Iron Road Ltd · ASX:IRD

Iron Road — Investor Presentation (June 2011)

25 slides from Iron Road's investor presentation, Jun 14, 2011

  1. Slide 1: Prefeasibility Study Presentation

    For personal use only Prefeasibility Study Presentation On the Road to Production 14-17 June 2011

  2. Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements For personal use only This presentation contains forward looking statements concerning the projects owned by Iron Road Limited. Statements concerning mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates

  3. Slide 3: Overview

    Overview For personal use only On the Road to Production • Focused on Central Eyre Iron Project (CEIP) • Experienced board, management and study consultants • Supportive key investors • Positive government and local communities • PFS result at the CEIP indicates a robust 12.4Mtpa iron project – Comp

  4. Slide 4: Board & Management

    Board & Management For personal use only Chairman Non-Exec Director Non-Exec Director Julian Gosse Ian Hume Jerry Ellis Non-Exec Director Managing Director Company Secretary Matthew Keegan Andrew Stocks Graham Anderson General Land Geology Project Manager Manager Manager Manager Larry Ingle Laura Mi

  5. Slide 5: Corporate Overview

    Corporate Overview For personal use only Capital Structure $1.20 Market Cap $129 million $1.00 Shares on Issue 113.7M Options 24.6M $0.80 Share Price $1.135 $0.60 As at 9 June 2011 Major Shareholders $0.40 The Sentient Group 29.2% $0.20 Management 10.6% Columbia University 5.4% $0.00 Dec 08 Dec 09 A

  6. Slide 6: Central Eyre Iron Project

    Central Eyre Iron Project For personal use only • Iron Road’s primary project • Centrally located on Eyre Peninsula, South Australia • Well serviced by established towns on road and rail networks • Favourable geographical and climatic location • Supportive state and local governments • Good relation

  7. Slide 7: What Differentiates the CEIP?

    What Differentiates the CEIP? For personal use only CEIP magnetite gneiss Typical BIF Age Archaean Proterozoic Geological history High grade metamorphism Low grade metamorphism Mineralogy Granular, low impurities Microcrystaline, impurities vary 1.5mm average, crystalline Magnetite grain size Very f

  8. Slide 8: PFS Summary

    PFS Summary For personal use only • Substantial 12.4Mtpa iron product operation outlined • Capital and operating costs compare favourably to similar Australian projects • Close to coast, power and with existing infrastructure • Significant competitive advantages – Coarse grind size (-106 micron) → r

  9. Slide 9: PFS Key Parameters

    PFS Key Parameters For personal use only • Commercial viability for a 12.4 million tonne per annum standalone iron concentrate operation Capex – direct A$1,744M • Competitive capital and operating costs Capex – indirect A$517M • Coarse grained magnetite, low variability – excellent product character

  10. Slide 10: Low Strip Ratio

    Low Strip Ratio For personal use only • Mine design and scheduling by Coffey Mining • Large scale conventional mining • Open cut operation, with low strip ratio of 0.8 to 1 • Optimised pit depth of 550m – may increase with latest drilling • Excellent geotechnical properties – (15m benches, 70º batte

  11. Slide 11: Large Resource with Great Upside

    Large Resource with Great Upside For personal use only 11

  12. Slide 12: Premium Concentrate Product

    Premium Concentrate Product For personal use only • Beneficiation design by Mineral Engineering Technical Services (METS) • Grind size of -106µm (p80) resulting in 67% Fe concentrate • Potential -125µm option currently being investigated • To be marketed as a high quality sinter feedstock • Blast Fu

  13. Slide 13: Benchmarking Concentrate Grade

    Benchmarking Concentrate Grade For personal use only 72 GIR-Yerecoin EMG-Beyondie VMC-Yalgoo Concentrate Grade - % iron 70 ARH-Balmoral IRD-CEIP (40 micron) AGO-Ridley IRD-CEIP (53 micron) GRR-Southdown 68 GBG-Karara CXM-Bungalow IRD-CEIP (106 micron) ACS-Magnetite Range IRD-CEIP (75 micron) 66 CFE-

  14. Slide 14: Simple Processing

    Simple Processing 67.6Mtpa For personal use only MURPHY SOUTH DEPOSIT ROM Ore P80~ 30 mm Mass 100% Crushing Fe: 16.8% SiO2: 53.0% Cleaner W-LIMS HPGR Tails Mass 43% DRY WET Rougher W-LIMS P80~106 m P80~8 mm 61% Fe: 24% Concentrate SiO2: 47 % 12.4Mtpa Tails Mass 18% Mass 39% Fe: 67% Ball Mill SiO2:

  15. Slide 15: Export Solution

    Export Solution For personal use only Base case PFS includes slurry pipeline to port PFS includes costs and charges to use a third-party port Potential upside including rail options have been considered at scoping level with encouraging results Project scale sufficient to justify development of stan

  16. Slide 16: Value Through Resource Growth

    Value Through Resource Growth 3,000 2,756 2,811 For personal use only Near Term Target 2,597 2,687 • Base case incorporates current 2,478 Murphy South Mineral Resource. 2,304 • Completed extension drilling 2,090 expected to increase Mineral NPV - $ millions 2,000 1,808 Resource by 80-120Mt1 this yea

  17. Slide 17: Value Scenarios

    Value Scenarios For personal use only Spot FOB price 30 year project 30 year project Item Units Base Case 1 over current life2, long term life2, Spot FOB resource pricing pricing Capital cost – A$ million 1,744 1,744 1,744 1,744 direct Capital cost – A$ million 508 508 508 508 indirect Contingency A

  18. Slide 18: Future Growth and Development Pathway

    Future Growth and Development Pathway For personal use only Additional Resource • On track to define a mineral resource estimate of considerable size and tonnage additional to the current 907Mt identified at Murphy South so far definition, with Stage VI • Exploration Target for the completed program

  19. Slide 19: On the Road to Production

    On the Road to Production For personal use only Credible, competitive project at Central Eyre Iron Project • Large scalable production base, simple beneficiation • Realisable capital cost, competitive operating cost • Premium product highly sought after • Large customer and offtake market Strong fut

  20. Slide 20: Contact Details

    For personal use only Contact Details www.ironroadlimited.com.au Andrew Stocks +61 8 9200 6020 admin@ironroadlimited.com.au Managing Director +61 403 226 748

  21. Slide 21: Appendices

    For personal use only Appendices

  22. Slide 22: Appendix 1a – CEIP Resource Statement

    Appendix 1a – CEIP Resource Statement For personal use only Murphy South Mineral Resource Estimate Tonnes Fe SiO2 Al2O3 P LOI Resource Classification Oxidation Material Type (Mt) (%) (%) (%) (%) (%) Disseminated 242 17.7 52.4 12.0 0.09 0.3 Fresh Banded 53 13.4 54.6 14.1 0.07 0.5 Inferred Transitiona

  23. Slide 23: Appendix 1b – CEIP Resource Statement

    Appendix 1b – CEIP Resource Statement For personal use only Boo-Loo Mineral Resource Estimate Tonnes Fe SiO2 Al2O3 P LOI Resource Classification Oxidation (Mt) (%) (%) (%) (%) (%) Fresh 277 17.3 52.5 11.5 0.095 0.5 Inferred Transitional 13 17.0 52.4 11.6 0.094 10.7 Oxide 38 17.2 52.1 11.6 0.094 10.8

  24. Slide 24: Appendix 1c – CEIP Resource Statement

    Appendix 1c – CEIP Resource Statement For personal use only Central Eyre Iron Project Global Mineral Resource Estimate Tonnes Fe SiO2 Al2O3 P LOI Resource Classification Oxidation (Mt) (%) (%) (%) (%) (%) Fresh 572 17.1 52.7 12.0 0.09 0.4 Inferred Transitional 40 16.5 51.2 13.2 0.07 7.3 Oxide 81 16.

  25. Slide 25: Appendix – Capital Cost Estimate

    Appendix 2 – Capital Cost Estimate For personal use only Estimated Estimated Estimated Direct Costs Indirect Costs Contingency A$ Millions A$ Millions A$ Millions Crushing circuit 244.1 Field indirect – 12.0% 209.3 Direct and indirect – 15% 337.8 Fine grind & mag sep 152.4 EPCM – 8.0% 139.5 Milling