Lincoln Minerals Limited · ASX:LML

Lincoln Minerals — Investor Presentation (September 2024)

15 slides from Lincoln Minerals's investor presentation, Sep 30, 2024

  1. Slide 1: Developing Australian Graphite, Uranium and Green Iron

    ASX:LML ASX: LML Developing Australian Graphite, Uranium and Green Iron Green Iron Project South Australia’s Best Undeveloped Magnetite Project 30 September 2024

  2. Slide 2: Important Notice and Disclaimer

    ASX:LML Important Notice and Disclaimer 2 Disclaimer, Competent Persons Statement and Precautionary Statement • The information contained in this document (“Presentation”) has been prepared Lincoln Minerals Limited forward-looking future performance and actual results or developments may differ mate

  3. Slide 3: Why Green Steel? Why Now?

    ASX:LML Why Green Steel? Why Now? 3 • What is Green Steel • Green Steel refers to steel production that reduces or Forecast Magnetite Iron Ore Demand- eliminates greenhouse gas emissions and other harmful Supply Gap environmental impacts • Why is Green Steel Important? • The shift to green steel is

  4. Slide 4: Lincoln Minerals' Green Iron Project, SA

    ASX:LML Lincoln Minerals’ Green Iron Project, SA 4 • 1.1 billion tonne magnetite JORC Mineral Resource* on SA’s Eyre Peninsula • Same geology as existing SIMEC magnetite concentrate operations nearby • Lincoln inherited the project during an iron ore price decline, via the wind up of Chinese-backed

  5. Slide 5: SA's best undeveloped magnetite asset by grade, size and closeness to major infrastructure

    SA’s best undeveloped magnetite asset by grade, size ASX:LML and closeness to major infrastructure Lincoln’s Green Iron Project has clear advantages due to scale, grade and proximity to port Groupings of magnetite resources in South Australia. The Middleback Range area (which hosts Lincoln’s Green I

  6. Slide 6: Green Iron Project History

    ASX:LML Green Iron Project History 6 Reframing for a New Era & New Markets • Centrex Metals Limited and Wuhan Iron and Steel Corp. (WISCO) signed Joint Venture in 2010 Iron Ore 62% Fe CFR China Spot Nominal • Approximately $75 million spent on development 180 studies** to produce standard magnetite

  7. Slide 7: Strong Government Support

    ASX:LML Strong Government Support 7 South Australian Green Iron & Steel Strategy • South Australian Government aims to develop a local Green Iron & Steel industry, based on SA’s unique competitive advantages: • Abundant and high-grade magnetite resources • Access to renewable energy • Strategy aims

  8. Slide 8: Starting From an Advanced Base

    ASX:LML Starting From an Advanced Base 8 • Previous advanced studies on two projects, collectively known as the Fusion Project. • Fusion Project Scoping Study competed in 2013, and significant advancement of Definitive Feasibility Studies (DFS) • Trade-off studies completed for utilities, grinding,

  9. Slide 9: Previous Concentrator Design

    ASX:LML Previous Concentrator Design 9 FLOWSHEET 3D DESIGN

  10. Slide 10: Repositioned for a Green Iron market

    ASX:LML Repositioned for a Green Iron market 10 Fusion Grind vs. Grade Curve • Historical relatively coarse P80 grind of 75µm 80 chosen to suit WISCO pellet feed needs 710 500 250 150 75 45 38 25 70 • Substantial optimisation potential exists to target a lower impurity Green Iron output 60 • Fusion

  11. Slide 11: Infrastructure Advantages

    ASX:LML Infrastructure Advantages 11 • Major logistics advantages over many regional iron ore projects • Proximal to existing Port Lincoln bulk port plus two proposed bulk port developments • Low-cost slurry pipeline ore transport, mirroring a proven solution already in place at SIMEC magnetite oper

  12. Slide 12: A Conceptual Phased Development Approach

    ASX:LML A Conceptual Phased Development Approach 12 Year 1 2 3 4 5 6 7 Secure Investment Partner • Phased development approach to optimise Fusion Phase 1 (3Mtpa) capital spend profile Gap Analysis & Scoping Study Update • Ability to accelerate study phases given the Rapid PFS & Mining Lease extensiv

  13. Slide 13: Lincoln's Partnering Process

    ASX:LML Lincoln’s Partnering Process 13 • Lincoln has commenced its own Expressions of Interest (EOI) • Lincoln is requesting potential EOI respondents prepare process to identify interested parties to advance its Green Iron a written submission covering: Project through to production. 1. Company in

  14. Slide 14: Fusion and Carrow Project – Appendix Mineral Resources Summary

    ASX:LML Fusion and Carrow Project – Appendix Mineral Resources Summary 14 Head Grade Concentrate Grade Deposit Name JORC Tonnage Classification (Mt) Fe SiO2 DTR Fe SiO2 Large, high-quality resource Bald Hills Inferred 289.4 (%) 26.8 (%) 51.0 21.9 (%) 67.4 (%) 5.2 • Lincoln's Green Iron Project boast

  15. Slide 15: For Further Information

    For Further Information: Jonathon Trewartha Chief Executive Officer Lincoln Minerals Limited Jonathon.trewartha@lincolnminerals.com.au 1300 137 116 Nathan Ryan Investor and Media Relations NWR Communications nathan.ryan@nwrcommunications.com.au +61 420 582 887 Community Enquiries Community@lincolnmi

Lincoln Minerals — Investor Presentation (September 2024) on 6ix