Cobre Limited · ASX:CBE

Cobre — Investor Presentation (May 2024)

25 slides from Cobre's investor presentation, May 6, 2024

  1. Slide 1: Kalahari Copper Belt, Botswana Corporate Presentation

    For personal use only Kalahari Copper Belt, Botswana Corporate Presentation May 2024 This presentation has been approved by the CEO, Adam Wooldridge and Executive Chairman, Martin C Holland 1 Sydney, May 2024 ASX: CBE

  2. Slide 2: Disclaimer

    Disclaimer Not for release to US wire services or distribution in the United States. For full exploration results including relevant JORC Table information and Competent Persons Statements referred to in this Company Presentation, refer to the Company’s announcements This investor presentation has b

  3. Slide 3: Corporate Snapshot

    For personal use only 01 Snapshot Corporate

  4. Slide 4: Corporate Structure

    Corporate Structure As at 1/05/2024 Capital Structure Shareholder Structure For personal use only Share Price (as at 1/05/24) A$0.073 Shares on issue 331.13M STRATA INVESTMENT HOLDINGS PLC Market Capitalisation A$24.1M 22% 4% HSBC CUSTODY NOMINEES Cash Position1 c.A$4M 3% 3% (AUSTRALIA) LIMITED Unli

  5. Slide 5: Fueling Copper's Future Growth

    Fueling Copper's Future Growth Robust Exploration and Development Pipeline for High-Quality Copper Resources For personal use only Strategic Global Land Package Global Presence with district-scale discovery opportunities. Sandiman Armada 51% Sediment hosted Exploration and 14.4% base metals Developm

  6. Slide 6: Kalahari Copper Belt

    For personal use only 02 Kalahari Copper Belt

  7. Slide 7: Why the Kalahari Copper Belt?

    Why the Kalahari Copper Belt? In 2023 KCB becomes a copper producing district: Khoemacau Copper Mine and exploration assets sold for 1.9 B$ to MMG 1; For personal use only Sandfire’s Motheo Production hub starts production in record time. KCB remains unexplored and is regarded as one of the world’s

  8. Slide 8: Strategic Land Position

    Strategic Land Position For personal use only 100%-ownership of highly-prospective copper and silver exploration tenements in the KCB. KML Kalahari Copper Belt Second largest tenement package in the KCB consisting of four Project Areas: Ngami Copper Project (727 km2), Kitlanya East (1,359 km2), Kitl

  9. Slide 9: Discovery: Three-Pronged Approach to Discovery

    03 For personal use only Discovery Three-Pronged Approach to Discovery Focused Explore Big Identify the next tier 1 deposit with Exploration support from BHP Xplor Development Potential Prove viability for copper-silver extraction using in-situ recovery Strategic Target Drilling Potential for short-

  10. Slide 10: Explore Big: Finding the Next Tier deposit on the northern KCB Margin

    Explore Big : Finding the Next Tier 1 deposit on the northern KCB Margin Cobre is a cohort for the Big thinking discovery focussed 2024 BHP Xplor programme exploration with support from BHP through the Xplor Programme For personal use only Strategically located near the basin margin of the KCB - typ

  11. Slide 11: Strategic Target Drilling: Okavango Copper Project

    Strategic Target Drilling : Okavango Copper Project Ongoing Diamond Drilling Targets Mineralisation along Strike from MMG’s Zone 5 Production For personal use only Strike extension from known deposits along strike from Zone5, Zone5N, Zeta, Selena and Plutus deposits. Correct setting On the margin re

  12. Slide 12: Ngami Copper Project: Scope for Development?

    Ngami Copper Project: Scope for Development? 40km Strike For personal use only of Copper Silver Mineralisation Consistent chalcocite mineralisation intersected along extensive strike lengths Structurally controlled high-grade intersections include: 9.3m @ 3.4% Cu 10.7m @ 1.3% Cu and 30g/t Ag and 18

  13. Slide 13: Ngami Copper Project Modelling Highlights

    Ngami Copper Project Modelling Highlights Significant Scale and et Untested Upside Com Inte rste llar For personal use only The estimates of tonnage and grade for exploration target category are conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is un

  14. Slide 14: Ngami Copper Project: Essential Criteria for In-Situ Copper Recovery

    Ngami Copper Project Essential Criteria for In-Situ Copper Recovery For personal use only Mineralisation suitable for Ore Body below Suitable Host Acid Leaching: Water Table: Rock Permeability Fine-grained chalcocite ideal for Water table at 130m to 140m below Detailed fracture logging, AI-driven hy

  15. Slide 15: In-Situ Copper Recovery: Active Pump Tests Prove Hydrogeology

    In-Situ Copper Recovery : Active Pump Tests Prove Hydrogeology For personal use only Drilling of injection and monitoring wells into the primary mineralised fracture zone and less permeable hangingwall and footwall completed )("'&(*'"+ Short term injection pumping of water demonstrates amenable perm

  16. Slide 16: In-Situ Copper Recovery: Engineering scoping and financial study

    In-Situ Copper Recovery : Engineering scoping and financial study For personal use only Commencement of Scoping Study To evaluate the application of ISCR and alternative methods Gap Analysis Optimal Mining / Extraction Methods Process Design Economic study to provide a financial model 16 May 2024 AS

  17. Slide 17: For personal use only

    For personal use only Geological factors prevent 95% of copper projects from using this specific In-Situ Copper Recovery mining method! Click Here to watch the video ASX: CBE

  18. Slide 18: Stage Gated Exploration

    For personal use only 04 Stage Gated Exploration

  19. Slide 19: Stage Gated Strategy to Advance Exploration and Development Projects

    Stage Gated Strategy to Advance Exploration and Development Projects ISCR development Big-scale target generation Strategic Target drilling 2024 For personal use only Injection Pump Testing Assess priority portions of the Kalahari Copper Test priority targets where copper Complete hydrogeological dr

  20. Slide 20: Indicative Exploration Timeline

    Indicative Exploration Timeline 2024 Q1 Q2 Q3 Q4 Ngami Copper Project For personal use only Hydrogeological pump tests and modelling ! ! Metallurgical column tests Economic scoping study ! ! Resource diamond drilling ! Kitlanya West Project Seismic survey ! Target drilling ! Okavango Copper Project

  21. Slide 21: Investment Summary

    Investment Summary Strategic Global Land Package: vast land package, district-scale discovery opportunities for copper deposits. For personal use only Accelerated Development Potential in Botswana projects present discovery and copper development opportunities. Support from BHP through the 2024 Xplo

  22. Slide 22: Appendix

    For personal use only Appendix

  23. Slide 23: Board of Directors

    Board of Directors Strong Leadership For personal use only Martin C Holland Adam Wooldridge Dr Ross McGowan Michael McNeilly Michael Addison Andrew Sissian Executive Chairman Chief Executive Officer Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director Mr Hollan

  24. Slide 24: In Situ Recovery Comparisons

    In Situ Recovery Comparisons For personal use only Taseko Mines Limited Florence Copper 363 mT @ 0.35% Cu (M+I)1 Pre-Tax IRR 49% Well field drilling site infrastructure development started CAPEX US$232m Tracking towards first copper production in Q4 2025 OPEX US$1.11 / lb Pre-Tax NPV = US$1,090m Est

  25. Slide 25: For more information contact

    For personal use only For more information contact: www.cobre.com.au info@cobre.com.au His Excellency Mokgweetsi Masisi (President), Hon Lefoko Moagi (Minister of Mines), Her Excellency Ms Dorcas Kobela Makgato (High Commissioner to Australia) with Cobre’s CEO Adam Wooldridge and Chairman Martin Hol