200 & 100 @ 77 MMscfd Peak Longtom production flow rates of 56-77 MMscfd achieved from two horizontal wells: Longtom-3H and Longtom-4H Production Test #2 flowed 77 MMscfd

  13. Slide 13: Great Caesar Gold Mining Lease – Key Points

    Great Caesar Gold Mining Lease – Key Points • EMP plans future income from the Great Caesar Mining Leases to cover overheads while progressing Judith Gas Field Vic/P47 • Sales and Purchase Agreement in place to purchase 3 Mining Leases • Conditional settlement extended till end of May 2024 • Located

  14. Slide 14: Contact Details

    Contact Details: Phil McNamara 0428409584 philmcnamara@outlook.com.au Carl Dumbrell 0402 277 282 carl@emperorenergy.com.au

Emperor Energy — AEP Conference 2024 on 6ix