Industrial Minerals Limited · ASX:IND
Industrial Minerals — Investor Presentation (May 2022)
12 slides from Industrial Minerals's investor presentation, May 13, 2022
Slide 1: Diversified Industrial Mineral Developer with a Primary Focus on High Purity Silica Sands
DIVERSIFIED INDUSTRIAL MINERAL DEVELOPER WITH A PRIMARY FOCUS ON HIGH PURITY SILICA SANDS May 2022 ASX: IND
Slide 2: Disclaimer
DISCLAIMER This presentation contains summary information about Industrial Minerals Ltd (IND) and is current as of 12 May 2022. The information in this presentation is of a general background and does not purport to be complete. This presentation is not investment or financial product advice (nor ta
Slide 3: Project Selection – High Purity Silica Sands
QUALITY PROJECT SELECTION – Tier 1 quality HPSS product, >99% SiO2, Low Fe2O3, Ti2O3 & Al2O3, optimum size distribution HIGH PURITY SILICA SANDS LOCATION THEMATIC Private landholders – extraction of sand improves soil & has minimum “Dynamics of High Purity Silica Sands industry are changing fast. en
Slide 4: High Purity Silica Sands Market
HIGH PURITY SILICA SANDS MARKET HIGH PURITY SILICA SANDS
Slide 5: Chinese Market
CHINESE MARKET • Importing of silica sands is increasing • Domestic supply is interrupted due to increasing compliance with higher environmental standards • Shortage in low iron feed stock • Australia export to China is on the rise • >90 million tonnes market and ~45 million tonnes used in glass ind
Slide 6: Building a Portfolio of High Purity Silica Sands Projects
BUILDING A PORTFOLIO OF HIGH PURITY SILICA SANDS PROJECTS • From 7 HPSS Project when listed, IND has built a portfolio of 14 HPSS projects covering over 3100 km2 • Selection has been directed by 3 key drivers - Quality, Location and Profitability • Focus is now on systematic exploration and evaluati
Slide 7: Stockyard Project Update
STOCKYARD PROJECT UPDATE • Located 4km from the Brand Hwy, and 180km by road to the Geraldton port • Substantial granted tenement package of 477km2 and a further ~97km2 under application • Private Land Access Agreements in place and Native Title extinguished land • Auger drilling ongoing with furthe
Slide 8: Stockyard Project Development
STOCKYARD PROJECT DEVELOPMENT • Mining Lease application to be submitted in May 22 • Significant progress on Scoping Study with: • Maiden Mineral Resource Estimate • Logistics Study High purity silica sand bodies defined • Environmental Report by auger drilling • Heritage Activity Notice and Survey
Slide 9: 2022 HPSS Exploration Plan
2022 HPSS EXPLORATION PLAN STOCKYARD PROJECT Q2 2022 Q3 2022 Q4 2022 Mining Lease Application Maiden Mineral Resource Trial Mining, Bulk Sample and Trial Shipment Scoping Study Project Commencement Decision High Purity Silica Sand Exploration Project Priority: • High – Stockyard, Bookara, Waroona, N
Slide 10: Strategic Industrial Minerals Projects
Tabba Tabba STRATEGIC INDUSTRIAL • Strategically located in close proximity to Port Hedland • Existing solar marine salt operations adjacent to exploration licence MINERALS PROJECTS • Favourable weather conditions for solar evaporation • Salt is fundamental for chemical industries, food manufacturin
Slide 11: Corporate Snapshot
CORPORATE SNAPSHOT Non-Executive Chair – Ashley Pattison Mr Pattison has over 20 years’ experience in the resources sector from both a corporate finance and operational perspective. A qualified chartered accountant, he has extensive Total Shares on Issue 63.5M experience in operations, finance, stra
Slide 12: Have Questions? Get in Touch with Industrial Mineral Ltd
HAVE QUESTIONS? GET IN TOUCH WITH INDUSTRIAL MINERAL LTD Unit 38, 460 Stirling Highway Peppermint Grove, WA, 6011 Australia +61 8 6270 6316 | admin@industmin.com www.industmin.com
Industrial Minerals — Investor Presentation (May 2022) on 6ix