Legend Mining Limited · ASX:LEG

Legend Mining — RIU Explorers Conference February 2019

16 slides from Legend Mining's conference presentation, Feb 19, 2019

  1. Slide 1: RIU Explorers Conference February 2019

    ASX:LEG 1 RIU Explorers Conference February 2019

  2. Slide 2: Disclosure

    DISCLOSURE This is not a disclosure document. Any material used in this presentation is a summary of selected data, and any investor in Legend Mining Limited should refer to all Legend Mining Limited ASX releases and statutory reports before considering to invest in the company. Any forward looking

  3. Slide 3: Contents

    CONTENTS 1. Nickel Market Commentary 2. About Legend  Investment Case  Rockford Project Location  Rockford Project Activities 3. Summary 3 “Prospective Fraser Range”

  4. Slide 4: Nickel Prices and Inventory

    NICKEL MARKET COMMENTARY – ABOUT NICKEL Nickel Prices and Inventory • Balance in deficit since 2016, predicted to continue • Stockpiles diminishing from peak 900Kt (2015)* • Price increase from US$3.80/lb (2016) to US$5.60/lb ($7.13 max April 2018) • Tariff and trade-war - Brexit - uncertainty – neg

  5. Slide 5: About Legend

    ABOUT LEGEND  ASX listed exploration company  Market capitalisation ~$61M (2B shares @ 3cps)  Cash and liquids ~$6.5M as at 31 December 2018 (includes $3M receivable from Jindal)  Fraser Range – Rockford Project Chairman Managing Director Exec. Director - Technical Company Secretary Michael Atki

  6. Slide 6: Investment Case: Fundamentals

    INVESTMENT CASE Fundamentals • Right People  Experienced corporate and technical team  JV Partner and major shareholder - Creasy Group (regional experience) • Biggest block on best street (2,379km2 in Fraser Zone) • Main Commodity – Nickel (stockpiles diminishing – price rising) • Cashed up (sever

  7. Slide 7: Project Location

    PROJECT LOCATION Rockford Project • Located in northern Fraser Range district • 120km NE of Nova / 100km S of Tropicana • 100% within Fraser Zone (15% of total area) • Project potential for − Nova style Nickel-Copper − Tropicana style Gold • Infrastructure access – transport, power 7 “Project potent

  8. Slide 8: Area D – Right Location

    AREA D – RIGHT LOCATION • Within the Fraser Zone  Defined by 430km long gravity “trend”  Mapped as mafic / ultramafic intrusives  Analogies to Thompson Belt in Canada which contains clusters of orebodies  Contains three gravity “Hot Spots” • Area D on margin of central “Hot Spot” • Nova and Silv

  9. Slide 9: Fraser Zone Land Holders

    FRASER ZONE LAND HOLDERS MAIN PLAYERS  Legend Active & Funded  Creasy Group Active & Private  Independence (“IGO”) Active & ~$2.8B Mkt Cap  Galileo Mining New IPO – Creasy backed  Regional spend producing results – value add 9  Leverage play is Legend

  10. Slide 10: Rockford Project Update – Systematic Approach

    ROCKFORD PROJECT UPDATE – SYSTEMATIC APPROACH Summary to Date • 25 Areas selected from aeromag and gravity • 32 conductors identified by innovative MLTEM • Drilling: 4 diamond holes for 2,652m 10 RC holes for 2,266m 524 aircore holes for 34,700m • Exploration spend Sept 15 to Dec 18 - $11.2M (Tax re

  11. Slide 11: Rockford Project Update – Current Programmes (Area D)

    ROCKFORD PROJECT UPDATE – CURRENT PROGRAMMES AREA D 2018 Aircore and innovative MLTEM programme • 9 new (D9-D17) and 2 remodelled (D3 & D5) conductors • Outstanding aircore geochemistry eg. RKAC183 – 14m @ 0.37% Ni, 0.43% Cu, 0.03% Co 2019 Programme - March commencement • New IP survey to assist dia

  12. Slide 12: Rockford Project Update – Current Programmes (Shackleton Prospect)

    ROCKFORD PROJECT UPDATE – CURRENT PROGRAMMES SHACKLETON PROSPECT Same stratigraphic package as Andromeda (IGO) 2018 Programme • Aircore drilling – 51 holes, 1,621m • Geochemical indications of VMS potential • First innovative MLTEM surveys – two conductors identified 2019 Planned Programme • RC dril

  13. Slide 13: Rockford Project Update – Current Programmes (New Prospects)

    ROCKFORD PROJECT UPDATE – CURRENT PROGRAMMES NEW PROSPECTS 2017 Programme • Area S – previously modelled S1 conductor 2018 Programme • Aircore drilling 5 holes 400m spacing RKAC505 – 9m @ 0.09% Cu, 0.06% Zn and 1.47g/t Au VMS potential • Regional line over mag low 400m spaced holes RKAC 520 – 11m @

  14. Slide 14: Current/Future Programmes - Summary

    CURRENT/FUTURE PROGRAMMES - SUMMARY 2019  Ongoing regional aircore programme – total to date 524 holes – 34,700m  Continued systematic approach MLTEM, FLTEM, LF EM, IP surveys  Follow up RC/DD testing Aircore Rig, Rockford Project EM Surveying , Rockford Project 16

  15. Slide 15: Summary

    SUMMARY • Highly Prospective Rockford Project − Three years on ground <10% area first pass EM tested • Systematic/persistent/committed = going the distance! • Well Funded • Experienced Stable Team and JV Partner Creasy says to Wilson: “This is what it looks like – go find it!” • Grow Shareholder Val

  16. Slide 16: Thank You

    SIR Nov 2011 (Nova discovery July 2012) 18 THANK YOU LEG May 2018

Legend Mining — RIU Explorers Conference February 2019 on 6ix