Asiamet Resources Limited · LSE:ARS

Asiamet Resources — Investor Presentation (February 2016)

24 slides from Asiamet Resources's investor presentation, February 2016

  1. Slide 1: Building a Leading Asia Pacific Copper-Gold Company

    Slide 1: Building a Leading Asia Pacific Copper-Gold Company

    Building a Leading Asia Pacific Copper‐Gold Company Corporate Presentation February 2016 TSX.V & AIM: ARS

  2. Slide 2: Forward Looking Statement

    Slide 2: Forward Looking Statement

    Forward Looking Statement This document has been prepared by Asiamet Resources Corporation Limited (the “Company” or “Asiamet”) solely for informational purposes. This presentation is the sole responsibility of the Company. Information contained herein does not purport to be complete and is subject

  3. Slide 3: Why Copper? Market Fundamentals Support Strong Long Term Copper Price

    Slide 3: Why Copper? Market Fundamentals Support Strong Long Term Copper Price

    Why Copper? Market Fundamentals Support Strong Long Term Copper Price Refined copper consumption by region 1950 – 2013 Incremental Copper Mine Supply 2000‐2025E (kt) Source: WBMS, Wood Mackenzie, BMO Capital Markets Copper Project Capital Intensity vs Average Global Incremental Greenfield Copper Pro

  4. Slide 4: Why Copper? Price Outlook

    Slide 4: Why Copper? Price Outlook

    Why Copper? Price Outlook Short Term Relative Weakness – Long Term Strength Source: Deutsche Bank 450 1500 $5.00 400 $4.50 1000 Market Balance (kt) Copper Price (c/lb) 350 $4.00 300 500 $3.50 250 $3.00 0 200 $2.50 150 ‐500 $2.00 100 $1.50 ‐1000 50 $1.00 0 ‐1500 $0.50 1990 1993 1996 1999 2002 2005 20

  5. Slide 5: Building a Leading Asia Pacific Copper-Gold Company

    Slide 5: Building a Leading Asia Pacific Copper-Gold Company

    Building a Leading Asia Pacific Copper‐Gold Company  Large copper and gold Resource base (NI 43‐101 compliant)  Significant Resource growth potential already identified Quality Assets  Near term small‐med scale copper development opportunity at KSK Project (BKM Deposit) coupled with a large coppe

  6. Slide 6: Corporate Overview

    Slide 6: Corporate Overview

    Corporate Overview Proven track record in Indonesia Board and Senior Management Capital Structure Tony Manini Deputy Chairman, CEO Capital Structure TSX.V AIM Geologist, 28+ yrs Rio Tinto, Oxiana/OZ Multiple discoveries and mine Shares 574.6m developments in Asia and Australia. Co‐founder Tigers Rea

  7. Slide 7: Indonesia: A Mining Country

    Slide 7: Indonesia: A Mining Country

    Indonesia A Mining Country  4th Largest Coal producer, Largest Coal exporter  2nd Largest producer of Tin and Nickel  13th Largest Copper producer  13th Largest Gold producer  Mining industry accounts for >10% of GDP  Minerals and related products 20% of exports  Favorable logistics, proximit

  8. Slide 8: Indonesian Projects Summary

    Slide 8: Indonesian Projects Summary

    Indonesian Projects Summary Beutong IUP Jelai IUP KSK CoW Beutong IUP Summary KSK CoW Summary  Large Copper and Gold Resource at  Advanced stage exploration project – PEA Beutong East, West and Skarn with NI 43‐ in progress on BKM deposit 101 compliant technical report  Significant Indicated and

  9. Slide 9: Portfolio Overview – Positioned for Growth

    Slide 9: Portfolio Overview – Positioned for Growth

    Portfolio Overview – Positioned for Growth  KSK Project ‐ Near Term Medium Scale Copper Development Opportunity KSK Project KSK Project KSK Project BK Main Copper Project BKS, BKW, BKZ Prospects Baroi, FEZ Prospects Status Advanced Exploration Exploration Exploration Interest 100% 100% 100% Commodi

  10. Slide 10: KSK CoW - Location and Infrastructure

    Slide 10: KSK CoW - Location and Infrastructure

    KSK COW ‐ Location and Infrastructure Excellent Access and Logistics  The KSK CoW is located approximately 165km NW of Palangkaraya, Central Kalimantan  Palangkaraya serviced by 4 flights per day from Jakarta  Access to site is via all weather road. 6 hours drive from Palangkaraya, capital city o

  11. Slide 11: KSK Project BKM Copper Deposit

    Slide 11: KSK Project BKM Copper Deposit

    KSK Project BKM Copper Deposit Near Term Copper Development Opportunity with Resource Growth  Extensive 1.1 x 1 km near surface copper deposit with potential for very low strip ratio. Discrete high grade zones.  NI43‐101 Compliant Resources Indicated 15Mt at 0.7% Cu (0.2% Cut) 231MIbs (105kt) Copp

  12. Slide 12: KSK Project BKM Copper Deposit: 2015 Work Program

    Slide 12: KSK Project BKM Copper Deposit: 2015 Work Program

    KSK Project BKM Copper Deposit 2015 Work Program ‐ Excellent Results – PEA Well Advanced  ARS evaluating potential to fast track development of the BKM copper deposit via low strip ratio open pit mining and heap leach SX‐EW processing to A B produce 15‐20Kt copper cathode per annum BK044 High  Con

  13. Slide 13: KSK Project BKM Copper Deposit: Shallow Deposit

    Slide 13: KSK Project BKM Copper Deposit: Shallow Deposit

    KSK Project BKM Copper Deposit Shallow Deposit – Low Strip Ratio Open Pit Mining – Discrete High Grade Zones  2015 drilling identified two discrete zones of shallow Section BKM32550 17m @ 0.77% Cu Incl. 4m @ 1.55% Cu 24m @ 0.92% Cu 22m @ 1.25% Cu 7.5m @ 4.11% Cu 53.2m @ 0.73% Cu Incl. 29.2m @ 1.02%

  14. Slide 14: 2015-16 Work Program

    Slide 14: 2015-16 Work Program

    2015‐16 Work Program KSK Project Timeline 14

  15. Slide 15: KSK Project – District Potential

    Slide 15: KSK Project – District Potential

    KSK Project – District Potential High Quality Stand Alone Gold and Base Metal Targets  Numerous copper, polymetallic Cu‐Au‐Pb‐Zn‐Ag and gold only prospects throughout the KSK CoW  BKZ Prospect outcropping massive sulphide style mineralization. Drilling intersected 16m @ 5.8% Zn, 2.8% Pb, 0.64g/t A

  16. Slide 16: Beutong Project – Exciting Cu-Au Discovery

    Slide 16: Beutong Project – Exciting Cu-Au Discovery

    Beutong Project – Exciting Cu‐Au Discovery Quality Deposit with Significant Upside Potential  Large, high quality porphyry Cu‐Au‐Mo deposit Refer Appendix 1 – Beutong Mineral Resource  Measured + Indicated Resources  1.2BIbs Cu, 0.4Moz Au, 5.7Moz Ag, 20Mlbs Mo (100% basis).  Inferred Resources 

  17. Slide 17: Beutong Project – Infrastructure Advantage

    Slide 17: Beutong Project – Infrastructure Advantage

    Beutong Project – Infrastructure Advantage Road, Power, Port Infrastructure nearby  Beutong Project is located 60 km inland and NE of the township of Meulaboh, Aceh  Access to project site is via partially sealed roads from the regional towns of Meulaboh and Takengon  Meulaboh has a population of

  18. Slide 18: Beutong Project – Mine Development Potential

    Slide 18: Beutong Project – Mine Development Potential

    Beutong Project – Mine Development Potential Comparative Metrics Highly Favourable v Current Producing Mines  Significant scale – deposit remains open with potential for considerable resource growth upside Beutong (0.5% Cutoff)  Grade compares very favourably with those of operating mines in Phu K

  19. Slide 19: Jelai Gold Project – Summary

    Slide 19: Jelai Gold Project – Summary

    Jelai Gold Project – Summary Quality Small‐Med Scale Gold Project with Upside Potential  Low‐sulphidation epithermal gold veins Mewet Vein Drill Results  Encouraging results from drilling (DDH) • JCM‐69 4.75m @ 19.69g/t Au, 102.32g/t Ag from 22.75m  Approximately 2,000m of vein strike • JM018 4.5

  20. Slide 20: Delivering on Plan

    Slide 20: Delivering on Plan

    Asiamet Resources Delivering on Plan Delivering on Plan • Closed transaction with Tigers Realm Metals Pty Ltd (Jan 2015) to acquire Beutong project. Adds 3Mt contained Copper + Gold • New highly experienced management team. Fast track development strategy. • Confirmed +30 year tenure for KSK COW wit

  21. Slide 21: Rapidly moving up the Value Curve

    Slide 21: Rapidly moving up the Value Curve

    Asiamet Resources Rapidly moving up the Value Curve  Asiamet has one of the largest copper Resource inventories amongst the listed junior copper company sector  Potential exists for this inventory to grow rapidly as the Company updates Resources at the KSK project and increases its interest* in th

  22. Slide 22: Why Invest in Asiamet Resources?

    Slide 22: Why Invest in Asiamet Resources?

    Why Invest in Asiamet Resources?  Quality Assets and People Substantial copper Resources, Solid grade, Significant upside Near Surface ‐ Readily amenable to open pit mining – Discrete Higher Grade Zones Excellent access, logistics and infrastructure Solid government and community relationships Team

  23. Slide 23: Appendix 1. Beutong Project – Mineral Resource

    Slide 23: Appendix 1. Beutong Project – Mineral Resource

    Appendix 1. Beutong Project – Mineral Resource Large Cu‐Au‐Mo deposit with higher grade core from surface Beutong 2014 Resource Estimate (100% Basis) ‐ Report at 0.3% Cu Lower Cut Grade Metal Classification Tonnes Mineralisation Mo (NI 43‐101) (Mt) Cu (%) Au (ppm) Ag (ppm) Cu (Mlb) Au (kOz) Ag (kOz)

  24. Slide 24: Contact Information

    Slide 24: Contact Information

    Contact Information ARS – TSX.V and AIM Contact Information: Tony Manini Deputy Chairman and CEO M: +61 3 8644 1300 E: tony.manini@asiametresources.com W: www.asiametresources.com 24

Source: Internet Archive copy of asiametresources.com

More decks from Asiamet Resources Limited

All 31 Asiamet Resources decks